5.2 Optical Cable Route Selection
5.2.1 The lines should go from the bridge,when the optical cable routing goes across the river and a permanent solid bridge may be available for laying the lines nearby.Suitable places shall be chosen to deploy underwater cables whilst considering the main routing direction,to ensure the routing will not deviate too far.However,for complex and broad rivers or large rivers with busy shipping business,top priority shall be ensuring safety of the underwater routes,and partial deviation can be an option.
5.2.2 To ensure security as top priority,directional drilling or aerial laying methods may be used to lay optical cable lines across the river.
5.2.3 When optical cable lines come across a reservoir,optical cable lines shall go through the upstream of the reservoir and the laying height along the reservoir shall exceed the highest water storage level.
- 中文版Rhino 5.0完全自學教程(培訓教材版)
- GB/T 51257-2017 液化天然氣低溫管道設計規范
- SH3011-2011石油化工工藝裝置布置設計規范(英文版)
- GB50377-2006選礦機械設備工程安裝驗收規范(英文版)
- DL/T5161.7-2002電氣裝置安裝工程質量檢驗及評定規程第7部分:旋轉電機施工質量檢驗(英文版)
- 核電站鋼板混凝土結構技術標準
- GB 51133-2015 醫藥工業環境保護設計規范
- GB50071-2014小型水力發電站設計規范(英文版)
- GB/T 51218-2017 機械工業工程設計基本術語標準
- GB/T 51248-2017 天然氣凈化廠設計規范
- 工程建設標準體系(農業工程部分)
- GB50473-2008鋼制儲罐地基基礎設計規范(英文版)
- DL/T 5501-2015 凍土地區架空輸電線路基礎設計技術規程
- GB50397-2007冶金電氣設備工程安裝驗收規范(英文版)
- GB 50390-2017 焦化機械設備安裝驗收規范