- GB50427-2015高爐煉鐵工程設計規范(英文版)
- 中國冶金建設協會
- 8字
- 2020-09-25 11:20:40
4 Raw Material,Fuels and Technical Index
4.1 Raw Material and Fuels
4.1.1 The raw material/feedstock charged in blast furnace shall be mainly sinter and pellet,constituting the burden mix of high-basicity sinters plus acid pellets(self-fluxing pellets)or some lump ores.
4.1.2 The feedstock's charge grade and agglomeration rate should be consistent with the requirements stated in Table 4.1.2 below.
Table 4.1.2 Iron Content and Agglomeration Rate of Charge Feedstock

Note:The"average iron content"in the above table excludes content of special ore.
4.1.3 Quality of sinter should be consistent with the requirements stated in Table 4.1.3 below.
Table 4.1.3 Quality Requirements for Sinter

4.1.4 Quality of pellet should be consistent with the requirements stated in Table 4.1.4 below.
Table 4.1.4 Quality Requirements for Pellet

Notes:1 The above table excludes special ore.
2 The basicity of pellet shall be determined properly in accordance with the burden mix of the blast furnace.It's necessary to make clear specification in the design document that the burdening of acid pellet and high-basicity sinter should be designed for achieving the pellet's physicochemical properties.
3 The basicity of pellet should not be valued in the range of 0.3-0.8.
4.1.5 Quality of lump ore should be consistent with the requirements stated in Table 4.1.5 below.
Table 4.1.5 Quality Requirements for Lump Ore

4.1.6 Grain size of feedstock should be consistent with the requirements stated in Table 4.1.6 below.
Table 4.1.6 Requirements for Grain Size of Feedstock

Note:Grain size of the limestone,dolomite,fluorite,manganese minerals and silica shall be the same as that of lump ore.
4.1.7 Quality of top-charging coke should be consistent with the requirements stated in Table 4.1.7 below.
Table 4.1.7 Quality Requirements for Top-charging Coke

Note:The quality requirements for stamp-charging coke are not listed herein because for stamp-charging coke oven,the coal batching varies greatly,coke products have pretty different densities,heat pattern is not complete as desired,and as a result,the technical indicators of the coke cannot fully meet the blast furnace production needs.
4.1.8 The coal injected into blast furnace shall be selected as the resources condition allows.Quality of the coal for injection should be consistent with the requirements stated in Table 4.1.8 below.
Table 4.1.8 Quality Requirements for Coal Injected into Blast Furnace

4.1.9 The feedstock and fuels of blast furnace shall be charged with controlled quantities of harmful impurities within the values required in Table 4.1.9 below.
Table 4.1.9 Control Values(kg/t)of Harmful Impurities in Charge Feedstock and Fuels of Blast Furnace

- GB50950-2013光纜廠生產設備安裝工程施工及質量驗收規范(英文版)
- DL/T 5390-2014 發電廠和變電站照明設計技術規定
- GB51005-2014水泥工廠余熱發電工程施工與質量驗收規范(英文版)
- GB/T50796-2012 光伏發電工程驗收規范(英文版)
- GB 51227-2017 立井鉆井法施工及驗收規范
- GB 50077-2017 鋼筋混凝土筒倉設計標準
- 加油站在役油罐防滲漏改造工程技術標準
- DL/T5161.1-2002電氣裝置安裝工程質量檢驗及評定規程第1部分:通則(英文版)
- GB 50084-2017 自動噴水滅火系統設計規范
- GB50402-2007燒結機械設備工程安裝驗收規范(英文版)
- 平板玻璃工廠節能設計標準
- 配電網規劃研究報告內容深度規定
- 工業文化研究(第2輯):紀念改革開放四十年——中國工業的大轉型
- 核電廠混凝土結構技術標準
- GB 50372-2006 煉鐵機械設備工程安裝驗收規范 (英文版)