舉報

會員
GB50660-2011大中型火力發電廠設計規范(英文版)
最新章節:
22.3 Occupational Health
本規范適用于蒸汽初參數為超高壓及以上、單臺機組容量在125MW及以上,采用直接燃燒方式、主要燃用固體化石燃料的火力發電廠工程的設計。
最新章節
- 22.3 Occupational Health
- 22.2 Occupational Safety
- 22.1 Basic Requirement
- 22 Firefighting and Occupational Safety and Health
- 21.7 Soil and Water Conservation
- 21.6 Environmental Protection Monitoring
品牌:中國計劃出版社有限公司
上架時間:2020-09-25 15:21:47
出版社:中國計劃出版社
本書數字版權由中國計劃出版社有限公司提供,并由其授權上海閱文信息技術有限公司制作發行
- 22.3 Occupational Health 更新時間:2020-09-25 15:24:45
- 22.2 Occupational Safety
- 22.1 Basic Requirement
- 22 Firefighting and Occupational Safety and Health
- 21.7 Soil and Water Conservation
- 21.6 Environmental Protection Monitoring
- 21.5 Noise Prevention and Control
- 21.4 Treatment and Comprehensive Utilization of Ash and Gypsum
- 21.3 Waste Water and Warm Water Discharge Treatment
- 21.2 Prevention and Control of Atmospheric Pollution
- 21.1 Basic Requirement
- 21 Environmental Protection and Soil and Water Conservation
- 20.7 Refrigerating Station,Heating Station,and Piping Network in the Plant Area
- 20.6 Other Auxiliary and Ancillary Buildings
- 20.5 Chemical Building
- 20.4 Coal Handling Building
- 20.3 Electrical Buildings and Electrical Equipment
- 20.2 Main Power House
- 20.1 Basic Requirement
- 20 Heating,Ventilation and Air Conditioning
- 19.9 Supporting Structure of Air-cooled Condenser
- 19.8 Hydraulic Buildings and Structures
- 19.7 Coal Handling Buildings and Structures
- 19.6 Chimney
- 19.5 Main Power House Structure
- 19.4 Subgrade and Foundation
- 19.3 Architectural Design
- 19.2 Seismic Resistant Design
- 19.1 Basic Requirement
- 19 Buildings and Structures
- 18 Auxiliary and Ancillary Facilities
- 17.9 Water Supply and Drainage
- 17.8 Air Cooling System
- 17.7 Water Surface Cooling
- 17.6 Wet Cooling Tower
- 17.5 Pipeline and Channel
- 17.4 Water Intake Buildings(Structures)
- 17.3 Cooling Water System
- 17.2 Water Source and Water Management
- 17.1 Basic Requirement
- 17 Hydraulic Facilities and Systems
- 16.15 Other Electrical Facilities
- 16.14 Inner Communication
- 16.13 System Communication
- 16.12 Dispatching Automation Subsystem
- 16.11 System Relaying Protection and Security Automatic Equipment
- 16.10 Grounding System
- 16.9 Sizing and Cabling of Cables
- 16.8 Lighting System
- 16.7 Relay Protection for Components
- 16.6 Electrical Monitoring and Control
- 16.5 High Voltage Switchyards
- 16.4 DC System and AC Uninterruptible Power Supplies(UPS)
- 16.3 AC Auxiliary Power System
- 16.2 Main Electrical Connection
- 16.1 Generator and Generator Transformer
- 16 Electrical Equipment and System
- 15.12 Instrument Tube,Cable,and Arrangement of Local Equipment
- 15.11 Control Power Supply
- 15.10 Auxiliary Workshop Control System
- 15.9 Unit Control System
- 15.8 Modulating Control
- 15.7 On-off Control
- 15.6 Protection System
- 15.5 Alarming System
- 15.4 Measurement and Instruments
- 15.3 Control Mode and Control Room
- 15.2 Level of Automation
- 15.1 Basic Requirement
- 15 Instrumentation and Control
- 14.11 Information Security
- 14.10 Cabling
- 14.9 Training Simulator
- 14.8 Access Guard Management System
- 14.7 Video Meeting System
- 14.6 Video Monitoring System
- 14.5 Price Bidding System
- 14.4 Management Information Systems
- 14.3 Supervisory Information System for Plant Level
- 14.2 Overall Plan of Plant Information System
- 14.1 Basic Requirement
- 14 Information System
- 13.9 Chemical Storage
- 13.8 Wastewater Treatment
- 13.7 Treatment for Makeup Water of District Heating System and Industrial Return Water
- 13.6 Chemical Dosing and Water-Steam Sampling for Thermal Process System
- 13.5 Cooling Water Treatment
- 13.4 Steam Turbine Condensate Polishing
- 13.3 Boiler Makeup Water Treatment
- 13.2 Water Pre-desalination
- 13.1 Water Quality and Water Pretreatment
- 13 Water Treatment System
- 12.9 Condenser and Its Auxiliary Facilities
- 12.8 Auxiliary System and Equipment of Cogeneration Units
- 12.7 Cooling Water System of Auxiliary Equipment
- 12.6 Drainage System
- 12.5 Condensate System
- 12.4 Deaerator and Feedwater Storage Tank
- 12.3 Feedwater System
- 12.2 Main Steam,Reheat Steam and Bypass System
- 12.1 Steam Turbine Equipment
- 12 Steam Turbine Equipment and Systems
- 11.4 Ammonia/Air Mixing and Injecting System
- 11.3 Flue Gas Denitration Reaction System
- 11.2 Reducing Agent Storage and Supply System
- 11.1 Basic Requirement
- 11 Flue Gas Denitration Reaction System
- 10.5 Desulphurization by-Product Treatment System
- 10.4 Flue Gas System
- 10.3 Sulfur Dioxide Absorbing System
- 10.2 Absorbent Preparation System
- 10.1 Basic Requirement
- 10 Flue Gas Desulphurization System
- 9.6 Ash Disposal Area
- 9.5 Auxiliary Facilities
- 9.4 Ash Handling System Outside the Power Plant
- 9.3 Fly Ash Handling System
- 9.2 Bottom Ash Handling System
- 9.1 Basic Requirement
- 9 Ash Handling System
- 8.9 Circulating Fluidized Bed(CFB)Boilers
- 8.8 Startup Boiler
- 8.7 Auxiliary Systems of Boilers
- 8.6 Ignition and Combustion Supporting Fuel System
- 8.5 Start-up System of Once-Through Boilers
- 8.4 Flue Gas Precipitator and Emission System
- 8.3 Air and Flue Gas System
- 8.2 Pulverized Coal Preparation
- 8.1 Boiler Equipment
- 8 Boiler Equipment and System
- 7.9 Auxiliary Coal Handling Facilities
- 7.8 Limestone Milling System for CFB Boilers
- 7.7 Coal Handling System for Circulating Fluidized Bed(CFB)Boiler
- 7.6 Coal Mixing Facilities
- 7.5 Screening and Crushing Devices
- 7.4 Belt Conveyor
- 7.3 Coal Storage Facilities
- 7.2 Coal Unloading Facilities
- 7.1 Basic Requirement
- 7 Coal Handling System
- 6.9 Requirements on Comprehensive Facilities
- 6.8 Maintenance
- 6.7 Arrangement of Flue Gas Denitration Facilities
- 6.6 Arrangement of Flue Gas Desulphurization Facilities
- 6.5 Main Control Room and Electronic Equipment Room
- 6.4 Arrangement of Boiler
- 6.3 Arrangement of Coal Bunker Bay
- 6.2 Arrangement of Turbine House and Deaerator Bay
- 6.1 Basic Requirement
- 6 General Arrangement of Main Power House
- 5.4 Design Performance Indicators of Units
- 5.3 Capacity Matching between Main Equipment
- 5.2 Type Selection of Main Equipment
- 5.1 Unit Parameters
- 5 Unit Type Selection
- 4.3 Plant Area Planning and General Layout
- 4.2 Off-site Planning
- 4.1 Basic Requirement
- 4 Overall Planning
- 3.4 Requirements on the Operation Capability of the Units under Abnormal Conditions
- 3.3 Requirements on Operating and Regulating Performance of Generating Units
- 3.2 Technical Requirements on the Connection of Power Plant to the Power System
- 3.1 Basic Requirement
- 3 Requirements of Electric Power System on Fossil Fired Power Plants
- 2 Terms
- 1 General
- Foreword
- Announcement of Ministry of Housing and Urban-Rural Development of the People's Republic of China
- 版權信息
- 封面
- 封面
- 版權信息
- Announcement of Ministry of Housing and Urban-Rural Development of the People's Republic of China
- Foreword
- 1 General
- 2 Terms
- 3 Requirements of Electric Power System on Fossil Fired Power Plants
- 3.1 Basic Requirement
- 3.2 Technical Requirements on the Connection of Power Plant to the Power System
- 3.3 Requirements on Operating and Regulating Performance of Generating Units
- 3.4 Requirements on the Operation Capability of the Units under Abnormal Conditions
- 4 Overall Planning
- 4.1 Basic Requirement
- 4.2 Off-site Planning
- 4.3 Plant Area Planning and General Layout
- 5 Unit Type Selection
- 5.1 Unit Parameters
- 5.2 Type Selection of Main Equipment
- 5.3 Capacity Matching between Main Equipment
- 5.4 Design Performance Indicators of Units
- 6 General Arrangement of Main Power House
- 6.1 Basic Requirement
- 6.2 Arrangement of Turbine House and Deaerator Bay
- 6.3 Arrangement of Coal Bunker Bay
- 6.4 Arrangement of Boiler
- 6.5 Main Control Room and Electronic Equipment Room
- 6.6 Arrangement of Flue Gas Desulphurization Facilities
- 6.7 Arrangement of Flue Gas Denitration Facilities
- 6.8 Maintenance
- 6.9 Requirements on Comprehensive Facilities
- 7 Coal Handling System
- 7.1 Basic Requirement
- 7.2 Coal Unloading Facilities
- 7.3 Coal Storage Facilities
- 7.4 Belt Conveyor
- 7.5 Screening and Crushing Devices
- 7.6 Coal Mixing Facilities
- 7.7 Coal Handling System for Circulating Fluidized Bed(CFB)Boiler
- 7.8 Limestone Milling System for CFB Boilers
- 7.9 Auxiliary Coal Handling Facilities
- 8 Boiler Equipment and System
- 8.1 Boiler Equipment
- 8.2 Pulverized Coal Preparation
- 8.3 Air and Flue Gas System
- 8.4 Flue Gas Precipitator and Emission System
- 8.5 Start-up System of Once-Through Boilers
- 8.6 Ignition and Combustion Supporting Fuel System
- 8.7 Auxiliary Systems of Boilers
- 8.8 Startup Boiler
- 8.9 Circulating Fluidized Bed(CFB)Boilers
- 9 Ash Handling System
- 9.1 Basic Requirement
- 9.2 Bottom Ash Handling System
- 9.3 Fly Ash Handling System
- 9.4 Ash Handling System Outside the Power Plant
- 9.5 Auxiliary Facilities
- 9.6 Ash Disposal Area
- 10 Flue Gas Desulphurization System
- 10.1 Basic Requirement
- 10.2 Absorbent Preparation System
- 10.3 Sulfur Dioxide Absorbing System
- 10.4 Flue Gas System
- 10.5 Desulphurization by-Product Treatment System
- 11 Flue Gas Denitration Reaction System
- 11.1 Basic Requirement
- 11.2 Reducing Agent Storage and Supply System
- 11.3 Flue Gas Denitration Reaction System
- 11.4 Ammonia/Air Mixing and Injecting System
- 12 Steam Turbine Equipment and Systems
- 12.1 Steam Turbine Equipment
- 12.2 Main Steam,Reheat Steam and Bypass System
- 12.3 Feedwater System
- 12.4 Deaerator and Feedwater Storage Tank
- 12.5 Condensate System
- 12.6 Drainage System
- 12.7 Cooling Water System of Auxiliary Equipment
- 12.8 Auxiliary System and Equipment of Cogeneration Units
- 12.9 Condenser and Its Auxiliary Facilities
- 13 Water Treatment System
- 13.1 Water Quality and Water Pretreatment
- 13.2 Water Pre-desalination
- 13.3 Boiler Makeup Water Treatment
- 13.4 Steam Turbine Condensate Polishing
- 13.5 Cooling Water Treatment
- 13.6 Chemical Dosing and Water-Steam Sampling for Thermal Process System
- 13.7 Treatment for Makeup Water of District Heating System and Industrial Return Water
- 13.8 Wastewater Treatment
- 13.9 Chemical Storage
- 14 Information System
- 14.1 Basic Requirement
- 14.2 Overall Plan of Plant Information System
- 14.3 Supervisory Information System for Plant Level
- 14.4 Management Information Systems
- 14.5 Price Bidding System
- 14.6 Video Monitoring System
- 14.7 Video Meeting System
- 14.8 Access Guard Management System
- 14.9 Training Simulator
- 14.10 Cabling
- 14.11 Information Security
- 15 Instrumentation and Control
- 15.1 Basic Requirement
- 15.2 Level of Automation
- 15.3 Control Mode and Control Room
- 15.4 Measurement and Instruments
- 15.5 Alarming System
- 15.6 Protection System
- 15.7 On-off Control
- 15.8 Modulating Control
- 15.9 Unit Control System
- 15.10 Auxiliary Workshop Control System
- 15.11 Control Power Supply
- 15.12 Instrument Tube,Cable,and Arrangement of Local Equipment
- 16 Electrical Equipment and System
- 16.1 Generator and Generator Transformer
- 16.2 Main Electrical Connection
- 16.3 AC Auxiliary Power System
- 16.4 DC System and AC Uninterruptible Power Supplies(UPS)
- 16.5 High Voltage Switchyards
- 16.6 Electrical Monitoring and Control
- 16.7 Relay Protection for Components
- 16.8 Lighting System
- 16.9 Sizing and Cabling of Cables
- 16.10 Grounding System
- 16.11 System Relaying Protection and Security Automatic Equipment
- 16.12 Dispatching Automation Subsystem
- 16.13 System Communication
- 16.14 Inner Communication
- 16.15 Other Electrical Facilities
- 17 Hydraulic Facilities and Systems
- 17.1 Basic Requirement
- 17.2 Water Source and Water Management
- 17.3 Cooling Water System
- 17.4 Water Intake Buildings(Structures)
- 17.5 Pipeline and Channel
- 17.6 Wet Cooling Tower
- 17.7 Water Surface Cooling
- 17.8 Air Cooling System
- 17.9 Water Supply and Drainage
- 18 Auxiliary and Ancillary Facilities
- 19 Buildings and Structures
- 19.1 Basic Requirement
- 19.2 Seismic Resistant Design
- 19.3 Architectural Design
- 19.4 Subgrade and Foundation
- 19.5 Main Power House Structure
- 19.6 Chimney
- 19.7 Coal Handling Buildings and Structures
- 19.8 Hydraulic Buildings and Structures
- 19.9 Supporting Structure of Air-cooled Condenser
- 20 Heating,Ventilation and Air Conditioning
- 20.1 Basic Requirement
- 20.2 Main Power House
- 20.3 Electrical Buildings and Electrical Equipment
- 20.4 Coal Handling Building
- 20.5 Chemical Building
- 20.6 Other Auxiliary and Ancillary Buildings
- 20.7 Refrigerating Station,Heating Station,and Piping Network in the Plant Area
- 21 Environmental Protection and Soil and Water Conservation
- 21.1 Basic Requirement
- 21.2 Prevention and Control of Atmospheric Pollution
- 21.3 Waste Water and Warm Water Discharge Treatment
- 21.4 Treatment and Comprehensive Utilization of Ash and Gypsum
- 21.5 Noise Prevention and Control
- 21.6 Environmental Protection Monitoring
- 21.7 Soil and Water Conservation
- 22 Firefighting and Occupational Safety and Health
- 22.1 Basic Requirement
- 22.2 Occupational Safety
- 22.3 Occupational Health 更新時間:2020-09-25 15:24:45