- GB50227-2008并聯(lián)電容器裝置設(shè)計(jì)規(guī)范(英文版)
- 中華人民共和國住房和城鄉(xiāng)建設(shè)部
- 165字
- 2020-09-25 15:23:20
1 General
1.0.1 This code is prepared for the compliance with technical and economic policies promulgated by the state when designing shunt capacitor installations for power project that are required to be safe,reliable,technically advance,cost effective and easily operational and maintainable.
1.0.2 This code is applicable to designing reactive power compensation three-phase HV/LV AC shunt capacitor installations in newly-built and expanded substations and distribution rooms at 750kV and below.
1.0.3 The compensation capacity,connection mode,associated equipment,control and protection mode,arrangement and installation of shunt capacitor shall be determined according to the grid conditions,compensation demand,environmental conditions,operation and maintenance requirements and field experience at the installation location.
1.0.4 The type selection of shunt capacitor installations shall meet relevant national standards in force.
1.0.5 In addition to those specified in this code,shunt capacitor installations shall be designed in compliance with the requirements of other relevant national standards in force.
- GB 50388-2016 煤礦井下機(jī)車車輛運(yùn)輸信號設(shè)計(jì)規(guī)范
- DL/T 5528-2017 輸變電工程結(jié)算審核報(bào)告編制導(dǎo)則
- 真空電子器件生產(chǎn)線設(shè)備安裝技術(shù)標(biāo)準(zhǔn)
- GB/T51050-2014鋼鐵企業(yè)能源計(jì)量和監(jiān)測工程技術(shù)規(guī)范(英文版)
- DL/T 5503-2015 直流換流站施工圖設(shè)計(jì)內(nèi)容深度規(guī)定
- GB 50471-2018 煤礦瓦斯抽采工程設(shè)計(jì)標(biāo)準(zhǔn)
- GB/T 50934-2013 石油化工工程防滲技術(shù)規(guī)范(英文版)
- DL/T 5508-2015 燃?xì)夥植际焦┠苷驹O(shè)計(jì)規(guī)范
- GB/T51154-2015海底光纜工程設(shè)計(jì)規(guī)范(英文版)
- GB 51136-2015 薄膜晶體管液晶顯示器工廠設(shè)計(jì)規(guī)范
- GB 51184-2016 礦山提升井塔設(shè)計(jì)規(guī)范
- GB/T 50050-2017 工業(yè)循環(huán)冷卻水處理設(shè)計(jì)規(guī)范
- 建筑衛(wèi)生陶瓷工廠節(jié)能設(shè)計(jì)標(biāo)準(zhǔn)
- GB 51135-2015 轉(zhuǎn)爐煤氣凈化及回收工程技術(shù)規(guī)范
- GB50427-2015高爐煉鐵工程設(shè)計(jì)規(guī)范(英文版)