4.2 Thermodynamic System and Installation Scheme

4.2.1 The thermodynamic system shall be determined by the temperature and quantity of waste gas,and shall maximize the utilization ratio of waste heat.

4.2.2 Steam parameters of waste heat boiler shall be determined by the waste gas temperature and air flow volume,and parameters of thermodynamic system shall be determined by the factors,such as waste heat condition,turbine internal efficiency,etc..

4.2.3 One steam turbine unit may be used when utilizing waste heat of 2 cement production lines in the same plant.When the steam produced by the waste heat boiler of cement kiln with lower production is less than 30%of rated feed steam of the unit,2 steam turbine units should be used.2 or more steam turbine units should be used when utilizing waste heat of 3 or more cement production lines in the same plant.

主站蜘蛛池模板: 建平县| 龙川县| 介休市| 金昌市| 威宁| 洛宁县| 湖南省| 沾益县| 大英县| 安龙县| 广东省| 姚安县| 滕州市| 顺平县| 和平区| 家居| 普定县| 华池县| 九龙坡区| 卫辉市| 阿克苏市| 竹山县| 沅江市| 包头市| 青神县| 托里县| 兴国县| 恩施市| 疏附县| 东至县| 辉县市| 和政县| 沭阳县| 红河县| 平定县| 长垣县| 丹巴县| 志丹县| 娱乐| 德化县| 铜梁县|