6 Main Building
6.1 General Requirements
6.1.1 The internal layout of main building shall be safe running and convenient operation,and patrol inspection channels shall be smooth.The ventilation,lighting,illumination and noise control and others of the main building shall meet the relevant requirements of the current national standards Design code for heating ventilation and air conditioning of industrial buildings GB 50019,Standard for daylighting design of buildings GB 50033,Standard for lighting design of buildings GB 50034 and Code for design of noise control of industrial enterprises GB/T 50087.
6.1.2 The main building shall be equipped with overhaul lifting facilities,overhaul site,and shall be set transport channel for overhaul of equipment and components.
6.1.3 The internal layout of workshop shall be determined by the professional design layout requirements for thermal-mechanical,electrical,civil,water,thermal control,heating and ventilation etc.,and the extension conditions.The reserved expanded workshop should be coordinated with the original workshop.
- GB 51139-2015 纖維素纖維用漿粕工廠設(shè)計規(guī)范
- GB 51287-2018 煤炭工業(yè)露天礦土地復(fù)墾工程設(shè)計標準
- GB 50227-2017 并聯(lián)電容器裝置設(shè)計規(guī)范
- GB 51221-2017 城鎮(zhèn)污水處理廠工程施工規(guī)范
- 核電站鋼板混凝土結(jié)構(gòu)技術(shù)標準
- 石油化工廠際管道工程技術(shù)標準
- DL/T 866-2015 電流互感器和電壓互感器選擇及計算規(guī)程
- DL/T5232-2010±800kV及以下直流換流站電氣裝置安裝工程施工及驗收規(guī)程(英文版)
- GB 51181-2016 煤炭洗選工程節(jié)能設(shè)計規(guī)范
- DL/T 5501-2015 凍土地區(qū)架空輸電線路基礎(chǔ)設(shè)計技術(shù)規(guī)程
- DL/T 5153-2014 火力發(fā)電廠廠用電設(shè)計技術(shù)規(guī)程
- DL/T5236-2010±800kV及以下直流架空輸電線路工程施工質(zhì)量檢驗及評定規(guī)程(英文版)
- YS/T 5420-2014 有色金屬工業(yè)通用設(shè)備安裝工程質(zhì)量檢驗評定標準
- YS/T 5425-2014 有色金屬加工設(shè)備安裝工程質(zhì)量檢驗評定標準
- 陽極炭塊堆垛機組安裝技術(shù)規(guī)程