舉報(bào)

會(huì)員
GB 50372-2006 煉鐵機(jī)械設(shè)備工程安裝驗(yàn)收規(guī)范 (英文版)
中華人民共和國住房和城鄉(xiāng)建設(shè)部 著
更新時(shí)間:2020-09-24 18:15:53
開會(huì)員,本書免費(fèi)讀 >
本規(guī)范共分19章,包括總則,基本規(guī)定,設(shè)備基礎(chǔ)、地腳螺栓和墊板,設(shè)備和材料進(jìn)場,工藝鋼結(jié)構(gòu)工程,高爐爐體設(shè)備安裝工程,高爐無料鐘爐頂設(shè)備安裝工程,供料設(shè)備安裝工程,上料設(shè)備安裝工程,風(fēng)口平臺(tái)及出鐵場設(shè)備安裝工程,熱風(fēng)爐設(shè)備安裝工程,高爐鼓風(fēng)設(shè)備安裝工程,煤氣凈化設(shè)備安裝工程,高爐噴煤設(shè)備安裝工程,渣處理設(shè)備安裝工程,鐵處理設(shè)備安裝工程,碾泥設(shè)備安裝工程,水處理設(shè)備安裝工程,高爐系統(tǒng)泄漏性試驗(yàn)等。本規(guī)范適用于爐容大于或等于1000m3的高爐和熔融還原(COREX)爐機(jī)械設(shè)備工程安裝質(zhì)量驗(yàn)收。
最新章節(jié)
- 19.2 Overall Leakage Test for Blast Furnace System
- 19.1 General Provisions
- 19 Overall Leakage Test for Blast Furnace System
- 18.14 Commissioning of Vertical Mixer
- 18.12 Metal Tank
- 18.1 General Provisions
品牌:中國計(jì)劃出版社有限公司
上架時(shí)間:2020-09-24 18:07:44
出版社:中國計(jì)劃出版社
本書數(shù)字版權(quán)由中國計(jì)劃出版社有限公司提供,并由其授權(quán)上海閱文信息技術(shù)有限公司制作發(fā)行
- 19.2 Overall Leakage Test for Blast Furnace System 更新時(shí)間:2020-09-24 18:15:53
- 19.1 General Provisions
- 19 Overall Leakage Test for Blast Furnace System
- 18.14 Commissioning of Vertical Mixer
- 18.12 Metal Tank
- 18.1 General Provisions
- 18 Installation Engineering of Water Treatment Equipment
- 17.6 Shaper
- 17.2 2-stage Vibrating Coke Crusher
- 17 Installation Engineering of Milling Equipment
- 14.4 Pulverized Coal Collector
- 14.3 Raw-coal Bin and Pulverized Coal Tank
- 14 Installation Engineering of Blast Furnace Pulverized Coal Injection(PCI)Equipment
- 13.8 Pressure-regulating Device of Circumferential Weld Scrubber
- 13.6 Valve Group for Gas Pressure Regulating
- 13 Installation Engineering of Gas Purification Equipment
- 12.7 Valve
- 12.2 Axial Blower
- 12 Installation Engineering of Blast Furnace Air-blowing Equipment
- 11.5 Valve of Hot-blast Stove
- 11 Installation Engineering of Hot-blast stove Equipment
- 10.11 Main Chute Cover Carriage
- 10.6 Slag Stopper
- 10.4 Taphole Machine
- 10.2 Hydraulic Clay Gun
- 10 Installation Engineering of Tuyere Platform and Cast House Equipment
- 7.10 Blow-off Valve,Equalizer Valve on Top
- 7.6 Receiving Hopper
- 7.5 Charging Bucket
- 7.4 Valve Box
- 7.2 Transmission Gear Box With Distribution Chute
- 7.1 General Provisions
- 7 Installation Engineering of Blast Furnace Bell-less Top Equipment
- 6.4 Slag Hole Device and Taphole Sleeve
- 6.3 Tuyere Device
- 6.2 Furnace Body Cooling Equipment
- 6 Installation Engineering of Blast Furnace Body Equipment
- 5.11 Painting Works for Process Steel Structure
- 5.9 Installation of Shell
- 5.7 Installation of Frame
- 5.6 Fabrication of Shell
- 5.4 Fabrication of Frame,Corridors Truss
- 5.2 Welding
- 5 Process Structural Steelwork
- 4.3 Raw Materials
- 4.2 Equipments and Elements
- 4.1 General Provisions
- 4 Mobilization of Equipments and Materials
- 3.4 Padding Plate
- 3.3 Anchor Bolt
- 3.2 Equipment Foundation
- 3.1 General Provisions
- 3 Equipment Foundation,Anchor Bolts and Padding plate
- 2 Basic Provisions
- 1 General Provisions
- Explanation for Provisions
- Explanation of Wording in This Code
- Appendix F Sealing Requirements between valve petal and Valve Seat for Blow-off Valve,Equalizing Valve,Hot-blast stove Shut-off Valve,Gas Shut-off Valve and Ash Valve of Dust Collector
- Appendix E Pressure Test for Pressure-holding Equipment
- Appendix D No-load Commissioning Record of Metallurgical Machinery Ironmaking Equipment Engineering
- Appendix C Quality Acceptance Record Sheet for Unit Works of Installation for Metallurgical Machinery Ironmaking Equipment Engineering
- Appendix B Quality Acceptance Record Sheet for Divisional Works of Installation for Metallurgical Machinery Ironmaking Equipment Engineering
- Appendix A Quality Record Sheet for Sub-divisional Works of Installation Acceptance of Metallurgical Machinery Ironmaking Equipment Engineering
- 19.2 Overall Leakage Test for Blast Furnace System
- 19.1 General Provisions
- 19 Overall Leakage Test for Blast Furnace System
- 18.14 Commissioning of Vertical Mixer
- 18.13 Vertical Mixer
- 18.12 Metal Tank
- 18.11 Commissioning of Top Fan on Cooling Tower
- 18.10 Top Fan on Cooling Tower
- 18.9 Ion-exchange Resin Tower
- 18.8 Pressure-type Cylinder-shaped Filter
- 18.7 Commissioning of Horizontal Plate-and-frame Filter Press
- 18.6 Horizontal Plate-and-frame Filter Press
- 18.5 Commissioning of Float-type Oil Collector of Sedimentation Tank
- 18.4 Float-type Oil Collector of Sedimentation Tank
- 18.3 Commissioning of Top Trolley of Sedimentation Tank
- 18.2 Top Trolley of Sedimentation Tank
- 18.1 General Provisions
- 18 Installation Engineering of Water Treatment Equipment
- 17.7 Commissioning of Shaper
- 17.6 Shaper
- 17.5 Commissioning of Clay Mill
- 17.4 Clay Mill
- 17.3 Commissioning of 2-stage Vibrating Coke Crusher
- 17.2 2-stage Vibrating Coke Crusher
- 17.1 General Provisions
- 17 Installation Engineering of Milling Equipment
- 16.8 Commissioning of Plate-type Rotary Unloader
- 16.7 Plate-type Rotary Unloader
- 16.6 Front Column
- 16.5 Commissioning of Floor-type Tip-over Windlass
- 16.4 Floor-type Tip-over Windlass
- 16.3 Commissioning of Iron Casting Machine
- 16.2 Iron Casting Machine
- 16.1 General Provisions
- 16 Installation Engineering of Iron Treatment Equipment
- 15.5 Impact Baffle
- 15.4 Commissioning of Rotary-drum Slag Granulation Filter Equipment
- 15.3 Rotary-drum Slag Granulation Equipment
- 15.2 Blowing Box and Water Slag Tank
- 15.1 General Provisions
- 15 Installation Engineering of Slag Treatment Equipment
- 14.5 Injection System
- 14.4 Pulverized Coal Collector
- 14.3 Raw-coal Bin and Pulverized Coal Tank
- 14.2 Bin-type Pump
- 14.1 General Provisions
- 14 Installation Engineering of Blast Furnace Pulverized Coal Injection(PCI)Equipment
- 13.13 Blade-type Inserter
- 13.12 Horizontal Silencer
- 13.11 Commissioning of Gas Blow-off Valve
- 13.10 Gas Blow-off Valve
- 13.9 Commissioning of Pressure-regulating Device of Circumferential Weld Scrubber
- 13.8 Pressure-regulating Device of Circumferential Weld Scrubber
- 13.7 Commissioning of Gas Pressure-regulating Valve Unit
- 13.6 Valve Group for Gas Pressure Regulating
- 13.5 Commissioning of Ash Valve of Dust Collector and Gas Ash Mixer
- 13.4 Ash Valve of Dust Collector and Gas Ash Mixer
- 13.3 Commissioning of Gas Shut-off Valves of Dust Remover
- 13.2 Gas Shut-Off Valves of Dust Remover
- 13.1 General Provisions
- 13 Installation Engineering of Gas Purification Equipment
- 12.8 Commissioning of Valve
- 12.7 Valve
- 12.6 Dehumidifier
- 12.5 Overall No-load Commissioning of Air Filter
- 12.4 Air Filter
- 12.3 Commissioning of Axial Blower
- 12.2 Axial Blower
- 12.1 General Provisions
- 12 Installation Engineering of Blast Furnace Air-blowing Equipment
- 11.6 Commissioning of Hot-blast Stove Valve
- 11.5 Valves of Hot-blast Stove
- 11.4 Commissioning of Combustion Air Fan
- 11.3 Sleeve-type Burner and Combustion Air Fan
- 11.2 Snout and Supports
- 11.1 General Provisions
- 11 Installation Engineering of Hot-blast stove Equipment
- 10.12 Commissioning of Main Chute Cover Carriage
- 10.11 Main Chute Cover Carriage
- 10.10 Commissioning of Swinging Iron Nozzle
- 10.9 Swinging Iron Nozzle
- 10.8 Slag,Iron Chute and Gate
- 10.7 Commissioning of Slag Stopper
- 10.6 Slag Stopper
- 10.5 Commissioning of Taphole Machine
- 10.4 Taphole Machine
- 10.3 Commissioning of Hydraulic Clay Gun
- 10.2 Hydraulic Clay Gun
- 10.1 General Provisions
- 10 Installation Engineering of Tuyere Platform and Cast House Equipment
- 9.5 Commissioning of Belt Charging Equipment
- 9.4 Belt Charging Equipment
- 9.3 Commissioning of Skip Charging Equipment
- 9.2 Skip Charging Equipment
- 9.1 General Provisions
- 9 Installation Engineering of Charging Equipment
- 8.7 Commissioning of Coke Cutter
- 8.6 Coke Cutter
- 8.5 Commissioning of Weighing Hopper
- 8.4 Weighing Hopper
- 8.3 Commissioning of Electric Belt Discharging Car
- 8.2 Electric Belt Discharging Car
- 8.1 General Provisions
- 8 Installation Engineering of Feeding Equipment
- 7.15 Throat Temperature Measuring Device
- 7.14 Throat spray device
- 7.13 Commissioning of Top Ignition Device
- 7.12 Top Ignition Device
- 7.11 Commissioning of Blow-off Valve,Equalizing Valve
- 7.10 Blow-off valve,Equalizer valve on top
- 7.9 Commissioning of Vertical Detecting Device
- 7.8 Vertical Detecting Device
- 7.7 Commissioning of Bell-less Charging Equipment
- 7.6 Receiving Hopper
- 7.5 Charging Bucket
- 7.4 Valve Box
- 7.3 Bellows
- 7.2 Transmission Gear Box with Distribution Chute
- 7.1 General Provisions
- 7 Installation Engineering of Blast Furnace Bell-less Top Equipment
- 6.8 Furnace Top Guard Shield
- 6.7 Throat Steel Brick
- 6.6 Commissioning of Gas Sampling Device
- 6.5 Gas Sampling Device
- 6.4 Slag hole Device and taphole sleeve
- 6.3 Tuyere Device
- 6.2 Furnace Body Cooling Equipment
- 6.1 General Provisions
- 6 Installation Engineering of Blast Furnace Body Equipment
- 5.11 Painting Works for Process Steel Structure
- 5.10 Installation of Large-diameter coil-welded steel pipe
- 5.9 Installation of Shell
- 5.8 Installation of Corridors,Truss
- 5.7 Installation of Frame
- 5.6 Fabrication of Shell
- 5.5 Fabrication of Large-diameter Coil-welded Steel Pipe
- 5.4 Fabrication of Frame,Corridors,Truss
- 5.3 Connection of High-strength Bolts
- 5.2 Welding
- 5.1 General Provisions
- 5 Process Structural Steelwork
- 4.3 Raw Materials
- 4.2 Equipments and Elements
- 4.1 General Provisions
- 4 Mobilization of Equipments and Materials
- 3.4 Padding Plate
- 3.3 Anchor Bolt
- 3.2 Equipment Foundation
- 3.1 General Provisions
- 3 Equipment Foundation,Anchor Bolts and Padding Plate
- 2 Basic Provisions
- 1 General Provisions
- Forward
- Announcement of Ministry of Construction of the People's Republic of China
- 版權(quán)頁
- 封面
- 封面
- 版權(quán)頁
- Announcement of Ministry of Construction of the People's Republic of China
- Forward
- 1 General Provisions
- 2 Basic Provisions
- 3 Equipment Foundation,Anchor Bolts and Padding Plate
- 3.1 General Provisions
- 3.2 Equipment Foundation
- 3.3 Anchor Bolt
- 3.4 Padding Plate
- 4 Mobilization of Equipments and Materials
- 4.1 General Provisions
- 4.2 Equipments and Elements
- 4.3 Raw Materials
- 5 Process Structural Steelwork
- 5.1 General Provisions
- 5.2 Welding
- 5.3 Connection of High-strength Bolts
- 5.4 Fabrication of Frame,Corridors,Truss
- 5.5 Fabrication of Large-diameter Coil-welded Steel Pipe
- 5.6 Fabrication of Shell
- 5.7 Installation of Frame
- 5.8 Installation of Corridors,Truss
- 5.9 Installation of Shell
- 5.10 Installation of Large-diameter coil-welded steel pipe
- 5.11 Painting Works for Process Steel Structure
- 6 Installation Engineering of Blast Furnace Body Equipment
- 6.1 General Provisions
- 6.2 Furnace Body Cooling Equipment
- 6.3 Tuyere Device
- 6.4 Slag hole Device and taphole sleeve
- 6.5 Gas Sampling Device
- 6.6 Commissioning of Gas Sampling Device
- 6.7 Throat Steel Brick
- 6.8 Furnace Top Guard Shield
- 7 Installation Engineering of Blast Furnace Bell-less Top Equipment
- 7.1 General Provisions
- 7.2 Transmission Gear Box with Distribution Chute
- 7.3 Bellows
- 7.4 Valve Box
- 7.5 Charging Bucket
- 7.6 Receiving Hopper
- 7.7 Commissioning of Bell-less Charging Equipment
- 7.8 Vertical Detecting Device
- 7.9 Commissioning of Vertical Detecting Device
- 7.10 Blow-off valve,Equalizer valve on top
- 7.11 Commissioning of Blow-off Valve,Equalizing Valve
- 7.12 Top Ignition Device
- 7.13 Commissioning of Top Ignition Device
- 7.14 Throat spray device
- 7.15 Throat Temperature Measuring Device
- 8 Installation Engineering of Feeding Equipment
- 8.1 General Provisions
- 8.2 Electric Belt Discharging Car
- 8.3 Commissioning of Electric Belt Discharging Car
- 8.4 Weighing Hopper
- 8.5 Commissioning of Weighing Hopper
- 8.6 Coke Cutter
- 8.7 Commissioning of Coke Cutter
- 9 Installation Engineering of Charging Equipment
- 9.1 General Provisions
- 9.2 Skip Charging Equipment
- 9.3 Commissioning of Skip Charging Equipment
- 9.4 Belt Charging Equipment
- 9.5 Commissioning of Belt Charging Equipment
- 10 Installation Engineering of Tuyere Platform and Cast House Equipment
- 10.1 General Provisions
- 10.2 Hydraulic Clay Gun
- 10.3 Commissioning of Hydraulic Clay Gun
- 10.4 Taphole Machine
- 10.5 Commissioning of Taphole Machine
- 10.6 Slag Stopper
- 10.7 Commissioning of Slag Stopper
- 10.8 Slag,Iron Chute and Gate
- 10.9 Swinging Iron Nozzle
- 10.10 Commissioning of Swinging Iron Nozzle
- 10.11 Main Chute Cover Carriage
- 10.12 Commissioning of Main Chute Cover Carriage
- 11 Installation Engineering of Hot-blast stove Equipment
- 11.1 General Provisions
- 11.2 Snout and Supports
- 11.3 Sleeve-type Burner and Combustion Air Fan
- 11.4 Commissioning of Combustion Air Fan
- 11.5 Valves of Hot-blast Stove
- 11.6 Commissioning of Hot-blast Stove Valve
- 12 Installation Engineering of Blast Furnace Air-blowing Equipment
- 12.1 General Provisions
- 12.2 Axial Blower
- 12.3 Commissioning of Axial Blower
- 12.4 Air Filter
- 12.5 Overall No-load Commissioning of Air Filter
- 12.6 Dehumidifier
- 12.7 Valve
- 12.8 Commissioning of Valve
- 13 Installation Engineering of Gas Purification Equipment
- 13.1 General Provisions
- 13.2 Gas Shut-Off Valves of Dust Remover
- 13.3 Commissioning of Gas Shut-off Valves of Dust Remover
- 13.4 Ash Valve of Dust Collector and Gas Ash Mixer
- 13.5 Commissioning of Ash Valve of Dust Collector and Gas Ash Mixer
- 13.6 Valve Group for Gas Pressure Regulating
- 13.7 Commissioning of Gas Pressure-regulating Valve Unit
- 13.8 Pressure-regulating Device of Circumferential Weld Scrubber
- 13.9 Commissioning of Pressure-regulating Device of Circumferential Weld Scrubber
- 13.10 Gas Blow-off Valve
- 13.11 Commissioning of Gas Blow-off Valve
- 13.12 Horizontal Silencer
- 13.13 Blade-type Inserter
- 14 Installation Engineering of Blast Furnace Pulverized Coal Injection(PCI)Equipment
- 14.1 General Provisions
- 14.2 Bin-type Pump
- 14.3 Raw-coal Bin and Pulverized Coal Tank
- 14.4 Pulverized Coal Collector
- 14.5 Injection System
- 15 Installation Engineering of Slag Treatment Equipment
- 15.1 General Provisions
- 15.2 Blowing Box and Water Slag Tank
- 15.3 Rotary-drum Slag Granulation Equipment
- 15.4 Commissioning of Rotary-drum Slag Granulation Filter Equipment
- 15.5 Impact Baffle
- 16 Installation Engineering of Iron Treatment Equipment
- 16.1 General Provisions
- 16.2 Iron Casting Machine
- 16.3 Commissioning of Iron Casting Machine
- 16.4 Floor-type Tip-over Windlass
- 16.5 Commissioning of Floor-type Tip-over Windlass
- 16.6 Front Column
- 16.7 Plate-type Rotary Unloader
- 16.8 Commissioning of Plate-type Rotary Unloader
- 17 Installation Engineering of Milling Equipment
- 17.1 General Provisions
- 17.2 2-stage Vibrating Coke Crusher
- 17.3 Commissioning of 2-stage Vibrating Coke Crusher
- 17.4 Clay Mill
- 17.5 Commissioning of Clay Mill
- 17.6 Shaper
- 17.7 Commissioning of Shaper
- 18 Installation Engineering of Water Treatment Equipment
- 18.1 General Provisions
- 18.2 Top Trolley of Sedimentation Tank
- 18.3 Commissioning of Top Trolley of Sedimentation Tank
- 18.4 Float-type Oil Collector of Sedimentation Tank
- 18.5 Commissioning of Float-type Oil Collector of Sedimentation Tank
- 18.6 Horizontal Plate-and-frame Filter Press
- 18.7 Commissioning of Horizontal Plate-and-frame Filter Press
- 18.8 Pressure-type Cylinder-shaped Filter
- 18.9 Ion-exchange Resin Tower
- 18.10 Top Fan on Cooling Tower
- 18.11 Commissioning of Top Fan on Cooling Tower
- 18.12 Metal Tank
- 18.13 Vertical Mixer
- 18.14 Commissioning of Vertical Mixer
- 19 Overall Leakage Test for Blast Furnace System
- 19.1 General Provisions
- 19.2 Overall Leakage Test for Blast Furnace System
- Appendix A Quality Record Sheet for Sub-divisional Works of Installation Acceptance of Metallurgical Machinery Ironmaking Equipment Engineering
- Appendix B Quality Acceptance Record Sheet for Divisional Works of Installation for Metallurgical Machinery Ironmaking Equipment Engineering
- Appendix C Quality Acceptance Record Sheet for Unit Works of Installation for Metallurgical Machinery Ironmaking Equipment Engineering
- Appendix D No-load Commissioning Record of Metallurgical Machinery Ironmaking Equipment Engineering
- Appendix E Pressure Test for Pressure-holding Equipment
- Appendix F Sealing Requirements between valve petal and Valve Seat for Blow-off Valve,Equalizing Valve,Hot-blast stove Shut-off Valve,Gas Shut-off Valve and Ash Valve of Dust Collector
- Explanation of Wording in This Code
- Explanation for Provisions
- 1 General Provisions
- 2 Basic Provisions
- 3 Equipment Foundation,Anchor Bolts and Padding plate
- 3.1 General Provisions
- 3.2 Equipment Foundation
- 3.3 Anchor Bolt
- 3.4 Padding Plate
- 4 Mobilization of Equipments and Materials
- 4.1 General Provisions
- 4.2 Equipments and Elements
- 4.3 Raw Materials
- 5 Process Structural Steelwork
- 5.2 Welding
- 5.4 Fabrication of Frame,Corridors Truss
- 5.6 Fabrication of Shell
- 5.7 Installation of Frame
- 5.9 Installation of Shell
- 5.11 Painting Works for Process Steel Structure
- 6 Installation Engineering of Blast Furnace Body Equipment
- 6.2 Furnace Body Cooling Equipment
- 6.3 Tuyere Device
- 6.4 Slag Hole Device and Taphole Sleeve
- 7 Installation Engineering of Blast Furnace Bell-less Top Equipment
- 7.1 General Provisions
- 7.2 Transmission Gear Box With Distribution Chute
- 7.4 Valve Box
- 7.5 Charging Bucket
- 7.6 Receiving Hopper
- 7.10 Blow-off Valve,Equalizer Valve on Top
- 10 Installation Engineering of Tuyere Platform and Cast House Equipment
- 10.2 Hydraulic Clay Gun
- 10.4 Taphole Machine
- 10.6 Slag Stopper
- 10.11 Main Chute Cover Carriage
- 11 Installation Engineering of Hot-blast stove Equipment
- 11.5 Valve of Hot-blast Stove
- 12 Installation Engineering of Blast Furnace Air-blowing Equipment
- 12.2 Axial Blower
- 12.7 Valve
- 13 Installation Engineering of Gas Purification Equipment
- 13.6 Valve Group for Gas Pressure Regulating
- 13.8 Pressure-regulating Device of Circumferential Weld Scrubber
- 14 Installation Engineering of Blast Furnace Pulverized Coal Injection(PCI)Equipment
- 14.3 Raw-coal Bin and Pulverized Coal Tank
- 14.4 Pulverized Coal Collector
- 17 Installation Engineering of Milling Equipment
- 17.2 2-stage Vibrating Coke Crusher
- 17.6 Shaper
- 18 Installation Engineering of Water Treatment Equipment
- 18.1 General Provisions
- 18.12 Metal Tank
- 18.14 Commissioning of Vertical Mixer
- 19 Overall Leakage Test for Blast Furnace System
- 19.1 General Provisions
- 19.2 Overall Leakage Test for Blast Furnace System 更新時(shí)間:2020-09-24 18:15:53
作者還寫過
共84本