4.2 Equipment Foundation
4.2.1 Prior to equipment installation,the foundation shall be subject to hand-over and acceptance.The equipment foundation which is not subject to hand-over and inspection shall not be used for equipment installation.The hand-over and acceptance of equipment shall meet the following requirements:
1 The hand-over data shall be complete.The test record for foundation concrete block shall be checked and the foundation strength shall comply with the requirement of the design technical document.
2 The coordinate,elevation and dimension of the foundation shall be inspected.The coordination and elevation of anchor bolts shall all meet related requirements of the design technical document and the current national standard General Code for Construction and Acceptance of Mechanical Equipment Installation Engineering(GB 50231).
3 The laitance,greasy dirt,broken stones,soil and water shall be completely removed from the foundation surface and the preformed holes for anchor bolts.
4 The embedded anchor bolts shall be free of damage and protected with grease on its thread.
- DL/T 5528-2017 輸變電工程結算審核報告編制導則
- GB/T 51121-2015 風力發電工程施工與驗收規范
- 電動汽車工程手冊(第六卷):智能網聯
- GB 51185-2016 煤炭工業礦井抗震設計規范
- GB 50243-2016 通風與空調工程施工質量驗收規范
- DL/T 5508-2015 燃氣分布式供能站設計規范
- GB 51333-2018 厚膜陶瓷基板生產工廠設計標準
- GB/T 51238-2018 巖溶地區建筑地基基礎技術標準
- GB/T 50459-2017 油氣輸送管道跨越工程設計標準
- GB 50404-2017 硬泡聚氨酯保溫防水工程技術規范
- DL/T 5501-2015 凍土地區架空輸電線路基礎設計技術規程
- VRP11虛擬現實編輯器標準教程
- GB/T 51126-2015 波分復用(WDM)光纖傳輸系統工程驗收規范(英文版)
- GB50612-2010冶金礦山選礦廠工藝設計規范(英文版)
- 薄膜太陽能電池工廠設計標準