Sprint Planning
Sprint Planning is an opportunity for the Scrum Team to plan the features in the current Sprint cycle. The plan is created mainly by the developers. Once the plan is created, it is explained to the Scrum Master and the Product Owner. The Sprint Planning is a timeboxed activity, and it is usually around eight hours in total for a one-month Sprint cycle. It is the responsibility of the Scrum Master to ensure everyone participates in the Sprint Planning activity.
In the meeting, the Development Team takes into consideration the following items:
- The number of Product Backlogs to be worked on (both new and the old ones from the last Sprint).
- Team performances in the last Sprint.
- Projected capacity of the Development Team.
推薦閱讀
- Containerization with LXC
- Persistence in PHP with the Doctrine ORM
- FreeRTOS實時內核應用指南
- Mastering KVM Virtualization
- Linux集群和自動化運維
- Microsoft Operations Management Suite Cookbook
- 嵌入式實時操作系統(tǒng)μC/OS原理與實踐
- 突破平面3ds Max動畫設計與制作
- 從實踐中學習Kali Linux無線網(wǎng)絡滲透測試
- iOS 8開發(fā)指南
- 寫給架構師的Linux實踐:設計并實現(xiàn)基于Linux的IT解決方案
- Python UNIX和Linux系統(tǒng)管理指南
- HTML5 Enterprise Application Development
- OpenVZ Essentials
- Unity AR/VR開發(fā):實戰(zhàn)高手訓練營