4 Equipment Installation
4.1 General Requirements
4.1.1 The equipment completely assembled and adjusted in the factory should not be disassembled at site but installed as a whole.
4.1.2 As for the equipment which is supplied in the form of parts and elements,their cleaning and assembly at site shall comply with the requirements of the design technical document or the current national standard General Code for Construction and Acceptance of Mechanical Equipment Installation Engineering(GB 50231).
4.1.3 The connection of equipment and pipes shall not be carried out by brute force.After completion of connection,it is required to recheck whether the installation accuracy of the equipment meets the requirement.
推薦閱讀
- GB 50388-2016 煤礦井下機車車輛運輸信號設計規范
- GB50950-2013光纜廠生產設備安裝工程施工及質量驗收規范(英文版)
- 配用電通信技術及產業發展報告
- GB/T 50943-2015 海岸軟土地基堤壩工程技術規范
- YD/T 5131-2005 移動通信工程鋼塔桅結構設計規范(英文版)
- GB50169-2006電氣裝置安裝工程接地裝置施工及驗收規范(英文版)
- 電磁式流量傳感器測量方法及理論
- GB/T 50770-2013 石油化工安全儀表系統設計規范(英文版)
- 水泥工廠環境保護設施設計標準
- GB 50169-2016 電氣裝置安裝工程 接地裝置施工及驗收規范
- 換流站接地極設計文件內容深度規定
- 汽車故障診斷技巧與禁忌速查手冊
- 鄭州軌道交通機電設備運營需求標準
- 平板玻璃工廠節能設計標準
- DL/T 5505-2015 電力應急通信設計技術規程