6 General Arrangement of Main Power House
6.1 Basic Requirement
6.1.1 The general layout of the main power house shall be adaptable to the electric power production process,satisfy the requirements for installation,operation and maintenance and ensure that equipment layout is rational,space utilization is compact,the piping,wiring,and cabling is short,simple and neat,and the accesses for patrol inspection are unobstructed.
6.1.2 The areas in the main power house shall be arranged according to the functional requirements of the equipment and systems in a centralized and combined manner to attain definite function division and simple system connections.If the actual technical process and environmental conditions permit,the auxiliary equipment should be arranged outdoors or semi-outdoors.
6.1.3 The main power house may be arranged in three rows consisting of turbine house,coal bunker bay or combined deaerator and coal bunker bay,and boiler house,or in four rows consisting of turbine house,deaerator bay,coal bunker bay,and boiler house,or in other forms such as side coal bunker arrangement mode.
6.1.4 The arrangement of main power house shall provide favorable working environment for operation and maintenance personnel,comply with the applicable national labor protection codes currently in force;and the equipment arrangement shall meet the relevant requirements for protection against fire,explosion,damp,dust,corrosion,and freezing.
6.1.5 The color of facilities,panels,pipelines and platform staircases surrounding and within the main power house area shall be concordant.The platform staircases and railings should be of uniform sizes.
6.1.6 The column spacing in main power house should be uniform;and unequal column spacing can also be adopted provided that it can meet the arrangement requirements of the main equipment.
6.1.7 The arrangement of main power house shall be considered reasonably according to the plant area terrain,equipment characteristics and construction conditions.
6.1.8 The arrangement of main power house shall allow for further expansion according to the requirements of overall planning.
6.1.9 The arrangement of directly air-cooled system shall be in harmony with that of main power house,and shall comply with 17.8.4 herein.
- GB/T 50381-2018 城市軌道交通自動售檢票系統工程質量驗收標準
- GB/T 50537-2017 油氣田工程測量標準
- GB/T 51146-2015 硝化甘油生產廢水處理設施技術規范
- GB50526-2010公共廣播系統工程技術規范(英文版)
- GB 51287-2018 煤炭工業露天礦土地復墾工程設計標準
- GB/T 51338-2018 分布式電源并網工程調試與驗收標準
- GB 51177-2016 升船機設計規范
- DL/T 5491-2014 電力工程交流不間斷電源系統設計技術規程
- DL/T5161.3-2002電氣裝置安裝工程質量檢驗及評定規程第3部分:電力變壓器、油浸電抗器、互感器施工質量檢驗(英文版)
- 核電站鋼板混凝土結構技術標準
- GB 50084-2017 自動噴水滅火系統設計規范
- 機械基礎地基動力特性測試規程
- GB 51136-2015 薄膜晶體管液晶顯示器工廠設計規范
- 標準貫入試驗規程
- GB/T 51200-2016 高壓直流換流站設計規范