4 Equipment Installation
4.1 General Requirements
4.1.1 The equipment completely assembled and adjusted in the factory should not be disassembled at site but installed as a whole.
4.1.2 As for the equipment which is supplied in the form of parts and elements,their cleaning and assembly at site shall comply with the requirements of the design technical document or the current national standard General Code for Construction and Acceptance of Mechanical Equipment Installation Engineering(GB 50231).
4.1.3 The connection of equipment and pipes shall not be carried out by brute force.After completion of connection,it is required to recheck whether the installation accuracy of the equipment meets the requirement.
推薦閱讀
- DL/T 5526-2017 換流站噪聲控制設計規(guī)程
- GB50551-2010球團機械設備安裝工程質量驗收規(guī)范(英文版)
- YS/T 5225-2016土工試驗規(guī)程
- GB50168-2006電氣裝置安裝工程電纜線路施工及驗收規(guī)范(英文版)
- 健康座椅
- 濕陷性土起始壓力測試規(guī)程
- DL/T5161.5-2002電氣裝置安裝工程質量檢驗及評定規(guī)程第5部分:電纜線路施工質量檢驗(英文版)
- GB 51133-2015 醫(yī)藥工業(yè)環(huán)境保護設計規(guī)范
- GB/T 51025-2016 超大面積混凝土地面無縫施工技術規(guī)范
- GB 51156-2015 液化天然氣接收站工程設計規(guī)范
- 鉆探、井探、槽探操作規(guī)程
- DL/T 5028.3-2015 電力工程制圖標準 第3部分:電氣、儀表與控制部分
- GB 51247-2018 水工建筑物抗震設計標準
- GB 51199-2016 通信電源設備安裝工程驗收規(guī)范(英文版)
- 中國電池工業(yè)年鑒2018-2019