- GB50660-2011大中型火力發電廠設計規范(英文版)
- 中華人民共和國住房和城鄉建設部
- 154字
- 2020-09-25 15:24:16
3 Requirements of Electric Power System on Fossil Fired Power Plants
3.1 Basic Requirement
3.1.1 In the electric power system,fossil-fired power units can be classified into base load units,peak load regulation units,black start units,cogeneration units,and resource comprehensive utilization units.
3.1.2 The base load units shall be highly reliable and stable and can effectively participate in the primary and secondary frequency modulation of the power grid.
3.1.3 The peak load regulation units shall meet the requirements of quick start-up,flexible load changes and can accommodate frequent start/shut-down operations.
3.1.4 The black start units shall be capable of starting up,the grid-connected power generating on their own without the aid of any external power supply.
3.1.5 The cogeneration units shall serve to supply both electricity and heat,and during the period of heat-supply for outside customers they shall have higher reliability.
3.1.6 For resource comprehensive utilization units that burn fuels with low heat values,such as gangue,coal slime and oil shale,the requirements on reliability and flexibility should not be too stringent.
- 設計系統發展研究
- DL/T5161.1-2002電氣裝置安裝工程質量檢驗及評定規程第1部分:通則(英文版)
- GB 51179-2016 煤礦井下煤炭運輸設計規范
- GB/T50663-2011核電廠工程水文技術規范(英文版)
- GB 50471-2018 煤礦瓦斯抽采工程設計標準
- GB 51333-2018 厚膜陶瓷基板生產工廠設計標準
- DL/T5161.9-2002電氣裝置安裝工程質量檢驗及評定規程第9部分:蓄電池施工質量檢驗(英文版)
- GB 50169-2016 電氣裝置安裝工程 接地裝置施工及驗收規范
- 巖土工程勘察圖式圖例規程
- DL/T5231-2010±800kV及以下直流輸電接地極施工及驗收規程(英文版)
- 電力系統無功補償及調壓設計技術導則
- DL/T5236-2010±800kV及以下直流架空輸電線路工程施工質量檢驗及評定規程(英文版)
- GB/T 51242-2017 同步數字體系(SDH)光纖傳輸系統工程設計規范
- GB 50477-2017 紡織工業職業安全衛生設施設計標準
- GB/T 51252-2017 網絡電視工程技術規范