本標準為中華人民共和國電力行業標準,由住房城鄉建設部組織翻譯的英文版,用于對外交流和國內對外的合作。中文版已于2012年出版。本標準適用于火力發電廠汽輪發電機組、燃氣—蒸汽聯合循環汽輪發電機組、核電站汽輪發電機組。主要內容包括:總則,術語,基本規定,汽輪機本體,發電機和勵磁裝置,調節保安裝置和油系統,汽輪機本體范圍的管道,輔助設備,附屬機械,橋式起重機、本體保溫、化妝板,汽輪發電機組的調整、啟動、試運行,附錄等。
最新章節
- 11.13 Trial Run of Turbo-generator with Load
- 11.10 Hydrogen Filling of Generator and Operation of Hydrogen System
- 11.9 Start-up and No-load Trial Run of Turbo-generators
- 11.7 General Provisions for Entire System Start-up and Trial Run
- 11.6 Trial Run of Oil System and Oil Flushing
- 11.5 Trial Run of Steam Turbine Auxiliary Equipment
品牌:中國計劃出版社有限公司
上架時間:2020-09-25 11:08:14
出版社:中國計劃出版社
本書數字版權由中國計劃出版社有限公司提供,并由其授權上海閱文信息技術有限公司制作發行
- 11.13 Trial Run of Turbo-generator with Load 更新時間:2020-09-25 11:17:20
- 11.10 Hydrogen Filling of Generator and Operation of Hydrogen System
- 11.9 Start-up and No-load Trial Run of Turbo-generators
- 11.7 General Provisions for Entire System Start-up and Trial Run
- 11.6 Trial Run of Oil System and Oil Flushing
- 11.5 Trial Run of Steam Turbine Auxiliary Equipment
- 11.4 Leakage Check of Steam Turbine Vacuum System
- 11.3 Purging and Flushing of Steam-water Pipelines
- 11.2 Trial Run of Accessory Machinery
- 11 Regulation,Start-up and Trial Run of Turbo-generator
- 10.1 Bridge Crane
- 10 Bridge Crane,Casing in Insulation and Enclosure
- 9.3 Common Centrifugal Pumps
- 9.2 Installation of Accessory Machinery
- 9 Accessory Machinery
- 8.6 Tanks and Deaerator
- 8.4 Extraction Equipment
- 8.3 Air Cooling Device
- 8.2 Condenser
- 8.1 General Provisions
- 8 Auxiliary Equipment
- 7.3 Installation of Piping
- 7.2 Valves and Special Parts
- 7.1 General Provisions
- 7 Piping of Steam Turbine
- 6.7 Lubricating Oil System
- 6.6 Control Oil System
- 6.4 Steam Valve and Its Driving Device
- 6.2 Electro-hydraulic Regulation and Protection Device
- 6.1 General Provisions
- 6 Regulation and Protection Device and Oil System
- 5.9 Excitation Device
- 5.8 Cooling Water System
- 5.7 Water Inlet/Outlet Support and Cooler
- 5.6 Shaft Sealing and Gas Cooling System of Hydrogen-cooled and Water-hydrogen-hydrogen-cooled Generator
- 5.5 Stator Position Adjustment and Cover Closing
- 5.4 Generator Rotor
- 5.3 Stator
- 5.2 Bearing Pedestals and Bearing
- 5.1 General Provisions
- 5 Generator and Excitation Device
- 4.9 Cylinder Covering
- 4.8 Turning Gear and Speed Reducer
- 4.7 Installation of Equipment in Flow Passage
- 4.6 Steam Turbine Rotor
- 4.5 Bearing and Oil Baffle
- 4.4 Casing,Bearing Pedestals and Sliding Pin System
- 4.3 Soleplates and Pad Blocks
- 4.2 Turbine Proper Foundation
- 4 Steam Turbine Proper
- 3.3 Equipment and System Erection
- 3.1 Equipment Unpacking Inspection and Storage
- 3 Basic Requirements
- 1 General Provisions
- Explanation of Provisions
- List of Quoted Standards
- Explanation of Wording in This Specification
- Appendix J Oil Quality Rating Criterion
- Appendix H Unit Vibration Criterion
- Appendix G Standard for Leakage Test of Generator Hydrogen System
- Appendix F Sag Calculation Formula for Centering with Steel Wire
- Appendix E Physical Performance of Common S/T Bolting Materials
- Appendix D Common Grease Types and Scope of Application
- Appendix C Common Sealing Material Types and Scope of Application
- Appendix B Mix Proportion for Cylinder Coating
- Appendix A Requirements for Construction of Mortar and Pads for S/T Soleplate
- 11.14 Documentation for Quality Acceptance
- 11.13 Trial Run of Turbo-generator with Load
- 11.12 Hot Flushing of Air Cooling System
- 11.11 Trial Run of Dual Internal Water Cooled Generator and Water-hydrogen-hydrogen-cooled Generator
- 11.10 Hydrogen Filling of Generator and Operation of Hydrogen System
- 11.9 Start-up and No-load Trial Run of Turbo-generators
- 11.8 Adjustment and Testing of the Control System and Automatic Protective Devices Prior to Start-up of Steam Turbine
- 11.7 General Provisions for Entire System Start-up and Trial Run
- 11.6 Trial Run of Oil System and Oil Flushing
- 11.5 Trial Run of Steam Turbine Auxiliary Equipment
- 11.4 Leakage Check of Steam Turbine Vacuum System
- 11.3 Purging and Flushing of Steam-water Pipelines
- 11.2 Trial Run of Accessory Machinery
- 11.1 General Provisions
- 11 Regulation,Start-up and Trial Run of Turbo-generator
- 10.4 Documentation for Quality Acceptance
- 10.3 Enclosure,Platform,Ladder and Cover of Steam Turbine
- 10.2 Insulation and Painting of Steam Turbine Equipments
- 10.1 Bridge Crane
- 10 Bridge Crane,Casing in Insulation and Enclosure
- 9.9 Documentation for Quality Acceptance
- 9.8 Rotating Filter
- 9.7 Air Cooling and Water Cooling Fans
- 9.6 Deep Well Pumps
- 9.5 Vertical Pumps
- 9.4 Feed Water Pump Units and Their Associated Devices
- 9.3 Common Centrifugal Pumps
- 9.2 Installation of Accessory Machinery
- 9.1 General Provisions
- 9 Accessory Machinery
- 8.8 Documentation for Quality Acceptance
- 8.7 Temperature and Pressure Reducer
- 8.6 Tanks and Deaerator
- 8.5 Heat Exchanger
- 8.4 Extraction Equipment
- 8.3 Air Cooling Device
- 8.2 Condenser
- 8.1 General Provisions
- 8 Auxiliary Equipment
- 7.4 Documentation for Quality Acceptance
- 7.3 Installation of Piping
- 7.2 Valves and Special Parts
- 7.1 General Provisions
- 7 Piping of Steam Turbine
- 6.9 Documentation for Quality Acceptance
- 6.8 Sealing Oil System of Hydrogen-cooled Generator
- 6.7 Lubricating Oil System
- 6.6 Control Oil System
- 6.5 Centrifugal Main Oil Pump
- 6.4 Steam Valve and Its Driving Device
- 6.3 Hydraulic Regulation and Protection Device
- 6.2 Electro-hydraulic Regulation and Protection Device
- 6.1 General Provisions
- 6 Regulation and Protection Device and Oil System
- 5.10 Documentation for Quality Acceptance
- 5.9 Excitation Device
- 5.8 Cooling Water System
- 5.7 Water Inlet/Outlet Support and Cooler
- 5.6 Shaft Sealing and Gas Cooling System of Hydrogen-cooled and Water-hydrogen-hydrogen-cooled Generator
- 5.5 Stator Position Adjustment and Cover Closing
- 5.4 Generator Rotor
- 5.3 Stator
- 5.2 Bearing Pedestals and Bearing
- 5.1 General Provisions
- 5 Generator and Excitation Device
- 4.11 Documentation for Quality Acceptance
- 4.10 Secondary Grouting and Curing
- 4.9 Cylinder Covering
- 4.8 Turning Gear and Speed Reducer
- 4.7 Installation of Equipment in Flow Passage
- 4.6 Steam Turbine Rotor
- 4.5 Bearing and Oil Baffle
- 4.4 Casing,Bearing Pedestals and Sliding Pin System
- 4.3 Soleplates and Pad Blocks
- 4.2 Turbine Proper Foundation
- 4.1 General Provisions
- 4 Steam Turbine Proper
- 3.3 Equipment and System Erection
- 3.2 Civil Works
- 3.1 Equipment Unpacking Inspection and Storage
- 3 Basic Requirements
- 2 Terminology
- 1 General Provisions
- Foreword
- 版權信息
- 封面
- 封面
- 版權信息
- Foreword
- 1 General Provisions
- 2 Terminology
- 3 Basic Requirements
- 3.1 Equipment Unpacking Inspection and Storage
- 3.2 Civil Works
- 3.3 Equipment and System Erection
- 4 Steam Turbine Proper
- 4.1 General Provisions
- 4.2 Turbine Proper Foundation
- 4.3 Soleplates and Pad Blocks
- 4.4 Casing,Bearing Pedestals and Sliding Pin System
- 4.5 Bearing and Oil Baffle
- 4.6 Steam Turbine Rotor
- 4.7 Installation of Equipment in Flow Passage
- 4.8 Turning Gear and Speed Reducer
- 4.9 Cylinder Covering
- 4.10 Secondary Grouting and Curing
- 4.11 Documentation for Quality Acceptance
- 5 Generator and Excitation Device
- 5.1 General Provisions
- 5.2 Bearing Pedestals and Bearing
- 5.3 Stator
- 5.4 Generator Rotor
- 5.5 Stator Position Adjustment and Cover Closing
- 5.6 Shaft Sealing and Gas Cooling System of Hydrogen-cooled and Water-hydrogen-hydrogen-cooled Generator
- 5.7 Water Inlet/Outlet Support and Cooler
- 5.8 Cooling Water System
- 5.9 Excitation Device
- 5.10 Documentation for Quality Acceptance
- 6 Regulation and Protection Device and Oil System
- 6.1 General Provisions
- 6.2 Electro-hydraulic Regulation and Protection Device
- 6.3 Hydraulic Regulation and Protection Device
- 6.4 Steam Valve and Its Driving Device
- 6.5 Centrifugal Main Oil Pump
- 6.6 Control Oil System
- 6.7 Lubricating Oil System
- 6.8 Sealing Oil System of Hydrogen-cooled Generator
- 6.9 Documentation for Quality Acceptance
- 7 Piping of Steam Turbine
- 7.1 General Provisions
- 7.2 Valves and Special Parts
- 7.3 Installation of Piping
- 7.4 Documentation for Quality Acceptance
- 8 Auxiliary Equipment
- 8.1 General Provisions
- 8.2 Condenser
- 8.3 Air Cooling Device
- 8.4 Extraction Equipment
- 8.5 Heat Exchanger
- 8.6 Tanks and Deaerator
- 8.7 Temperature and Pressure Reducer
- 8.8 Documentation for Quality Acceptance
- 9 Accessory Machinery
- 9.1 General Provisions
- 9.2 Installation of Accessory Machinery
- 9.3 Common Centrifugal Pumps
- 9.4 Feed Water Pump Units and Their Associated Devices
- 9.5 Vertical Pumps
- 9.6 Deep Well Pumps
- 9.7 Air Cooling and Water Cooling Fans
- 9.8 Rotating Filter
- 9.9 Documentation for Quality Acceptance
- 10 Bridge Crane,Casing in Insulation and Enclosure
- 10.1 Bridge Crane
- 10.2 Insulation and Painting of Steam Turbine Equipments
- 10.3 Enclosure,Platform,Ladder and Cover of Steam Turbine
- 10.4 Documentation for Quality Acceptance
- 11 Regulation,Start-up and Trial Run of Turbo-generator
- 11.1 General Provisions
- 11.2 Trial Run of Accessory Machinery
- 11.3 Purging and Flushing of Steam-water Pipelines
- 11.4 Leakage Check of Steam Turbine Vacuum System
- 11.5 Trial Run of Steam Turbine Auxiliary Equipment
- 11.6 Trial Run of Oil System and Oil Flushing
- 11.7 General Provisions for Entire System Start-up and Trial Run
- 11.8 Adjustment and Testing of the Control System and Automatic Protective Devices Prior to Start-up of Steam Turbine
- 11.9 Start-up and No-load Trial Run of Turbo-generators
- 11.10 Hydrogen Filling of Generator and Operation of Hydrogen System
- 11.11 Trial Run of Dual Internal Water Cooled Generator and Water-hydrogen-hydrogen-cooled Generator
- 11.12 Hot Flushing of Air Cooling System
- 11.13 Trial Run of Turbo-generator with Load
- 11.14 Documentation for Quality Acceptance
- Appendix A Requirements for Construction of Mortar and Pads for S/T Soleplate
- Appendix B Mix Proportion for Cylinder Coating
- Appendix C Common Sealing Material Types and Scope of Application
- Appendix D Common Grease Types and Scope of Application
- Appendix E Physical Performance of Common S/T Bolting Materials
- Appendix F Sag Calculation Formula for Centering with Steel Wire
- Appendix G Standard for Leakage Test of Generator Hydrogen System
- Appendix H Unit Vibration Criterion
- Appendix J Oil Quality Rating Criterion
- Explanation of Wording in This Specification
- List of Quoted Standards
- Explanation of Provisions
- 1 General Provisions
- 3 Basic Requirements
- 3.1 Equipment Unpacking Inspection and Storage
- 3.3 Equipment and System Erection
- 4 Steam Turbine Proper
- 4.2 Turbine Proper Foundation
- 4.3 Soleplates and Pad Blocks
- 4.4 Casing,Bearing Pedestals and Sliding Pin System
- 4.5 Bearing and Oil Baffle
- 4.6 Steam Turbine Rotor
- 4.7 Installation of Equipment in Flow Passage
- 4.8 Turning Gear and Speed Reducer
- 4.9 Cylinder Covering
- 5 Generator and Excitation Device
- 5.1 General Provisions
- 5.2 Bearing Pedestals and Bearing
- 5.3 Stator
- 5.4 Generator Rotor
- 5.5 Stator Position Adjustment and Cover Closing
- 5.6 Shaft Sealing and Gas Cooling System of Hydrogen-cooled and Water-hydrogen-hydrogen-cooled Generator
- 5.7 Water Inlet/Outlet Support and Cooler
- 5.8 Cooling Water System
- 5.9 Excitation Device
- 6 Regulation and Protection Device and Oil System
- 6.1 General Provisions
- 6.2 Electro-hydraulic Regulation and Protection Device
- 6.4 Steam Valve and Its Driving Device
- 6.6 Control Oil System
- 6.7 Lubricating Oil System
- 7 Piping of Steam Turbine
- 7.1 General Provisions
- 7.2 Valves and Special Parts
- 7.3 Installation of Piping
- 8 Auxiliary Equipment
- 8.1 General Provisions
- 8.2 Condenser
- 8.3 Air Cooling Device
- 8.4 Extraction Equipment
- 8.6 Tanks and Deaerator
- 9 Accessory Machinery
- 9.2 Installation of Accessory Machinery
- 9.3 Common Centrifugal Pumps
- 10 Bridge Crane,Casing in Insulation and Enclosure
- 10.1 Bridge Crane
- 11 Regulation,Start-up and Trial Run of Turbo-generator
- 11.2 Trial Run of Accessory Machinery
- 11.3 Purging and Flushing of Steam-water Pipelines
- 11.4 Leakage Check of Steam Turbine Vacuum System
- 11.5 Trial Run of Steam Turbine Auxiliary Equipment
- 11.6 Trial Run of Oil System and Oil Flushing
- 11.7 General Provisions for Entire System Start-up and Trial Run
- 11.9 Start-up and No-load Trial Run of Turbo-generators
- 11.10 Hydrogen Filling of Generator and Operation of Hydrogen System
- 11.13 Trial Run of Turbo-generator with Load 更新時間:2020-09-25 11:17:20