3 Requirements of Electric Power System on Fossil Fired Power Plants
3.1 Basic Requirement
3.1.1 In the electric power system,fossil-fired power units can be classified into base load units,peak load regulation units,black start units,cogeneration units,and resource comprehensive utilization units.
3.1.2 The base load units shall be highly reliable and stable and can effectively participate in the primary and secondary frequency modulation of the power grid.
3.1.3 The peak load regulation units shall meet the requirements of quick start-up,flexible load changes and can accommodate frequent start/shut-down operations.
3.1.4 The black start units shall be capable of starting up,the grid-connected power generating on their own without the aid of any external power supply.
3.1.5 The cogeneration units shall serve to supply both electricity and heat,and during the period of heat-supply for outside customers they shall have higher reliability.
3.1.6 For resource comprehensive utilization units that burn fuels with low heat values,such as gangue,coal slime and oil shale,the requirements on reliability and flexibility should not be too stringent.
- DL/T 5526-2017 換流站噪聲控制設計規程
- 鋼鐵企業原料場工程設計標準
- GB 51289-2018 煤炭工業露天礦邊坡工程設計標準
- DL/T 5156.1-2015 電力工程勘測制圖標準 第1部分:測量
- 標準貫入試驗規程
- GB 51162-2016 重型結構和設備整體提升技術規范
- GB 51205-2016 精對苯二甲酸工廠設計規范
- 汽車故障診斷技巧與禁忌速查手冊
- GB 50404-2017 硬泡聚氨酯保溫防水工程技術規范
- DL 5068-2014 發電廠化學設計規范
- GB/T 51248-2017 天然氣凈化廠設計規范
- GB/T 51223-2017 公共建筑標識系統技術規范
- 鋼鐵渣處理與綜合利用技術標準
- DL/T5236-2010±800kV及以下直流架空輸電線路工程施工質量檢驗及評定規程(英文版)
- GB 50384-2016 煤礦立井井筒及硐室設計規范