1.2 Structure of CRTS Ⅱ Slab Ballastless Track on Subgrade

The CRTS Ⅱslab ballastless track on subgrade is composed of four parts,from top to bottom(taking the straight line section as example):20 cm thick concrete track slab,3 cm thick mortar cushion,30 cm thick concrete bed plate,subgrade bed(composed of surface layer and bottom layer).Track ultrahigh is realized by subgrade surface layer.The supporting layers of left and right track shall be filled with mineral mixture,and its top surface shall be sealed with C25 concrete at least 15 cm thick.That the supporting layer edge at both sides to berm shall serve as 4% drainage slope outward and the surface is sealed with asphalt concrete(10 cm).The structure of ballastless track on subgrade is shown in Figure 2.

The structure of track slab and mortar cushion on subgrade is the same as that on bridge,the supporting layer is constructed with semi-plastic concrete(C15,without reinforcement).

主站蜘蛛池模板: 历史| 克拉玛依市| 固始县| 紫金县| 巴林右旗| 辉县市| 英山县| 镇康县| 望都县| 翼城县| 乌拉特前旗| 玉环县| 四川省| 阆中市| 宜昌市| 开阳县| 行唐县| 乌审旗| 天镇县| 彩票| 合作市| 绥滨县| 徐水县| 祁连县| 尉氏县| 克东县| 石棉县| 伊金霍洛旗| 昌黎县| 炉霍县| 嘉善县| 达日县| 柳河县| 江孜县| 济阳县| 六盘水市| 长海县| 巴南区| 汪清县| 台南县| 洛川县|