6.10 Portfire Device
6.10.1 The installation of portfire device shall be in accordance with the following requirements:
1 The column elevation shall be adjusted and checked by level and steel ruler with tolerance of±5.0mm,height differential for adjacent column with tolerance of 5.0mm;
2 The longitudinal centerline of ignition furnace and of column of insulation furnace shall be adjusted based on longitudinal centerline of head wheel of sintering equipment,and checked by wire/thread and ruler with tolerance of 2.0mm;
3 The transversal centerline of ignition furnace and of column of insulation furnace shall be adjusted based on axial centerline of head wheel of sintering equipment,and checked by wire/thread and ruler with tolerance of 2.0mm;
4 The verticality of column shall be adjusted and checked by theodolite or ruler and thread pendant with tolerance of 1.0/1000;
5 The difference of length and digonal between lower part and upper part of support shall be adjusted,and checked by wire/thread and ruler with tolerance of 5.0mm;
6 The elevation of water cooling baffle and water cooling box shall be adjusted,and checked by level and steel ruler with tolerance of±5.0mm;
7 The centerline of water cooling baffle and water cooling box shall be adjusted,and checked by wire/thread and steel ruler/tape with tolerance of 5.0mm;
8 The centerline of burner shall be adjusted,and checked by wire/thread and steel ruler/tape with tolerance of 3.0mm;
9 The elevation of burner shall be adjusted,and checked by level and steel ruler with tolerance of±5.0mm.
6.10.2 Match between welding material and base metal shall meet the design requirements.Welding material shall be dried and stored before using in accordance with product instructions and welding process document.
6.10.3 Welding quality for furnace body must meet requirements of design technical document;if no requirements in design document;it must meet requirements ofⅣclass in current national standard GB 50236 Code for Construction and Acceptance of Welding Engineering of Field Equipment and Industrial Pipe.
6.10.4 Hydraulic test of water cooling baffle and water cooling box shall be in accordance with the following requirements:
1 Hydraulic test of water-cooling baffle and water-cooling box shall be carried out after installation of equipment and before masonry;
2 Hydraulic tests of water-cooling baffle and water-cooling box shall be in accordance with design document or with following previsions 3-6 if not provided for in design;
3 The test pressure shall be 1.5 times of the working pressure,which shall be kept for 10min before reduced to working pressure.Then the pressure shall be maintained at the working pressure for 30min,it is qualified if no pressure drop and no leakage;
4 At least 2 pressure gauges for pressure test shall be available,which shall be calibrated to be qualified with precision grade not lower than 1.5 grade,the full scale value of which shall be 1.5-2 times of test pressure;
5 Clear water shall be used for hydraulic test with ambient temperature not lower than 5℃,otherwise the antifreezing measures shall be adopted;
6 The pressure shall be increased step by step slowly,which shall not be increased to test pressure in one time.
- GB/T 51338-2018 分布式電源并網工程調試與驗收標準
- GB50588-2017水泥工廠余熱發電設計標準(英文版)
- DL/T 5503-2015 直流換流站施工圖設計內容深度規定
- GB/T 50770-2013 石油化工安全儀表系統設計規范(英文版)
- 光伏支架結構設計規程
- GB/T 50643-2018 橡膠工廠職業安全衛生設計標準
- 濕陷性土起始壓力測試規程
- GB 51006-2014 石油化工建(構)筑物結構荷載規范(英文版)
- 水泥工廠環境保護設施設計標準
- DL 5068-2014 發電廠化學設計規范
- 建設工程化學灌漿材料應用技術標準
- GB/T 51273-2018 石油化工鋼制設備抗震鑒定標準
- GB 51171-2016 通信線路工程驗收規范
- GB/T 50619-2010(英文版)火力發電廠海水淡化工程設計規范
- GB 50387-2006 冶金機械液壓、潤滑和氣動設備工程安裝驗收規范 (英文版)