- DL/T5210.2-2009電力建設施工質量驗收及評價規程第2部分:鍋爐機組(英文版)
- 中國電力企業
- 116字
- 2020-09-25 15:32:46
1 Scope
This Part of DL/T 5210 specifies the construction quality acceptance standards for boiler units in a thermal power project and,the relevant quality evaluation requirements of single project,single unit and the whole project.
This Part is applicable to the construction quality acceptance and project quality evaluation on the boiler unit of new-built,extended or reconstructed thermal power projects including single unit capacity between 300MW and 1000MW.The thermal power project below 300MW shall be carried out with reference to this Part(and the contents of waste incineration boilers,biomass incineration boilers and gasturbine heat recovery boilers are given in Annexes A,B and C,respectively).
推薦閱讀
- DL/T5161.10-2002電氣裝置安裝工程質量檢驗及評定規程第10部分:35kV及以下架空電力線路施工質量檢驗(英文版)
- DL/T 5491-2014 電力工程交流不間斷電源系統設計技術規程
- GB 51220-2017 生活垃圾衛生填埋場封場技術規范
- GB50764-2012電廠動力管道設計規范(英文版)
- 汽車故障診斷技巧與禁忌速查手冊
- 建筑衛生陶瓷工廠節能設計標準
- GB 50426-2016 印染工廠設計規范
- GB50071-2014小型水力發電站設計規范(英文版)
- 鉆探、井探、槽探操作規程
- GB 51170-2016 航空工業工程設計規范
- GB 51171-2016 通信線路工程驗收規范
- 建材工程術語標準
- 變電站和換流站給水排水設計規程
- GB 51247-2018 水工建筑物抗震設計標準
- GB50078-2008煙囪工程施工及驗收規范(英文版)