舉報

會員
GB50403-2007煉鋼機械設(shè)備工程安裝驗收規(guī)范(英文版)
最新章節(jié):
21.1 General Requirements
本規(guī)范共分21章,包括總則,基本規(guī)定,設(shè)備基礎(chǔ)、地腳螺栓和墊板,設(shè)備和材料進場,轉(zhuǎn)爐設(shè)備安裝,氧槍和副槍設(shè)備安裝,煙罩設(shè)備安裝,余熱鍋爐(汽化冷卻裝置)設(shè)備安裝、電弧爐設(shè)備安裝,鋼包精煉爐(LF)設(shè)備安裝,鋼包真空精煉爐(VD)及真空吹氧脫碳爐(VOD)設(shè)備安裝,循環(huán)真空脫氣精煉爐(RH)設(shè)備安裝,氬氧脫碳精煉爐(AOD)設(shè)備安裝,澆注設(shè)備安裝,連續(xù)鑄鋼設(shè)備安裝,出坯和精整設(shè)備安裝,混鐵爐設(shè)備安裝,鐵水預(yù)處理設(shè)備安裝,原料系統(tǒng)設(shè)備安裝,煤氣凈化設(shè)備安裝,煉鋼機械設(shè)備試運轉(zhuǎn)以及6個附錄。
最新章節(jié)
- 21.1 General Requirements
- 21 Test Run of Steel-making Mechanical Equipment
- 18.7 Slag Remover
- 18.3 Stirring Desulfurization Equipment
- 18 Installation of Hot Metal Pretreatment Equipment
- 17.3 Furnace Shell and Tension Sleeve
品牌:中國計劃出版社有限公司
上架時間:2020-09-24 18:09:53
出版社:中國計劃出版社
本書數(shù)字版權(quán)由中國計劃出版社有限公司提供,并由其授權(quán)上海閱文信息技術(shù)有限公司制作發(fā)行
- 21.1 General Requirements 更新時間:2020-09-24 18:26:05
- 21 Test Run of Steel-making Mechanical Equipment
- 18.7 Slag Remover
- 18.3 Stirring Desulfurization Equipment
- 18 Installation of Hot Metal Pretreatment Equipment
- 17.3 Furnace Shell and Tension Sleeve
- 17.2 Base and Race
- 17 Installation of Hot Metal Mixer
- 16.8 Centering Device
- 16.7 Cross Travelling Trolley
- 16.2 Conveying Roller Table
- 16 Installation of Discharging and Finishing Equipment
- 15.10 Burring Machine
- 15.7 Flame Cutting Machine
- 15.6 Dummy Bar Receiving and Sending Device and Dummy Bar Disconnecting Device
- 15.5 Withdrawal and Straightening Unit
- 15.4 Exchange Device for Segment
- 15.3 Secondary Cooling Device
- 15.2 Mold and Vibrating Device
- 15 Installation of Continuous Steel-casting Equipment
- 14.3 Tundish Car and Track
- 14.2 Ladle Turret
- 14 Installation of Casting equipment
- 13.1 General Requirements
- 13 Installation of Argon Oxygen Decarburization Refining Furnace(AOD)
- 11.7 Vacuum Device
- 11.2 Vacuum Tank
- 11.1 General Requirements
- 11 Installation of Vacuum Ladle Refining Furnace(VD)and Vacuum Oxygen Decarburization Converter(VOD)
- 10.3 Buggy Ladle
- 10 Installation of Ladle Refining Furnace(LF)
- 9.7 Furnace Cover,Electrode Rotating Mechanism and Furnace Cover Lifting Mechanism
- 9.6 Furnace Body
- 9.5 Tilting Locking Device
- 9.3 Cradle
- 9.2 Rail Chair
- 9 Installation of Electric Arc Furnace
- 8.3 Boiler Barrel
- 8.2 Flue
- 8.1 General Requirements
- 8 Installation of Waste Heat Boiler(Vaporization Cooling Device)
- 6.2 Oxygen Lance,Sublance and Lifting Device
- 6 Installation of Oxygen Lance and Sublance
- 5.4 Furnace Body
- 5.3 Backing Ring
- 5.1 General Requirements
- 5 Installation of Converter
- 4.3 Raw Materials
- 4.2 Equipment
- 4.1 General Requirements
- 4 Equipment and Material Mobilization
- 3.3 Foundation Bolt
- 3.2 Equipment Foundation
- 3.1 General Requirements
- 3 Equipment Foundation,F(xiàn)oundation Bolt and Base Plate
- 2 Basic Requirements
- 1 General Provisions
- Explanation of Provisions
- Explanation of Wording in This Code
- Appendix F Postweld Heat Treatment of Welded Joint
- Appendix E Criteria for Appearance Quality of Weld
- Appendix D Record of No-load Test Run of Steel-making Mechanical Equipment
- Appendix C Record of Quality Acceptance for Unit Works of Installation of Steel-making Mechanical Equipment
- Appendix B Record of Quality Acceptance for Sub-unit Works of Installation of Steel-making Mechanical Equipment
- Appendix A Record of Quality Acceptance for Subdivisional Works of Installation of Steel-making Mechanical Equipment
- 21.15 Test Run of Hot Metal Pretreatment Equipment
- 21.14 Test Run of Hot Metal Mixer
- 21.13 Test Run of Discharging and Finishing Equipment
- 21.12 Test Run of Continuous Steel-casting Equipment
- 21.11 Test Run of Casting equipment
- 21.10 Test Run of Argon Oxygen Decarburization Refining Furnace(AOD)
- 21.9 Test Run of Recirculation Vacuum Degassing Refining Furnace(RH)
- 21.8 Test Run of Vacuum Ladle Refining Furnace(VD)and Vacuum Oxygen Decarburization Converter(VOD)
- 21.7 Test Run of Ladle Refining Furnace(LF)
- 21.6 Test Run of Electric Arc Furnace
- 21.5 Test Run of Waste Heat Boiler System
- 21.4 Test Run of Hood
- 21.3 Test Run of Oxygen Lance and Sublance
- 21.2 Test Run of Converter
- 21.1 General Requirements
- 21 Test Run of Steel-making Mechanical Equipment
- 20.2 Gas Purification Device
- 20.1 General Requirements
- 20 Installation of Gas Purification Device
- 19.3 Collecting Funnel and Rotating Funnel
- 19.2 Weighing Funnel
- 19.1 General Requirements
- 19 Installation of Raw Material System
- 18.7 Slag remover
- 18.6 Track for Molten Iron Tank Car
- 18.5 Molten Iron Tank Car
- 18.4 Dephosphorization Spray Gun
- 18.3 Stirring Desulfurization Equipment
- 18.2 Desulfurizer(Dephosphorizer)Conveying Device
- 18.1 General Requirements
- 18 Installation of Hot Metal Pretreatment Equipment
- 17.5 Cover Manipulating Winch
- 17.4 Tilting Device
- 17.3 Furnace Shell and Tension Sleeve
- 17.2 Base and Race
- 17.1 General Requirements
- 17 Installation of Hot Metal Mixer
- 16.8 Centering Device
- 16.7 Cross Travelling Trolley
- 16.6 Lifting Guard Board and Marking Punch
- 16.5 Scarfer
- 16.4 Pusher,Puller and Tilter
- 16.3 Turntable
- 16.2 Conveying Roller Table
- 16.1 General Requirements
- 16 Installation of Discharging and Finishing Equipment
- 15.10 Burring Machine
- 15.9 Crop Collecting Device
- 15.8 Rocking Shear
- 15.7 Flame Cutting Machine
- 15.6 Dummy Bar Receiving and Sending Device and Dummy Bar Disconnecting Device
- 15.5 Withdrawal and Straightening Unit
- 15.4 Exchange Device for Segment
- 15.3 Secondary Cooling Device
- 15.2 Mold and Vibrating Device
- 15.1 General Requirements
- 15 Installation of Continuous Steel-casting Equipment
- 14.4 Roaster
- 14.3 Tundish Car and Track
- 14.2 Ladle Turret
- 14.1 General Requirements
- 14 Installation of Casting Equipment
- 13.6 Removable Guard Board and Fixed Guard Board
- 13.5 Tilting Device
- 13.4 Furnace Body
- 13.3 Backing Ring
- 13.2 Trunnion Bearing Pedestal
- 13.1 General Requirements
- 13 Installation of Argon Oxygen Decarburization Refining Furnace(AOD)
- 12.8 Preheating Device for Vacuum Degassing Chamber
- 12.7 Ladle Lifting Device
- 12.6 Vacuum Device
- 12.5 Vacuum Degassing Chamber and Degassing Chamber Car
- 12.4 Track for Vacuum Degassing Chamber Car
- 12.3 Buggy Ladle
- 12.2 Track for Buggy Ladle
- 12.1 General Requirements
- 12 Installation of Recirculation Vacuum Degassing Refining Furnace(RH)
- 11.8 Oxygen Lance(Vacuum Oxygen Decarburization Converter(VOD))
- 11.7 Vacuum Device
- 11.6 Temperature Measuring and Sampling Device
- 11.5 Vacuum Tank Cap and Tank Cap Lifting Mechanism
- 11.4 Vacuum Tank Car
- 11.3 Track for Vacuum Tank Car
- 11.2 Vacuum Tank
- 11.1 General Requirements
- 11 Installation of Vacuum Ladle Refining Furnace(VD)and Vacuum Oxygen Decarburization Converter(VOD)
- 10.7 Temperature Measuring and Sampling Device
- 10.6 Argon Gas Stirrer
- 10.5 Electrode Lifting Mechanism and Electrode Clamping Mechanism
- 10.4 Furnace Cover and Furnace Cover Lifting Mechanism
- 10.3 Buggy Ladle
- 10.2 Track for Buggy Ladle
- 10.1 General Requirements
- 10 Installation of Ladle Refining Furnace(LF)
- 9.9 Oxygen Lance
- 9.8 Electrode Lifting Mechanism and Electrode Clamping Mechanism
- 9.7 Furnace Cover,Electrode Rotating Mechanism and Furnace Cover Lifting Mechanism
- 9.6 Furnace Body
- 9.5 Tilting Locking Device
- 9.4 Tilting Device
- 9.3 Cradle
- 9.2 Rail Chair
- 9.1 General Requirements
- 9 Installation of Electric Arc Furnace
- 8.6 Deoxidization Water Tank
- 8.5 Heat Accumulator
- 8.4 Piping for Steam and Water Systems
- 8.3 Boiler Barrel
- 8.2 Flue
- 8.1 General Requirements
- 8 Installation of Waste Heat Boiler(Vaporization Cooling Device)
- 7.3 Removable Hood
- 7.2 Skirt
- 7.1 General Requirements
- 7 Installation of Hood
- 6.6 Probe Mounting Machine and Pulling Machine
- 6.5 Nitrogen Sealing Device
- 6.4 Rotating Device
- 6.3 Cross travelling device
- 6.2 Oxygen Lance,Sublance and Lifting Device
- 6.1 General Requirements
- 6 Installation of Oxygen Lance and Sublance
- 5.6 Removable Guard Board and Fixed Guard Board
- 5.5 Tilting Device
- 5.4 Furnace Body
- 5.3 Backing Ring
- 5.2 Trunnion Bearing Pedestal
- 5.1 General Requirements
- 5 Installation of Converter
- 4.3 Raw Materials
- 4.2 Equipment
- 4.1 General Requirements
- 4 Equipment and Material Mobilization
- 3.4 Base Plate
- 3.3 Foundation Bolt
- 3.2 Equipment Foundation
- 3.1 General Requirements
- 3 Equipment Foundation,F(xiàn)oundation Bolt and Base Plate
- 2 Basic Requirements
- 1 General Provisions
- Foreword
- Announcement of Ministry of Construction of the People's Republic of China
- 版權(quán)頁
- 封面
- 封面
- 版權(quán)頁
- Announcement of Ministry of Construction of the People's Republic of China
- Foreword
- 1 General Provisions
- 2 Basic Requirements
- 3 Equipment Foundation,F(xiàn)oundation Bolt and Base Plate
- 3.1 General Requirements
- 3.2 Equipment Foundation
- 3.3 Foundation Bolt
- 3.4 Base Plate
- 4 Equipment and Material Mobilization
- 4.1 General Requirements
- 4.2 Equipment
- 4.3 Raw Materials
- 5 Installation of Converter
- 5.1 General Requirements
- 5.2 Trunnion Bearing Pedestal
- 5.3 Backing Ring
- 5.4 Furnace Body
- 5.5 Tilting Device
- 5.6 Removable Guard Board and Fixed Guard Board
- 6 Installation of Oxygen Lance and Sublance
- 6.1 General Requirements
- 6.2 Oxygen Lance,Sublance and Lifting Device
- 6.3 Cross travelling device
- 6.4 Rotating Device
- 6.5 Nitrogen Sealing Device
- 6.6 Probe Mounting Machine and Pulling Machine
- 7 Installation of Hood
- 7.1 General Requirements
- 7.2 Skirt
- 7.3 Removable Hood
- 8 Installation of Waste Heat Boiler(Vaporization Cooling Device)
- 8.1 General Requirements
- 8.2 Flue
- 8.3 Boiler Barrel
- 8.4 Piping for Steam and Water Systems
- 8.5 Heat Accumulator
- 8.6 Deoxidization Water Tank
- 9 Installation of Electric Arc Furnace
- 9.1 General Requirements
- 9.2 Rail Chair
- 9.3 Cradle
- 9.4 Tilting Device
- 9.5 Tilting Locking Device
- 9.6 Furnace Body
- 9.7 Furnace Cover,Electrode Rotating Mechanism and Furnace Cover Lifting Mechanism
- 9.8 Electrode Lifting Mechanism and Electrode Clamping Mechanism
- 9.9 Oxygen Lance
- 10 Installation of Ladle Refining Furnace(LF)
- 10.1 General Requirements
- 10.2 Track for Buggy Ladle
- 10.3 Buggy Ladle
- 10.4 Furnace Cover and Furnace Cover Lifting Mechanism
- 10.5 Electrode Lifting Mechanism and Electrode Clamping Mechanism
- 10.6 Argon Gas Stirrer
- 10.7 Temperature Measuring and Sampling Device
- 11 Installation of Vacuum Ladle Refining Furnace(VD)and Vacuum Oxygen Decarburization Converter(VOD)
- 11.1 General Requirements
- 11.2 Vacuum Tank
- 11.3 Track for Vacuum Tank Car
- 11.4 Vacuum Tank Car
- 11.5 Vacuum Tank Cap and Tank Cap Lifting Mechanism
- 11.6 Temperature Measuring and Sampling Device
- 11.7 Vacuum Device
- 11.8 Oxygen Lance(Vacuum Oxygen Decarburization Converter(VOD))
- 12 Installation of Recirculation Vacuum Degassing Refining Furnace(RH)
- 12.1 General Requirements
- 12.2 Track for Buggy Ladle
- 12.3 Buggy Ladle
- 12.4 Track for Vacuum Degassing Chamber Car
- 12.5 Vacuum Degassing Chamber and Degassing Chamber Car
- 12.6 Vacuum Device
- 12.7 Ladle Lifting Device
- 12.8 Preheating Device for Vacuum Degassing Chamber
- 13 Installation of Argon Oxygen Decarburization Refining Furnace(AOD)
- 13.1 General Requirements
- 13.2 Trunnion Bearing Pedestal
- 13.3 Backing Ring
- 13.4 Furnace Body
- 13.5 Tilting Device
- 13.6 Removable Guard Board and Fixed Guard Board
- 14 Installation of Casting Equipment
- 14.1 General Requirements
- 14.2 Ladle Turret
- 14.3 Tundish Car and Track
- 14.4 Roaster
- 15 Installation of Continuous Steel-casting Equipment
- 15.1 General Requirements
- 15.2 Mold and Vibrating Device
- 15.3 Secondary Cooling Device
- 15.4 Exchange Device for Segment
- 15.5 Withdrawal and Straightening Unit
- 15.6 Dummy Bar Receiving and Sending Device and Dummy Bar Disconnecting Device
- 15.7 Flame Cutting Machine
- 15.8 Rocking Shear
- 15.9 Crop Collecting Device
- 15.10 Burring Machine
- 16 Installation of Discharging and Finishing Equipment
- 16.1 General Requirements
- 16.2 Conveying Roller Table
- 16.3 Turntable
- 16.4 Pusher,Puller and Tilter
- 16.5 Scarfer
- 16.6 Lifting Guard Board and Marking Punch
- 16.7 Cross Travelling Trolley
- 16.8 Centering Device
- 17 Installation of Hot Metal Mixer
- 17.1 General Requirements
- 17.2 Base and Race
- 17.3 Furnace Shell and Tension Sleeve
- 17.4 Tilting Device
- 17.5 Cover Manipulating Winch
- 18 Installation of Hot Metal Pretreatment Equipment
- 18.1 General Requirements
- 18.2 Desulfurizer(Dephosphorizer)Conveying Device
- 18.3 Stirring Desulfurization Equipment
- 18.4 Dephosphorization Spray Gun
- 18.5 Molten Iron Tank Car
- 18.6 Track for Molten Iron Tank Car
- 18.7 Slag remover
- 19 Installation of Raw Material System
- 19.1 General Requirements
- 19.2 Weighing Funnel
- 19.3 Collecting Funnel and Rotating Funnel
- 20 Installation of Gas Purification Device
- 20.1 General Requirements
- 20.2 Gas Purification Device
- 21 Test Run of Steel-making Mechanical Equipment
- 21.1 General Requirements
- 21.2 Test Run of Converter
- 21.3 Test Run of Oxygen Lance and Sublance
- 21.4 Test Run of Hood
- 21.5 Test Run of Waste Heat Boiler System
- 21.6 Test Run of Electric Arc Furnace
- 21.7 Test Run of Ladle Refining Furnace(LF)
- 21.8 Test Run of Vacuum Ladle Refining Furnace(VD)and Vacuum Oxygen Decarburization Converter(VOD)
- 21.9 Test Run of Recirculation Vacuum Degassing Refining Furnace(RH)
- 21.10 Test Run of Argon Oxygen Decarburization Refining Furnace(AOD)
- 21.11 Test Run of Casting equipment
- 21.12 Test Run of Continuous Steel-casting Equipment
- 21.13 Test Run of Discharging and Finishing Equipment
- 21.14 Test Run of Hot Metal Mixer
- 21.15 Test Run of Hot Metal Pretreatment Equipment
- Appendix A Record of Quality Acceptance for Subdivisional Works of Installation of Steel-making Mechanical Equipment
- Appendix B Record of Quality Acceptance for Sub-unit Works of Installation of Steel-making Mechanical Equipment
- Appendix C Record of Quality Acceptance for Unit Works of Installation of Steel-making Mechanical Equipment
- Appendix D Record of No-load Test Run of Steel-making Mechanical Equipment
- Appendix E Criteria for Appearance Quality of Weld
- Appendix F Postweld Heat Treatment of Welded Joint
- Explanation of Wording in This Code
- Explanation of Provisions
- 1 General Provisions
- 2 Basic Requirements
- 3 Equipment Foundation,F(xiàn)oundation Bolt and Base Plate
- 3.1 General Requirements
- 3.2 Equipment Foundation
- 3.3 Foundation Bolt
- 4 Equipment and Material Mobilization
- 4.1 General Requirements
- 4.2 Equipment
- 4.3 Raw Materials
- 5 Installation of Converter
- 5.1 General Requirements
- 5.3 Backing Ring
- 5.4 Furnace Body
- 6 Installation of Oxygen Lance and Sublance
- 6.2 Oxygen Lance,Sublance and Lifting Device
- 8 Installation of Waste Heat Boiler(Vaporization Cooling Device)
- 8.1 General Requirements
- 8.2 Flue
- 8.3 Boiler Barrel
- 9 Installation of Electric Arc Furnace
- 9.2 Rail Chair
- 9.3 Cradle
- 9.5 Tilting Locking Device
- 9.6 Furnace Body
- 9.7 Furnace Cover,Electrode Rotating Mechanism and Furnace Cover Lifting Mechanism
- 10 Installation of Ladle Refining Furnace(LF)
- 10.3 Buggy Ladle
- 11 Installation of Vacuum Ladle Refining Furnace(VD)and Vacuum Oxygen Decarburization Converter(VOD)
- 11.1 General Requirements
- 11.2 Vacuum Tank
- 11.7 Vacuum Device
- 13 Installation of Argon Oxygen Decarburization Refining Furnace(AOD)
- 13.1 General Requirements
- 14 Installation of Casting equipment
- 14.2 Ladle Turret
- 14.3 Tundish Car and Track
- 15 Installation of Continuous Steel-casting Equipment
- 15.2 Mold and Vibrating Device
- 15.3 Secondary Cooling Device
- 15.4 Exchange Device for Segment
- 15.5 Withdrawal and Straightening Unit
- 15.6 Dummy Bar Receiving and Sending Device and Dummy Bar Disconnecting Device
- 15.7 Flame Cutting Machine
- 15.10 Burring Machine
- 16 Installation of Discharging and Finishing Equipment
- 16.2 Conveying Roller Table
- 16.7 Cross Travelling Trolley
- 16.8 Centering Device
- 17 Installation of Hot Metal Mixer
- 17.2 Base and Race
- 17.3 Furnace Shell and Tension Sleeve
- 18 Installation of Hot Metal Pretreatment Equipment
- 18.3 Stirring Desulfurization Equipment
- 18.7 Slag Remover
- 21 Test Run of Steel-making Mechanical Equipment
- 21.1 General Requirements 更新時間:2020-09-24 18:26:05