最新章節
- 11.2 Safety
- 11.1 General Requirement
- 11 Safety and Environmental Protection
- 10.1 General Requirement
- 10 Equipment Run Test
- 9.4 Housing Case and Rotor
品牌:中國計劃出版社有限公司
上架時間:2020-09-24 18:09:28
出版社:中國計劃出版社
本書數字版權由中國計劃出版社有限公司提供,并由其授權上海閱文信息技術有限公司制作發行
- 11.2 Safety 更新時間:2020-09-24 18:22:36
- 11.1 General Requirement
- 11 Safety and Environmental Protection
- 10.1 General Requirement
- 10 Equipment Run Test
- 9.4 Housing Case and Rotor
- 9.1 General Requirement
- 9 Installation for Main Exhausting Equipment
- 7.10 Fan
- 7.7 Trolley and Gearing
- 7.6 Gearing Framework
- 7.5 Rail
- 7.2 Framework
- 7 Installation for Circular Cooler
- 6.16 Bellows and Main Exhaust Tube
- 6.15 Heat Crusher
- 6.14 Trolley and Grate Cleaning Device
- 6.13 Sealing Slide and Sealing Plate
- 6.12 Tail Device
- 6.11 Head Bending Rail and Intermediate Rail
- 6.10 Portfire Device
- 6.9 Gearing
- 6.8 Head Wheel
- 6.6 Deflector
- 6.4 Hearth Layer Surge Bin and Mixing Bin
- 6.3 Shuttle Conveyor Belt
- 6.2 Supporting Frame
- 6.1 General Requirement
- 6 Installation of Sintering Equipment
- 5.2 Mixer
- 5.1 Constant-weight Feeder
- 5 Installation for Proportioning Equipment and Mixer
- 4.3 Materials
- 4.2 Equipment
- 4 Equipment and Material Mobilization
- 3.3 Anchor Bolt
- 3.2 Set up of Reference Line and Benchmarks
- 3.1 Equipment Foundation Acceptance and Resurvey
- 3 Equipment Foundation,Anchor Bolt And Shim Plate
- 2 Basic Requirement
- 1 General Provisions
- Explanation of Provision
- Explanation of Provisions
- List of Quoted Standards
- Explanation of Wording in This Code
- 11.3 Environmental Protection
- 11.2 Safety
- 11.1 General Requirement
- 11 Safety and Environmental Protection
- 10.7 Run Test for Main Exhausting Equipment
- 10.6 Run Test for Straight Cooler
- 10.5 Run Test for Circular Cooler
- 10.4 Run Test for Sintering Equipment
- 10.3 Run Test for Mixer
- 10.2 Run Test for Constant Feeder
- 10.1 General Requirement
- 10 Equipment Run Test
- 9.5 Auxiliary Equipment
- 9.4 Housing Case and Rotor
- 9.3 Bearing
- 9.2 Bearing Base
- 9.1 General Requirement
- 9 Installation for Main Exhausting Equipment
- 8.5 Belt-type Scraper Conveyor
- 8.4 Gearing
- 8.3 Sealing Covering and Exhaust Tube
- 8.2 Framework
- 8.1 General Requirement
- 8 Installation for Straight Cooler
- 7.10 Fan
- 7.9 Ring-type Scraper Conveyor
- 7.8 Roller Block and Idler Roller
- 7.7 Trolley and Gearing
- 7.6 Gearing Framework
- 7.5 Rail
- 7.4 Bellows and Sealing Covering
- 7.3 Grain Hopper
- 7.2 Framework
- 7.1 General Requirement
- 7 Installation for Circular Cooler
- 6.17 Ash Bucket and Chute
- 6.16 Bellows and Main Exhaust Tube
- 6.15 Heat Crusher
- 6.14 Trolley and Grate Cleaning Device
- 6.13 Sealing Slide and Sealing Plate
- 6.12 Tail Device
- 6.11 Head Bending Rail and Intermediate Rail
- 6.10 Portfire Device
- 6.9 Gearing
- 6.8 Head Wheel
- 6.7 Roller Distributor
- 6.6 Deflector
- 6.5 Cylinder Feeder
- 6.4 Hearth Layer Surge Bin and Mixing Bin
- 6.3 Shuttle Conveyor Belt
- 6.2 Supporting Frame
- 6.1 General Requirement
- 6 Installation of Sintering Equipment
- 5.2 Mixer
- 5.1 Constant-weight Feeder
- 5 Installation for Proportioning Equipment and Mixer
- 4.3 Materials
- 4.2 Equipment
- 4.1 General Requirement
- 4 Equipment and Material Mobilization
- 3.4 Shim Plate
- 3.3 Anchor Bolt
- 3.2 Set up of Reference Line and Benchmarks
- 3.1 Equipment Foundation Acceptance and Resurvey
- 3 Equipment Foundation,Anchor Bolt and Shim Plate
- 2 Basic Requirement
- 1 General Provisions
- Foreword
- Announcement of the Ministry of Housing and Urban-Rural Development of the People's Republic of China
- 版權頁
- 封面
- 封面
- 版權頁
- Announcement of the Ministry of Housing and Urban-Rural Development of the People's Republic of China
- Foreword
- 1 General Provisions
- 2 Basic Requirement
- 3 Equipment Foundation,Anchor Bolt and Shim Plate
- 3.1 Equipment Foundation Acceptance and Resurvey
- 3.2 Set up of Reference Line and Benchmarks
- 3.3 Anchor Bolt
- 3.4 Shim Plate
- 4 Equipment and Material Mobilization
- 4.1 General Requirement
- 4.2 Equipment
- 4.3 Materials
- 5 Installation for Proportioning Equipment and Mixer
- 5.1 Constant-weight Feeder
- 5.2 Mixer
- 6 Installation of Sintering Equipment
- 6.1 General Requirement
- 6.2 Supporting Frame
- 6.3 Shuttle Conveyor Belt
- 6.4 Hearth Layer Surge Bin and Mixing Bin
- 6.5 Cylinder Feeder
- 6.6 Deflector
- 6.7 Roller Distributor
- 6.8 Head Wheel
- 6.9 Gearing
- 6.10 Portfire Device
- 6.11 Head Bending Rail and Intermediate Rail
- 6.12 Tail Device
- 6.13 Sealing Slide and Sealing Plate
- 6.14 Trolley and Grate Cleaning Device
- 6.15 Heat Crusher
- 6.16 Bellows and Main Exhaust Tube
- 6.17 Ash Bucket and Chute
- 7 Installation for Circular Cooler
- 7.1 General Requirement
- 7.2 Framework
- 7.3 Grain Hopper
- 7.4 Bellows and Sealing Covering
- 7.5 Rail
- 7.6 Gearing Framework
- 7.7 Trolley and Gearing
- 7.8 Roller Block and Idler Roller
- 7.9 Ring-type Scraper Conveyor
- 7.10 Fan
- 8 Installation for Straight Cooler
- 8.1 General Requirement
- 8.2 Framework
- 8.3 Sealing Covering and Exhaust Tube
- 8.4 Gearing
- 8.5 Belt-type Scraper Conveyor
- 9 Installation for Main Exhausting Equipment
- 9.1 General Requirement
- 9.2 Bearing Base
- 9.3 Bearing
- 9.4 Housing Case and Rotor
- 9.5 Auxiliary Equipment
- 10 Equipment Run Test
- 10.1 General Requirement
- 10.2 Run Test for Constant Feeder
- 10.3 Run Test for Mixer
- 10.4 Run Test for Sintering Equipment
- 10.5 Run Test for Circular Cooler
- 10.6 Run Test for Straight Cooler
- 10.7 Run Test for Main Exhausting Equipment
- 11 Safety and Environmental Protection
- 11.1 General Requirement
- 11.2 Safety
- 11.3 Environmental Protection
- Explanation of Wording in This Code
- List of Quoted Standards
- Explanation of Provisions
- Explanation of Provision
- 1 General Provisions
- 2 Basic Requirement
- 3 Equipment Foundation,Anchor Bolt And Shim Plate
- 3.1 Equipment Foundation Acceptance and Resurvey
- 3.2 Set up of Reference Line and Benchmarks
- 3.3 Anchor Bolt
- 4 Equipment and Material Mobilization
- 4.2 Equipment
- 4.3 Materials
- 5 Installation for Proportioning Equipment and Mixer
- 5.1 Constant-weight Feeder
- 5.2 Mixer
- 6 Installation of Sintering Equipment
- 6.1 General Requirement
- 6.2 Supporting Frame
- 6.3 Shuttle Conveyor Belt
- 6.4 Hearth Layer Surge Bin and Mixing Bin
- 6.6 Deflector
- 6.8 Head Wheel
- 6.9 Gearing
- 6.10 Portfire Device
- 6.11 Head Bending Rail and Intermediate Rail
- 6.12 Tail Device
- 6.13 Sealing Slide and Sealing Plate
- 6.14 Trolley and Grate Cleaning Device
- 6.15 Heat Crusher
- 6.16 Bellows and Main Exhaust Tube
- 7 Installation for Circular Cooler
- 7.2 Framework
- 7.5 Rail
- 7.6 Gearing Framework
- 7.7 Trolley and Gearing
- 7.10 Fan
- 9 Installation for Main Exhausting Equipment
- 9.1 General Requirement
- 9.4 Housing Case and Rotor
- 10 Equipment Run Test
- 10.1 General Requirement
- 11 Safety and Environmental Protection
- 11.1 General Requirement
- 11.2 Safety 更新時間:2020-09-24 18:22:36