- Manage Your SAP Projects with SAP Activate
- Vinay Singh
- 111字
- 2021-07-08 10:07:09
Three pillars
SAP best practices, guided configuration, and SAP Activate methodology form the three pillars for SAP Activate, with each bringing special capabilities along with it. In the following diagram, we have jotted down some of the key capabilities that each of these provides to SAP Activate:

Three pillars of SAP Activate
Let's go a step further and see how these three pillars (SAP Activate overall) support customers' adoption scenarios (details of scenarios are discussed separately):

Table: Three pillars supporting different scenarios
There are three scenarios for the transition to SAP S/4HANA. Let's see the three scenarios and find out the innovation that SAP Activate brings with it for these scenarios.
推薦閱讀
- Node.js 10實(shí)戰(zhàn)
- 控糖控脂健康餐
- Oracle數(shù)據(jù)庫(kù)從入門(mén)到運(yùn)維實(shí)戰(zhàn)
- Java EE 7 Development with NetBeans 8
- INSTANT Mercurial SCM Essentials How-to
- JavaScript入門(mén)經(jīng)典
- C#程序設(shè)計(jì)教程(第3版)
- 21天學(xué)通C++(第5版)
- Unity Character Animation with Mecanim
- Java EE Web應(yīng)用開(kāi)發(fā)基礎(chǔ)
- INSTANT JQuery Flot Visual Data Analysis
- 精通Spring:Java Web開(kāi)發(fā)與Spring Boot高級(jí)功能
- Spring MVC Blueprints
- 陪孩子像搭積木一樣學(xué)編程:Python真好玩+Scratch趣味編程(全2冊(cè))
- 深度剖析ApacheDubbo核心技術(shù)內(nèi)幕