官术网_书友最值得收藏!

6 Main Building

6.1 General Requirements

6.1.1 The internal layout of main building shall be safe running and convenient operation,and patrol inspection channels shall be smooth.The ventilation,lighting,illumination and noise control and others of the main building shall meet the relevant requirements of the current national standards Design code for heating ventilation and air conditioning of industrial buildings GB 50019,Standard for daylighting design of buildings GB 50033,Standard for lighting design of buildings GB 50034 and Code for design of noise control of industrial enterprises GB/T 50087.

6.1.2 The main building shall be equipped with overhaul lifting facilities,overhaul site,and shall be set transport channel for overhaul of equipment and components.

6.1.3 The internal layout of workshop shall be determined by the professional design layout requirements for thermal-mechanical,electrical,civil,water,thermal control,heating and ventilation etc.,and the extension conditions.The reserved expanded workshop should be coordinated with the original workshop.

主站蜘蛛池模板: 陇西县| 白水县| 玉屏| 建始县| 澄江县| 蒙城县| 宁阳县| 应城市| 山丹县| 葵青区| 随州市| 建水县| 永川市| 满城县| 永吉县| 通海县| 高青县| 德安县| 布尔津县| 察雅县| 隆化县| 宕昌县| 古田县| 彰化市| 安庆市| 酉阳| 巍山| 临邑县| 庆城县| 阜平县| 奈曼旗| 治县。| 阳朔县| 阜康市| 大洼县| 巩留县| 钟祥市| 开化县| 深水埗区| 微山县| 胶州市|