- GB50588-2017水泥工廠余熱發(fā)電設(shè)計(jì)標(biāo)準(zhǔn)(英文版)
- 中華人民共和國(guó)住房和城鄉(xiāng)建設(shè)部
- 251字
- 2020-09-25 15:34:31
5.4 Pipeline Arrangement
5.4.1 The thermodynamic pipes may be laid in the same pipe gallery and on the same pipe rack with the cement process pipes;in case any conflict occurs to the comprehensive layout of pipeline,the treatment mode shall meet the relevant requirements of the current national standard Code for design of general plan of industrial enterprises GB 50187.
5.4.2 In case underground pipelines are arranged within range of pavement,the method of direct burial or trench laying shall be determined by technical and economic comparison.
5.4.3 Overhead pipeline shall be arranged in accordance with the following requirements:
1 It shall use buildings(or structures)of cement production lines;
2 It shall not impede traffic,maintenance,natural lighting and natural ventilation of buildings,and shall ensure neat appearance;
3 Overhead lines should be arranged at corresponding position of underground pipelines.
5.4.4 The horizontal clear distance of underground pipelines,horizontal clear distance among underground pipelines,overhead pipelines and buildings(or structures),and vertical clear distance among underground pipelines and between underground pipelines and the intersections of railways and roads shall be determined by the engineering geology,framework foundation form,inspection shaft structure,burial depth of pipelines,pipe diameter,media inside pipes and other factors,and the minimum clear distances shall meet the relevant requirements of the current national standard Code for design of cement plant GB 50295.
5.4.5 Comprehensive layout of pipelines in renovation and extension projects shall not impede the normal use of existing pipelines.The distance among underground pipelines shall meet the relevant requirements of the current national standard Code for design of cement plant GB 50295.
- GB51005-2014水泥工廠余熱發(fā)電工程施工與質(zhì)量驗(yàn)收規(guī)范(英文版)
- 工業(yè)企業(yè)技術(shù)改造升級(jí)投資指南:指南 解讀 案例(2023年版)
- 城市地下空間規(guī)劃標(biāo)準(zhǔn)
- DL/T5161.1-2002電氣裝置安裝工程質(zhì)量檢驗(yàn)及評(píng)定規(guī)程第1部分:通則(英文版)
- GB 50222-2017 建筑內(nèi)部裝修設(shè)計(jì)防火規(guī)范
- GB/T51050-2014鋼鐵企業(yè)能源計(jì)量和監(jiān)測(cè)工程技術(shù)規(guī)范(英文版)
- DL/T5161.6-2002電氣裝置安裝工程質(zhì)量檢驗(yàn)及評(píng)定規(guī)程第6部分:接地裝置施工質(zhì)量檢驗(yàn)(英文版)
- GB 50169-2016 電氣裝置安裝工程 接地裝置施工及驗(yàn)收規(guī)范
- GB 51162-2016 重型結(jié)構(gòu)和設(shè)備整體提升技術(shù)規(guī)范
- GB 51205-2016 精對(duì)苯二甲酸工廠設(shè)計(jì)規(guī)范
- GB/T 50436-2017 線材軋鋼工程設(shè)計(jì)標(biāo)準(zhǔn)
- GB 50360-2016 水煤漿工程設(shè)計(jì)規(guī)范
- GB50679-2011煉鐵機(jī)械設(shè)備安裝規(guī)范(英文版)
- DL/T 5516-2016 火力發(fā)電廠集中控制室及電子設(shè)備間布置設(shè)計(jì)規(guī)程
- 建設(shè)工程化學(xué)灌漿材料應(yīng)用技術(shù)標(biāo)準(zhǔn)