舉報

會員
GB 50603-2010 鋼鐵企業總圖運輸設計規范(英文版)
本規范共16章和4個附錄,主要內容包括總則,術語,廠址選擇,總體布置,總平面布置,豎向布置,管線綜合布置,綠化,運輸方式選擇,礦山鐵路運輸,鋼鐵廠準軌鐵路運輸,礦山道路運輸,鋼鐵廠道路運輸,水路運輸,其他運輸,排土場等。
最新章節
- A.2 Construction Clearance
- A.1 Limit of Rolling Stock
- Appendix A Limit of Railways with Standard Gauge
- 16.4 Safety of Dumping Site
- 16.3 Dumping Plan
- 16.2 Dumping Mode and Design Essence
品牌:中國計劃出版社有限公司
上架時間:2020-09-24 18:05:02
出版社:中國計劃出版社
本書數字版權由中國計劃出版社有限公司提供,并由其授權上海閱文信息技術有限公司制作發行
- A.2 Construction Clearance 更新時間:2020-09-24 18:08:07
- A.1 Limit of Rolling Stock
- Appendix A Limit of Railways with Standard Gauge
- 16.4 Safety of Dumping Site
- 16.3 Dumping Plan
- 16.2 Dumping Mode and Design Essence
- 16.1 General Requirements
- 16 Dumping Site
- 15.7 Chain Conveyor and Roller Table Transportation
- 15.6 Hydro Transport by Pipe and Channel
- 15.5 Chutes and Gravity Shaft Transportation
- 15.4 Winch Transportation
- 15.3 Belt Conveyor Transportation
- 15.2 Cableway Transport
- 15.1 General Requirements
- 15 Other Transportation
- 14 Waterway Transportation
- 13.6 Road Maintenance Equipment
- 13.5 Road Transportation Equipment
- 13.4 Road Type and Pavement Selection
- 13.3 Technical Standard of Road
- 13.2 Traffic Flow Organization
- 13.1 General Requirements
- 13 Road Transportation of Iron and Steel Plant
- 12.5 Road Maintenance and Auxiliary Transportation Equipment
- 12.4 Selection of Transportation Equipment
- 12.3 Pavement Design
- 12.2 Technical Standard of Road
- 12.1 General Requirements
- 12 Mine Road Transportation
- 11.10 Transportation Equipment and Auxiliary Facilities
- 11.9 Track
- 11.8 Subgrade and Water Drainage
- 11.7 Technical Standards of Railway Lines
- 11.6 Effective Length and Pitch of Railway Line
- 11.5 Configuration of Transportation System and Station
- 11.4 Track Joint and Intercross
- 11.3 Communication,Signal and Lighting
- 11.2 Transportation Organization
- 11.1 General Requirements
- 11 Transportation by Standard-gauge Railway in Iron and Steel Plant
- 10.5 Determination of Transportation Capacity
- 10.4 Selection and Configuration of Transportation Equipment
- 10.3 Main Technical Standard of Railway Line
- 10.2 Transportation Organization and Signal
- 10.1 General Requirements
- 10 Railway Transportation of Mine
- 9.3 Selection of Transportation Modes for Iron and Steel Plant
- 9.2 Selection of Transportation Modes for Mine
- 9.1 General Requirements
- 9 Selection of Transportation Mode
- 8.2 Vegetation Arrangement
- 8.1 General Requirements
- 8 Vegetation
- 7.3 Pipeline above Ground
- 7.2 Underground Pipeline
- 7.1 General Requirements
- 7 Integrated Arrangement of Pipeline
- 6.5 Water Drainage of Site
- 6.4 Earthwork
- 6.3 Step Type Arrangement
- 6.2 Determination of Design Elevation
- 6.1 General Requirements
- 6 Vertical Arrangement
- 5.19 Entrance,Exit and Enclosure Wall of Plant Area
- 5.18 Production Management and Living Facilities
- 5.17 Fire Station
- 5.16 Storage and Yard
- 5.15 Transportation Facilities
- 5.14 Water Supply and Drainage Facilities
- 5.13 Power Facilities
- 5.12 Repairing Facilities
- 5.11 Ferrous Alloy Shop(Plant)
- 5.10 Rolling Area
- 5.9 Steelmaking Area
- 5.8 Ironmaking Area
- 5.7 Lime Shop
- 5.6 Refractory Shop
- 5.5 Coking Area
- 5.4 Sintering(Pelletizing)Area
- 5.3 Industrial Yard for Ore Dressing
- 5.2 Mining Industrial Yard
- 5.1 General Requirements
- 5 General Layout
- 4.9 Residential District
- 4.8 Water and Electricity Facility
- 4.7 Slag Yard and Industrial Waste Yard
- 4.6 Blasting Gear storage and Plant
- 4.5 Dumping Site and Waste Ore Reservoir
- 4.4 Mineral Industrial Yard
- 4.3 Traffic and Transportation
- 4.2 Sanitary Protective Zone and Safety Distance
- 4.1 General Requirements
- 4 General Plan
- 3 Selection of Plant Location
- 1 General Provisions
- Compilation Explanations
- Explanation of Provisions
- List of Quoted Standards
- Explanation of Wording in This Code
- Appendix D Transportation(Turnover)Table of Freight Traffic
- C.6 Calculation of Truck Quantity in Iron and Steel Plant
- C.5 Calculation Related to Road Transportation in Mines
- C.4 Calculation of Quantity of Locomotives and Ordinary Wagons in Iron and Steel Plants
- C.3 Calculation of Track Quantity at Stations and Yards
- C.1 Calculation of Techno-economic Indices
- Appendix C Pertinent Calculation Method
- Appendix B Limit of Buildings for Roads
- A.2 Construction Clearance
- A.1 Limit of Rolling Stocks
- Appendix A Limit of Railways with Standard Gauge
- 16.4 Safety of Dumping Site
- 16.3 Dumping Plan
- 16.2 Dumping Mode and Design Essence
- 16.1 General Requirements
- 16 Dumping Site
- 15.7 Chain Conveyor and Roller Table Transportation
- 15.6 Hydro Transport by Pipe and Channel
- 15.5 Chute and Gravity shaft Transportation
- 15.4 Winch Transportation
- 15.3 Belt Conveyor Transportation
- 15.2 Cableway Transport
- 15.1 General Requirements
- 15 Other Transportation
- 14 Waterway Transportation
- 13.6 Road Maintenance Equipment
- 13.5 Road Transportation Equipment
- 13.4 Road Type and Pavement Selection
- 13.3 Technical Standard of Road
- 13.2 Traffic Flow Organization
- 13.1 General Requirements
- 13 Road Transportation of Iron and Steel Plant
- 12.5 Road Maintenance and Auxiliary Transportation Equipment
- 12.4 Selection of Transportation Equipment
- 12.3 Pavement Design
- 12.2 Technical Standard of Road
- 12.1 General Requirements
- 12 Mine Road Transportation
- 11.10 Transportation Equipment and Auxiliary Facilities
- 11.9 Track
- 11.8 Subgrade and Water Drainage
- 11.7 Technical Standards of Railway Lines
- 11.6 Effective Length and Pitch of Railway Line
- 11.5 Configuration of Transportation System and Station
- 11.4 Track Joint and Intercross
- 11.3 Communication,Signal and Lighting
- 11.2 Transportation Organization
- 11.1 General Requirements
- 11 Transportation by Standard-gauge Railway in Iron and Steel Plant
- 10.5 Determination of Transportation Capacity
- 10.4 Selection and Configuration of Transportation Equipment
- 10.3 Main Technical Standard of Railway Line
- 10.2 Transportation Organization and Signal
- 10.1 General Requirements
- 10 Railway Transportation of Mine
- 9.3 Selection of Transportation Mode for Iron and Steel Plant
- 9.2 Selection of Transportation Mode for Mine
- 9.1 General Requirements
- 9 Selection of Transportation Mode
- 8.2 Vegetation Arrangement
- 8.1 General Requirements
- 8 Vegetation
- 7.3 Pipeline above Ground
- 7.2 Underground Pipeline
- 7.1 General Requirements
- 7 Integrated Arrangement of Pipeline
- 6.5 Water Drainage of Site
- 6.4 Earthwork
- 6.3 Step Type Arrangement
- 6.2 Determination of Design Elevation
- 6.1 General Requirements
- 6 Vertical Arrangement
- 5.19 Entrance,Exit and Enclosure Wall of Plant Area
- 5.18 Production Management and Living Facilities
- 5.17 Fire Station
- 5.16 Storage and Yard
- 5.15 Transporation Facilities
- 5.14 Water Supply and Drainage Facilities
- 5.13 Power Facilities
- 5.12 Repairing Facilities
- 5.11 Ferrous Alloy Shop(Plant)
- 5.10 Rolling Area
- 5.9 Steelmaking Area
- 5.8 Ironmaking Area
- 5.7 Lime Shop
- 5.6 Refractory Shop
- 5.5 Coking Area
- 5.4 Sintering(Pelletizing)Area
- 5.3 Industrial Yard for Ore Dressing
- 5.2 Mining Industrial Yard
- 5.1 General Requirements
- 5 General Layout
- 4.9 Residential District
- 4.8 Water and Electricity Facility
- 4.7 Slag Yard and Industrial Waste Yard
- 4.6 Blasting Gear Storage and Plant
- 4.5 Dumping Site and Waste Ore Reservoir
- 4.4 Mineral Industrial Yard
- 4.3 Traffic and Transportation
- 4.2 Sanitary Protective Zone and Safety Distance
- 4.1 General Requirements
- 4 General Plan
- 3 Selection of Plant Location
- 2 Terms
- 1 General Provisions
- Foreward
- Announcement of Ministry of Housing and Urban-Rural Development of the People's Republic of China
- 版權頁
- 封面
- 封面
- 版權頁
- Announcement of Ministry of Housing and Urban-Rural Development of the People's Republic of China
- Foreward
- 1 General Provisions
- 2 Terms
- 3 Selection of Plant Location
- 4 General Plan
- 4.1 General Requirements
- 4.2 Sanitary Protective Zone and Safety Distance
- 4.3 Traffic and Transportation
- 4.4 Mineral Industrial Yard
- 4.5 Dumping Site and Waste Ore Reservoir
- 4.6 Blasting Gear Storage and Plant
- 4.7 Slag Yard and Industrial Waste Yard
- 4.8 Water and Electricity Facility
- 4.9 Residential District
- 5 General Layout
- 5.1 General Requirements
- 5.2 Mining Industrial Yard
- 5.3 Industrial Yard for Ore Dressing
- 5.4 Sintering(Pelletizing)Area
- 5.5 Coking Area
- 5.6 Refractory Shop
- 5.7 Lime Shop
- 5.8 Ironmaking Area
- 5.9 Steelmaking Area
- 5.10 Rolling Area
- 5.11 Ferrous Alloy Shop(Plant)
- 5.12 Repairing Facilities
- 5.13 Power Facilities
- 5.14 Water Supply and Drainage Facilities
- 5.15 Transporation Facilities
- 5.16 Storage and Yard
- 5.17 Fire Station
- 5.18 Production Management and Living Facilities
- 5.19 Entrance,Exit and Enclosure Wall of Plant Area
- 6 Vertical Arrangement
- 6.1 General Requirements
- 6.2 Determination of Design Elevation
- 6.3 Step Type Arrangement
- 6.4 Earthwork
- 6.5 Water Drainage of Site
- 7 Integrated Arrangement of Pipeline
- 7.1 General Requirements
- 7.2 Underground Pipeline
- 7.3 Pipeline above Ground
- 8 Vegetation
- 8.1 General Requirements
- 8.2 Vegetation Arrangement
- 9 Selection of Transportation Mode
- 9.1 General Requirements
- 9.2 Selection of Transportation Mode for Mine
- 9.3 Selection of Transportation Mode for Iron and Steel Plant
- 10 Railway Transportation of Mine
- 10.1 General Requirements
- 10.2 Transportation Organization and Signal
- 10.3 Main Technical Standard of Railway Line
- 10.4 Selection and Configuration of Transportation Equipment
- 10.5 Determination of Transportation Capacity
- 11 Transportation by Standard-gauge Railway in Iron and Steel Plant
- 11.1 General Requirements
- 11.2 Transportation Organization
- 11.3 Communication,Signal and Lighting
- 11.4 Track Joint and Intercross
- 11.5 Configuration of Transportation System and Station
- 11.6 Effective Length and Pitch of Railway Line
- 11.7 Technical Standards of Railway Lines
- 11.8 Subgrade and Water Drainage
- 11.9 Track
- 11.10 Transportation Equipment and Auxiliary Facilities
- 12 Mine Road Transportation
- 12.1 General Requirements
- 12.2 Technical Standard of Road
- 12.3 Pavement Design
- 12.4 Selection of Transportation Equipment
- 12.5 Road Maintenance and Auxiliary Transportation Equipment
- 13 Road Transportation of Iron and Steel Plant
- 13.1 General Requirements
- 13.2 Traffic Flow Organization
- 13.3 Technical Standard of Road
- 13.4 Road Type and Pavement Selection
- 13.5 Road Transportation Equipment
- 13.6 Road Maintenance Equipment
- 14 Waterway Transportation
- 15 Other Transportation
- 15.1 General Requirements
- 15.2 Cableway Transport
- 15.3 Belt Conveyor Transportation
- 15.4 Winch Transportation
- 15.5 Chute and Gravity shaft Transportation
- 15.6 Hydro Transport by Pipe and Channel
- 15.7 Chain Conveyor and Roller Table Transportation
- 16 Dumping Site
- 16.1 General Requirements
- 16.2 Dumping Mode and Design Essence
- 16.3 Dumping Plan
- 16.4 Safety of Dumping Site
- Appendix A Limit of Railways with Standard Gauge
- A.1 Limit of Rolling Stocks
- A.2 Construction Clearance
- Appendix B Limit of Buildings for Roads
- Appendix C Pertinent Calculation Method
- C.1 Calculation of Techno-economic Indices
- C.3 Calculation of Track Quantity at Stations and Yards
- C.4 Calculation of Quantity of Locomotives and Ordinary Wagons in Iron and Steel Plants
- C.5 Calculation Related to Road Transportation in Mines
- C.6 Calculation of Truck Quantity in Iron and Steel Plant
- Appendix D Transportation(Turnover)Table of Freight Traffic
- Explanation of Wording in This Code
- List of Quoted Standards
- Explanation of Provisions
- Compilation Explanations
- 1 General Provisions
- 3 Selection of Plant Location
- 4 General Plan
- 4.1 General Requirements
- 4.2 Sanitary Protective Zone and Safety Distance
- 4.3 Traffic and Transportation
- 4.4 Mineral Industrial Yard
- 4.5 Dumping Site and Waste Ore Reservoir
- 4.6 Blasting Gear storage and Plant
- 4.7 Slag Yard and Industrial Waste Yard
- 4.8 Water and Electricity Facility
- 4.9 Residential District
- 5 General Layout
- 5.1 General Requirements
- 5.2 Mining Industrial Yard
- 5.3 Industrial Yard for Ore Dressing
- 5.4 Sintering(Pelletizing)Area
- 5.5 Coking Area
- 5.6 Refractory Shop
- 5.7 Lime Shop
- 5.8 Ironmaking Area
- 5.9 Steelmaking Area
- 5.10 Rolling Area
- 5.11 Ferrous Alloy Shop(Plant)
- 5.12 Repairing Facilities
- 5.13 Power Facilities
- 5.14 Water Supply and Drainage Facilities
- 5.15 Transportation Facilities
- 5.16 Storage and Yard
- 5.17 Fire Station
- 5.18 Production Management and Living Facilities
- 5.19 Entrance,Exit and Enclosure Wall of Plant Area
- 6 Vertical Arrangement
- 6.1 General Requirements
- 6.2 Determination of Design Elevation
- 6.3 Step Type Arrangement
- 6.4 Earthwork
- 6.5 Water Drainage of Site
- 7 Integrated Arrangement of Pipeline
- 7.1 General Requirements
- 7.2 Underground Pipeline
- 7.3 Pipeline above Ground
- 8 Vegetation
- 8.1 General Requirements
- 8.2 Vegetation Arrangement
- 9 Selection of Transportation Mode
- 9.1 General Requirements
- 9.2 Selection of Transportation Modes for Mine
- 9.3 Selection of Transportation Modes for Iron and Steel Plant
- 10 Railway Transportation of Mine
- 10.1 General Requirements
- 10.2 Transportation Organization and Signal
- 10.3 Main Technical Standard of Railway Line
- 10.4 Selection and Configuration of Transportation Equipment
- 10.5 Determination of Transportation Capacity
- 11 Transportation by Standard-gauge Railway in Iron and Steel Plant
- 11.1 General Requirements
- 11.2 Transportation Organization
- 11.3 Communication,Signal and Lighting
- 11.4 Track Joint and Intercross
- 11.5 Configuration of Transportation System and Station
- 11.6 Effective Length and Pitch of Railway Line
- 11.7 Technical Standards of Railway Lines
- 11.8 Subgrade and Water Drainage
- 11.9 Track
- 11.10 Transportation Equipment and Auxiliary Facilities
- 12 Mine Road Transportation
- 12.1 General Requirements
- 12.2 Technical Standard of Road
- 12.3 Pavement Design
- 12.4 Selection of Transportation Equipment
- 12.5 Road Maintenance and Auxiliary Transportation Equipment
- 13 Road Transportation of Iron and Steel Plant
- 13.1 General Requirements
- 13.2 Traffic Flow Organization
- 13.3 Technical Standard of Road
- 13.4 Road Type and Pavement Selection
- 13.5 Road Transportation Equipment
- 13.6 Road Maintenance Equipment
- 14 Waterway Transportation
- 15 Other Transportation
- 15.1 General Requirements
- 15.2 Cableway Transport
- 15.3 Belt Conveyor Transportation
- 15.4 Winch Transportation
- 15.5 Chutes and Gravity Shaft Transportation
- 15.6 Hydro Transport by Pipe and Channel
- 15.7 Chain Conveyor and Roller Table Transportation
- 16 Dumping Site
- 16.1 General Requirements
- 16.2 Dumping Mode and Design Essence
- 16.3 Dumping Plan
- 16.4 Safety of Dumping Site
- Appendix A Limit of Railways with Standard Gauge
- A.1 Limit of Rolling Stock
- A.2 Construction Clearance 更新時間:2020-09-24 18:08:07