- DL/T5210.6-2009電力建設(shè)施工質(zhì)量驗收及評價規(guī)程第6部分:水處理劑制氫設(shè)備和系統(tǒng)(英文版)
- 電力企業(yè)聯(lián)合會
- 452字
- 2020-09-24 18:17:32
Foreword
The standard series DL/T 5210“Code for Construction Quality Acceptance and Evaluation of Electric Power Construct”consists of 8 parts:
——DL/T 5210.1 Part 1:Civil Work
——DL/T 5210.2 Part 2:Boiler Unit
——DL/T 5210.3 Part 3:Turbine Generator Unit
——DL/T 5210.4 Part 4:Instrumentation and Control
——DL/T 5210.5 Part 5:Piping & System
——DL/T 5210.6 Part 6:The Equipment and the System with the Water Treatment and Hydrogen Generation
——DL/T 5210.7 Part 7:Welding
——DL/T 5210.8 Part 8:Processing Preparation
This Part is part 6 of DL/T 5210.
This Part is formulated by the National Development and Reform Commission according to the requirements of the document“Announcement on Issuing the Professional Standard Project Planning in 2008”(Fagaiban Gongye〔2008〕No.1242).
During drafting of this Part,the content of“Standard for Quality Inspection and Evaluation of Thermal Power Construction(tentative)-Part of Water treatment and hydrogen generation”(GuoDianDianYuan〔2001〕No.210)of the former State Power Corporation was referred to.
AppendixA of this Part is the Informative Appendix,Appendix B,Appendix C and Appendix D of this Part are the Normative Appendixes.
This Part is proposed by the China Electricity Council.
The Technical Committee for Standardization of Thermal Power Construction in power industry is under the jurisdiction of and in charge of the explanation of this Part.
Chief drafting organization:Hebei No.1 Electric Power Construction Company
Participating organizations:No.1 Engineering Company of Northeast Electricity Authority,the First Electric Power Construction Company of Jiangsu Province,the Zhejiang Thermal Power Construction Company
Chief drafting staff:Chen Zhihua,Liu Yiqiu,Ma Zhijun,Zhao Zhuren,Zhang Suoqing,Jia Yong,Sun Jian,Sun Weidong,Zhu Wenjie
The“Standard for Quality Inspection and Evaluation of Thermal Power Construction(tentative)-Section of Water Treatment and Hydrogen Generation”(GuoDianDianYuan〔2001〕No.210)issued by the capital construction department of the former Ministry of Water Resources and Electric Power is abolished simultaneously since the implementation date of this Part.
During the process of implementing this Part,the relevant opinions and advice,whenever necessary,can be posted or passed on to the Standardization Center of the China Electricity Council(No.1,Baiguang Road Ertiao,Beijing 100761).
English translators:Chen Yanfang,Jiang Hong,Meng Lixue
Chief reviewers:Su Zhilin,Zhan Zifeng,Zhang Xianqiu,Guan Yiming
- GB50713-2011板帶精整工藝設(shè)計規(guī)范(英文版)
- GB 50227-2017 并聯(lián)電容器裝置設(shè)計規(guī)范
- GB 50243-2016 通風與空調(diào)工程施工質(zhì)量驗收規(guī)范
- GB/T 51183-2016 農(nóng)業(yè)溫室結(jié)構(gòu)荷載規(guī)范
- GB50148-2010電氣裝置安裝工程電力變壓器、油浸電抗器、互感器施工及驗收規(guī)范(英文版)
- GB 50084-2017 自動噴水滅火系統(tǒng)設(shè)計規(guī)范
- GB 50469-2016 橡膠工廠環(huán)境保護設(shè)計規(guī)范
- GB 51006-2014 石油化工建(構(gòu))筑物結(jié)構(gòu)荷載規(guī)范(英文版)
- GB50439-2015煉鋼工程設(shè)計規(guī)范(英文版)
- GB 51133-2015 醫(yī)藥工業(yè)環(huán)境保護設(shè)計規(guī)范
- 冶金石灰焙燒工程設(shè)計標準
- 鄭州軌道交通安裝工藝運營需求標準
- 海上架空輸電線路設(shè)計技術(shù)規(guī)程
- 電力系統(tǒng)無功補償及調(diào)壓設(shè)計技術(shù)導則
- GB 51181-2016 煤炭洗選工程節(jié)能設(shè)計規(guī)范