6.9 Requirements on Comprehensive Facilities
6.9.1 The underground facilities in the main power house shall be arranged in accordance with the following requirements:
1 Underground pipe trenches and cable raceways should not be provided in main power house.If it is unavoidable,they should not cross each other and measures shall be in place to prevent water from logging.
2 The water accumulated at the bottom floor shall be discharged to the collection well through water drain pipe network.The return pipes of cooling water from auxiliary equipment may be arranged overhead with pressure or buried underground.
3 Full basement should not be built beneath turbine house.If numerous devices are arranged at ground level of the turbine house and ground water level is not high,partial basement may be provided if demonstratedrationalthroughtechno-economiccomparison.Thearrangementofbasementsshall accommodate the requirements of transportation,water drainage,anti-moisture,ventilation,and lighting.
6.9.2 The cable laying and cable channels arrangement in the main power house area shall comply with the following requirements:
1 The cables should be laid in dedicated overhead trays,cable tunnels or conduit banks.Power cables and control cables should be laid separately.If overhead cable trays and cable tunnels are adopted,appropriate measures shall be taken to prevent accumulation of pulverized coal on cables and fire spreading.
2 The corridors of overhead trays shall be designed in combination with the main equipment and piping arranged in main power house,and should be kept clear of areas susceptible to fires.The overhead trays shall be routed and arranged to minimize the consumption of cables,and allow convenient construction and routine maintenance,and shall be orderly and visually pleasing.
3 The cable tunnels shall not serve as the drainage channels for other pipe trenches.If cable tunnels cross other pipe trenches,water-proof measures shall be taken appropriately.
6.9.3 The main emergency oil reservoir and other oil storage and baffling facilities provided for electrical equipment shall comply with the following requirements:
1 Underground emergency oil reservoir shall be provided for electrical equipment with capacity equaling to the oil capacity of the largest transformer and shall be provided with oil-water separator.
2 The oil storage and baffling facilities of electrical equipment shall be in line with the current national standard GB 50229,Code for Design of Fire Protection for Fossil Fuel Power Plants and Substations.
6.9.4 The chemical dosing and water-steam sampling devices of thermal system should be arranged inside the main power house in a relatively centralized way.The warehouse storing the chemicals to be dosed may be located close to the chemical dosing device.
- GB 50260-2013 電力設施抗震設計規范(英文版)
- DL/T 5528-2017 輸變電工程結算審核報告編制導則
- 工業企業技術改造升級投資指南:指南 解讀 案例(2023年版)
- 健康座椅
- GB 51138-2015 尿素造粒塔工程施工及質量驗收規范
- GB/T51050-2014鋼鐵企業能源計量和監測工程技術規范(英文版)
- DL/T5161.3-2002電氣裝置安裝工程質量檢驗及評定規程第3部分:電力變壓器、油浸電抗器、互感器施工質量檢驗(英文版)
- GB/T 50491-2018 鐵礦球團工程設計標準
- GB 50426-2016 印染工廠設計規范
- GB/T 51200-2016 高壓直流換流站設計規范
- DL/T5161.4-2002電氣裝置安裝工程質量檢驗及評定規程第4部分:母線裝置施工質量檢驗(英文版)
- 智能家電軟件功能安全標準解析與實踐
- GB50473-2008鋼制儲罐地基基礎設計規范(英文版)
- GB 51181-2016 煤炭洗選工程節能設計規范
- 建材工程術語標準