- GB 51158-2015 通信線路工程設計規(guī)范(英文版)
- 中華人民共和國住房和城鄉(xiāng)建設部
- 354字
- 2021-05-28 16:39:18
4.3 Copper Cable Selection
4.3.1 The cable structure may be in accordance with Table 4.3.1,and shall be selected in consideration of engineering conditions and application scenarios.
1 Insulation layer type shall be adopted according to the user requirements.
2 Aluminum and plastic composite sheath shall be adopted when all plastic cables are used.
3 Fire retardant cables shall be adopted when laying indoor terminal cables and distribution cables.
4 The diameter of duct cables shall be suitable for installation in the duct.
5 The working environment temperature of all plastic cables shall be between-30℃to+60℃whilst special need shall be considered per actual working environment when temperature goes beyond the specified range.
Table 4.3.1 Usage scenarios for main cable types

4.3.2 The types of the cables in engineering design should not be too many.
4.3.3 Considering with the existing cable network conditions and the actual local situations,all plastic cables should be selected for new cable lines whilst the inflatable type shall be applied to duct primary cables,filling type may be applied to buried and distribution duct cables,and self-supporting type shall be applied to aerial and wall-mount cables.
4.3.4 Aerial cables should not exceed 400 pairs.Multi-core cables with over 400 pairs and important or special cables shall adopt the underground laying method.
4.3.5 The underground laying method may use the plastic outer sheath cables laid in ducts,with one cable in each duct.When the capacity of the only cable needed is less than 400 pairs and conditions are not suitable for building ducts,the buried method can be adopted.The use of culvert or the method of adding protective pipes may also be adopted according to actual circumstances.
4.3.6 According to specific project situations,distribution cables may adopt the block,street,or indoor distribution method,and shall be gradually incorporated into the Customer Premises Network construction and the overall urban planning scheme.Distribution cables should adopt the duct laying method.
4.3.7 Non-filled primary cables shall adopt inflating maintenance and install pressure monitoring system.Pressure sensors shall be installed in the cable sleeves.
- GB50950-2013光纜廠生產設備安裝工程施工及質量驗收規(guī)范(英文版)
- GB50526-2010公共廣播系統(tǒng)工程技術規(guī)范(英文版)
- GB 51289-2018 煤炭工業(yè)露天礦邊坡工程設計標準
- GB 51120-2015 通信局(站)防雷與接地工程驗收規(guī)范(英文版)
- GB/T 50943-2015 海岸軟土地基堤壩工程技術規(guī)范
- DL/T5161.6-2002電氣裝置安裝工程質量檢驗及評定規(guī)程第6部分:接地裝置施工質量檢驗(英文版)
- 建標 152-2017 城市消防站建設標準
- GB50580-2010連鑄工程設計規(guī)范(英文版)
- 濕陷性土起始壓力測試規(guī)程
- 冶金石灰焙燒工程設計標準
- DL/T 866-2015 電流互感器和電壓互感器選擇及計算規(guī)程
- DL 5068-2014 發(fā)電廠化學設計規(guī)范
- DL/T5210.4-2009電力建設施工質量驗收及評價規(guī)程第4部分:熱工儀表及控制裝置(英文版)
- GB/T 50619-2010(英文版)火力發(fā)電廠海水淡化工程設計規(guī)范
- 建材工程術語標準