- GB50169-2006電氣裝置安裝工程接地裝置施工及驗收規(guī)范(英文版)
- 中華人民共和國住房和城鄉(xiāng)建設(shè)部
- 273字
- 2020-09-25 15:27:00
1 General Provisions
1.0.1 This code is formulated with a view to ensure the quality of the electrical installation engineering about grounding device,facilitate the improvement of engineering construction technology and ensure the safety of grounding device equipment.
1.0.2 This code is applicable to the construction and acceptance of electric equipment for grounding device in installation engineering.
1.0.3 Installation of grounding device shall be performed by the construction corporation according to the approved design requirements.The installation of the grounding device shall be supervised by client and supervisor.
1.0.4 Equipment used in grounding device construction shall meet current national standard and should have certificates.
1.0.5 Safety technical measures in construction shall meet requirements in this code and the relevant safety standard.
1.0.6 Installation of grounding device shall be coordinated with the construction of civil work.The concealed part must be finished with the intermediate inspection and acceptance record together with the associated departments before covering.
1.0.7 Connection of various grounding devices and main grounding grid must be reliable.Welding quality of grounding device shall meet stipulations in Clause 3.4.2 of this code.Grounding and resistance shall conform to design requirements.The connection between expanded grounding grid and the original grounding grid shall be multi-point connection.
1.0.8 The acceptance testing of grounding device shall be carried out immediately after civil work.For grounding device in the area with high soil resistivity,the measures shall be taken according to the design requirements if the ground resistance fails to meet requirements.It should only be operated after the acceptance.
1.0.9 Construction and acceptance of grounding device shall meet requirements in current national code and specification besides the requirements in this code.
- 設(shè)計系統(tǒng)發(fā)展研究
- GB50713-2011板帶精整工藝設(shè)計規(guī)范(英文版)
- GB/T51050-2014鋼鐵企業(yè)能源計量和監(jiān)測工程技術(shù)規(guī)范(英文版)
- GB 51209-2016 發(fā)光二極管工廠設(shè)計規(guī)范
- GB/T 50770-2013 石油化工安全儀表系統(tǒng)設(shè)計規(guī)范(英文版)
- GB/T50663-2011核電廠工程水文技術(shù)規(guī)范(英文版)
- GB 51221-2017 城鎮(zhèn)污水處理廠工程施工規(guī)范
- GB 50084-2017 自動噴水滅火系統(tǒng)設(shè)計規(guī)范
- GB50439-2015煉鋼工程設(shè)計規(guī)范(英文版)
- SH/T 3096-2012 高硫原油加工裝置設(shè)備和管道設(shè)計選材導(dǎo)則 (英文版)
- 電力系統(tǒng)無功補償及調(diào)壓設(shè)計技術(shù)導(dǎo)則
- GB 51171-2016 通信線路工程驗收規(guī)范
- GB/T 51169-2016 煤炭工業(yè)礦井采掘設(shè)備配備標(biāo)準(zhǔn)
- 變電站和換流站給水排水設(shè)計規(guī)程
- 沖壓加工技能培訓(xùn)與操作實踐