Chapter 3. So Much to Manage
With all this information and critical decisions being made based on this information, there must be an organized way to store and manage it. It is not as simple as placing all the documents into a folder structure on the F:\
drive. There are many different types of documents that require different responses, security, and accountability. You can't treat a simple bulletin as you would a change order or contract. The change order has monetary and legal ramifications. If for some reason it slipped through the cracks it would potentially have much more impact against the project than a bulletin. When information comes into a project, the type of document must be determined to follow the proper workflow for storage and action. There is a set list of modules within PCM, which can be configured for the organization to hold and manage the various documents.
- Microsoft Dynamics GP 2016 Cookbook
- Mastering Microsoft Forefront UAG 2010 Customization
- 審計綜合模擬實訓
- 企業能源審計與節能規劃
- 基本有用的計量經濟學
- 陜西國家統計調查專題研究集萃(2006—2015)
- Getting Started with Citrix VDI-in-a-Box
- 成功通過PMP(第3版)
- 風險導向審計準則實施效果研究
- 下一場全球金融危機的到來:明斯基與金融不穩定
- Windows Server 2016 Administration Fundamentals
- 舞弊審計實務指南
- 政府審計基本理論探索
- 合規型內部審計:精準發現違規行為,實時化解合規風險
- Learn Odoo