舉報

會員
GB51104-2015取向硅鋼生產線設備安裝與驗收規范(英文版)
中國冶金建設協會 著
更新時間:2020-09-25 11:13:47
開會員,本書免費讀 >
最新章節:
11.1 Safety
本規范共分11章,主要技術內容包括:總則,基本規定,設備基礎、地腳螺栓和墊板,設備及材料進場,剪切設備,帶鋼連接設備,帶鋼表面處理設備,臥式連續退火爐,烘烤爐,環形退火爐,安全及環保。本規范適用于取向硅鋼生產線設備安裝及質量驗收。中華人民共和國住房和城鄉建設部公告第813號住房城鄉建設部關于發布國家標準《取向硅鋼生產線設備安裝與驗收規范》的公告現批準《取向硅鋼生產線設備安裝與驗收規范》為國家標準,編號為GB51104-2015,自2016年2月1日起實施。其中,第2.0.17、11.1.7條為強制性條文,必須嚴格執行。本規范由我部標準定額研究所組織中國計劃出版社出版發行。住房城鄉建設部2015年5月11日
最新章節
- 11.1 Safety
- 11 Safety and Environmental Protection
- 10.11 Erection of Upper Trolley
- 10.9 Erection of Furnace Shell
- 10.3 Installation of Furnace Steel Structure
- 10.1 Installation of Backup Rollers and Guide Rollers
品牌:中國計劃出版社有限公司
上架時間:2020-09-25 11:07:21
出版社:中國計劃出版社
本書數字版權由中國計劃出版社有限公司提供,并由其授權上海閱文信息技術有限公司制作發行
- 11.1 Safety 更新時間:2020-09-25 11:13:47
- 11 Safety and Environmental Protection
- 10.11 Erection of Upper Trolley
- 10.9 Erection of Furnace Shell
- 10.3 Installation of Furnace Steel Structure
- 10.1 Installation of Backup Rollers and Guide Rollers
- 10 Rotary Annealing Furnace
- 8.7 Furnace Air Tightness Test
- 8.3 Erection of Furnace Chamber
- 8 Horizontal Continuous Annealing Furnace
- 7.9 Installation of Coater
- 7 Strip Surface Treatment Equipment
- 6.5 Installation of Narrow Lap Welder
- 6.3 Installation of Laser Welder
- 6 Strip Connection Equipment
- 4.2 Inspection and Acceptance of Equipment and Materials
- 4.1 General Requirements
- 4 Equipment and Materials Mobilization
- 3.6 Inspection and Acceptance of Base Plates
- 3.5 Erection of Base Plates
- 3.4 Inspection and Acceptance of Anchor Bolts
- 3.3 Erection of Anchor Bolts
- 3.2 Inspection and Acceptance of Equipment Foundation
- 3.1 Equipment Foundation Construction
- 3 Equipment Foundation,Anchor Bolt and Base Plate
- 2 Basic Requirements
- 1 General Provisions
- Explanation for Formulation of This Code
- Explanation of Provisions
- List of Quoted Standards
- Explanation of Wording in This Code
- Appendix E Non-load Test-run Record for Grain-Oriented Silicon Steel Production Line Engineering Equipment
- Appendix D Quality Acceptance Record for Unit Work of Grain-Oriented Silicon Steel Production Line Engineering Equipment Installation
- Appendix C Quality Acceptance Record for Subproject of Grain-Oriented Silicon Steel Production Line Engineering Equipment Installation
- Appendix B Quality Acceptance Record for Sub-divisional Work of Grain-Oriented Silicon Steel Production Line Engineering Equipment Installation
- Appendix A Classification Table of Subproject and Sub-divisional Work for Grain-oriented Silicon Steel Production Line Engineering Equipment Installation
- 11.2 Environmental Protection
- 11.1 Safety
- 11 Safety and Environmental Protection
- 10.14 Test-run of Rotary Annealing Furnace
- 10.13 Inspection and Acceptance of Furnace Door
- 10.12 Installation of Furnace Door
- 10.11 Erection of Upper Trolley
- 10.10 Inspection and Acceptance of Furnace Shell
- 10.9 Erection of Furnace Shell
- 10.8 Inspection and Acceptance of Rotating Steel Platform
- 10.7 Erection of Rotating Steel Platform
- 10.6 Inspection and Acceptance of Lower Trolley
- 10.5 Installation of Lower Trolley
- 10.4 Inspection and Acceptance of Furnace Steel Structure
- 10.3 Installation of Furnace Steel Structure
- 10.2 Inspection and Acceptance of Backup Rollers and Guide Rollers
- 10.1 Installation of Backup Roller and Guide Rollers
- 10 Rotary Annealing Furnace
- 9.7 Test-run of Baking Furnaces
- 9.6 Inspection and Acceptance of Furnace Equipment
- 9.5 Installation of Furnace Equipment
- 9.4 Inspection and Acceptance of Furnace Chamber
- 9.3 Erection of Furnace Chamber
- 9.2 Inspection and Acceptance of Baking Furnace Steel Platform
- 9.1 Erection of Steel Platform
- 9 Baking Furnace
- 8.8 Test-run of Horizontal Continuous Annealing Furnace
- 8.7 Furnace Air Tightness Test
- 8.6 Inspection and Acceptance of Furnace Equipment
- 8.5 Installation of Furnace Equipment
- 8.4 Inspection and Acceptance of Furnace Chamber
- 8.3 Erection of Furnace Chamber
- 8.2 Inspection and Acceptance of Furnace Steel Platform
- 8.1 Erection of Furnace Steel Platform
- 8 Horizontal Continuous Annealing Furnace
- 7.11 Test-run of Strip Surface Preparation Equipment
- 7.10 Inspection and Acceptance of Coater
- 7.9 Installation of Coater
- 7.8 Inspection and Acceptance of Oiler
- 7.7 Installation of Oiler
- 7.6 Inspection and Acceptance of Strip Dryer
- 7.5 Installation of Strip Dryer
- 7.4 Inspection and Acceptance of Roller
- 7.3 Installation of Roller
- 7.2 Inspection and Acceptance of Shot Blaster
- 7.1 Installation of Shot Blaster
- 7 Strip Surface Preparation Equipment
- 6.7 Test-run of Strip Connection Equipment
- 6.6 Inspection and Acceptance of Narrow Lap Welder
- 6.5 Installation of Narrow Lap Welder
- 6.4 Inspection and Acceptance of Laser Welder
- 6.3 Installation of Laser Welder
- 6.2 Inspection and Acceptance of Stitcher
- 6.1 Installation of Stitcher
- 6 Strip Connection Equipment
- 5.7 Test-run of Shearing Equipment
- 5.6 Inspection and Acceptance of Cross-Cut Shear
- 5.5 Installation of Cross-Cut Shear
- 5.4 Inspection and Acceptance of Disc Shear
- 5.3 Installation of Disc Shear
- 5.2 Inspection and Acceptance of Notcher
- 5.1 Installation of Notcher
- 5 Shearing Equipment
- 4.2 Inspection and Acceptance of Equipment and Materials
- 4.1 General Requirements
- 4 Equipment and Materials Mobilization
- 3.6 Inspection and Acceptance of Base Plates
- 3.5 Erection of Base Plates
- 3.4 Inspection and Acceptance of Anchor Bolts
- 3.3 Erection of Anchor Bolts
- 3.2 Inspection and Acceptance of Equipment Foundation
- 3.1 Equipment Foundation Construction
- 3 Equipment Foundation,Anchor Bolt and Base plate
- 2 Basic Requirements
- 1 General Provisions
- Foreword
- Announcement of Ministry of Housing and Urban-Rural Development of the People's Republic of China
- 版權信息
- 封面
- 封面
- 版權信息
- Announcement of Ministry of Housing and Urban-Rural Development of the People's Republic of China
- Foreword
- 1 General Provisions
- 2 Basic Requirements
- 3 Equipment Foundation,Anchor Bolt and Base plate
- 3.1 Equipment Foundation Construction
- 3.2 Inspection and Acceptance of Equipment Foundation
- 3.3 Erection of Anchor Bolts
- 3.4 Inspection and Acceptance of Anchor Bolts
- 3.5 Erection of Base Plates
- 3.6 Inspection and Acceptance of Base Plates
- 4 Equipment and Materials Mobilization
- 4.1 General Requirements
- 4.2 Inspection and Acceptance of Equipment and Materials
- 5 Shearing Equipment
- 5.1 Installation of Notcher
- 5.2 Inspection and Acceptance of Notcher
- 5.3 Installation of Disc Shear
- 5.4 Inspection and Acceptance of Disc Shear
- 5.5 Installation of Cross-Cut Shear
- 5.6 Inspection and Acceptance of Cross-Cut Shear
- 5.7 Test-run of Shearing Equipment
- 6 Strip Connection Equipment
- 6.1 Installation of Stitcher
- 6.2 Inspection and Acceptance of Stitcher
- 6.3 Installation of Laser Welder
- 6.4 Inspection and Acceptance of Laser Welder
- 6.5 Installation of Narrow Lap Welder
- 6.6 Inspection and Acceptance of Narrow Lap Welder
- 6.7 Test-run of Strip Connection Equipment
- 7 Strip Surface Preparation Equipment
- 7.1 Installation of Shot Blaster
- 7.2 Inspection and Acceptance of Shot Blaster
- 7.3 Installation of Roller
- 7.4 Inspection and Acceptance of Roller
- 7.5 Installation of Strip Dryer
- 7.6 Inspection and Acceptance of Strip Dryer
- 7.7 Installation of Oiler
- 7.8 Inspection and Acceptance of Oiler
- 7.9 Installation of Coater
- 7.10 Inspection and Acceptance of Coater
- 7.11 Test-run of Strip Surface Preparation Equipment
- 8 Horizontal Continuous Annealing Furnace
- 8.1 Erection of Furnace Steel Platform
- 8.2 Inspection and Acceptance of Furnace Steel Platform
- 8.3 Erection of Furnace Chamber
- 8.4 Inspection and Acceptance of Furnace Chamber
- 8.5 Installation of Furnace Equipment
- 8.6 Inspection and Acceptance of Furnace Equipment
- 8.7 Furnace Air Tightness Test
- 8.8 Test-run of Horizontal Continuous Annealing Furnace
- 9 Baking Furnace
- 9.1 Erection of Steel Platform
- 9.2 Inspection and Acceptance of Baking Furnace Steel Platform
- 9.3 Erection of Furnace Chamber
- 9.4 Inspection and Acceptance of Furnace Chamber
- 9.5 Installation of Furnace Equipment
- 9.6 Inspection and Acceptance of Furnace Equipment
- 9.7 Test-run of Baking Furnaces
- 10 Rotary Annealing Furnace
- 10.1 Installation of Backup Roller and Guide Rollers
- 10.2 Inspection and Acceptance of Backup Rollers and Guide Rollers
- 10.3 Installation of Furnace Steel Structure
- 10.4 Inspection and Acceptance of Furnace Steel Structure
- 10.5 Installation of Lower Trolley
- 10.6 Inspection and Acceptance of Lower Trolley
- 10.7 Erection of Rotating Steel Platform
- 10.8 Inspection and Acceptance of Rotating Steel Platform
- 10.9 Erection of Furnace Shell
- 10.10 Inspection and Acceptance of Furnace Shell
- 10.11 Erection of Upper Trolley
- 10.12 Installation of Furnace Door
- 10.13 Inspection and Acceptance of Furnace Door
- 10.14 Test-run of Rotary Annealing Furnace
- 11 Safety and Environmental Protection
- 11.1 Safety
- 11.2 Environmental Protection
- Appendix A Classification Table of Subproject and Sub-divisional Work for Grain-oriented Silicon Steel Production Line Engineering Equipment Installation
- Appendix B Quality Acceptance Record for Sub-divisional Work of Grain-Oriented Silicon Steel Production Line Engineering Equipment Installation
- Appendix C Quality Acceptance Record for Subproject of Grain-Oriented Silicon Steel Production Line Engineering Equipment Installation
- Appendix D Quality Acceptance Record for Unit Work of Grain-Oriented Silicon Steel Production Line Engineering Equipment Installation
- Appendix E Non-load Test-run Record for Grain-Oriented Silicon Steel Production Line Engineering Equipment
- Explanation of Wording in This Code
- List of Quoted Standards
- Explanation of Provisions
- Explanation for Formulation of This Code
- 1 General Provisions
- 2 Basic Requirements
- 3 Equipment Foundation,Anchor Bolt and Base Plate
- 3.1 Equipment Foundation Construction
- 3.2 Inspection and Acceptance of Equipment Foundation
- 3.3 Erection of Anchor Bolts
- 3.4 Inspection and Acceptance of Anchor Bolts
- 3.5 Erection of Base Plates
- 3.6 Inspection and Acceptance of Base Plates
- 4 Equipment and Materials Mobilization
- 4.1 General Requirements
- 4.2 Inspection and Acceptance of Equipment and Materials
- 6 Strip Connection Equipment
- 6.3 Installation of Laser Welder
- 6.5 Installation of Narrow Lap Welder
- 7 Strip Surface Treatment Equipment
- 7.9 Installation of Coater
- 8 Horizontal Continuous Annealing Furnace
- 8.3 Erection of Furnace Chamber
- 8.7 Furnace Air Tightness Test
- 10 Rotary Annealing Furnace
- 10.1 Installation of Backup Rollers and Guide Rollers
- 10.3 Installation of Furnace Steel Structure
- 10.9 Erection of Furnace Shell
- 10.11 Erection of Upper Trolley
- 11 Safety and Environmental Protection
- 11.1 Safety 更新時間:2020-09-25 11:13:47