Using a hierarchical structure
Computerized systems allow us to easily incorporate a hierarchical structure in our projects as well as information within these projects. PCM allows for multiple hierarchies that can be easily switched. Hierarchical structures allow us to organize our projects at different levels. They also allow us to provide roll-up reporting at the various levels. Look at the following hierarchical structure:

You can see that security would be important at the various levels of the structure. You would not want users who have access to the Private Sector Projects to have the same access to the Federal defense projects. Security is assigned at the project level, but the hierarchical structure can give us a visual look at the different levels. When PCM is used in conjunction with Oracle's Primavera Project Management tool (P6), it is good practice to match the hierarchical structure within PCM to that of P6 and the Enterprise Project Structure (EPS).
You can also see that roll-up reporting is very helpful. Every hierarchical node in the structure can provide a roll-up report of all projects at and below that node where the user has permissions. So you can run a report of all projects at NASA as well as a report of all federal projects.
PCM allows for up to ten different hierarchical structures so you can slice and dice your projects and organize them in many different ways. An idea of a structure would be as follows:
- Project type
- Region or location
- Project manager (personnel)
- Local office
Each of these types can be broken down into unlimited subgroups within the hierarchy. Changing views is as simple as selecting the view from the drop-down list at the top of the tree. All your projects will be rearranged and organized by a different structure. A project is assigned to a node (or nodes) on the tree. A project can be assigned to multiple nodes so roll-up reporting at each node can have the proper information. Determining where the project fits in your hierarchical structure is key to a good implementation. Some information has project-level ramifications while others have database or group-level ramifications. This helps determine where your project fits. "What defines a project for my organization?" The answer to this question is determined by several factors. The following are a few factors to consider::
- How will the costs be rolled up?
- How will the funding sources be managed (one or multiple)?
- How will the documents be managed?
- How will the contracts and POs be managed?
Understanding the hierarchy of your organization and where the project fits in that hierarchy allows for better understanding of document flow and roll up of information. More on this in Chapter 6, The Big Picture.
- 中國國民經(jīng)濟(jì)核算體系修訂問題研究
- 自愿審計(jì)動(dòng)機(jī)與質(zhì)量研究:基于我國中期財(cái)務(wù)報(bào)告審計(jì)的經(jīng)驗(yàn)證據(jù)
- 讓財(cái)報(bào)說話:世界500強(qiáng)CFO帶你輕松讀財(cái)報(bào)(鮮讀版)
- Learning Informatica PowerCenter 9.x
- 項(xiàng)目管理(第二版)
- 陜西文物年鑒·2015
- Microsoft System Center Data Protection Manager 2012 SP1
- VMware vCenter Operations Manager Essentials
- Getting Started with Microsoft Lync Server 2013
- 中國審計(jì)市場(chǎng):制度變遷與競(jìng)爭行為
- PMP備考寶典:路晨帶你去通關(guān)
- Big Data Analytics with R and Hadoop
- 中國國內(nèi)生產(chǎn)總值核算問題研究
- 審計(jì)實(shí)務(wù)
- 2014年注冊(cè)會(huì)計(jì)師(CPA)全國統(tǒng)考專用輔導(dǎo)教材系列:審計(jì)(名師解讀版)