Oracle BPM Suite 12c tackles Game Enterprise BPM
With BPM Suite 12c, Oracle is starting to engage in this domain. The approach Oracle took can be summarized as applying the Pareto principle: 80 percent of the needed features for strategic enterprise modeling can be found in just 20 percent of the functionality of those high-end, enterprise-level modeling tools. So, Oracle implemented these 20 percent of business architecture models:
- Enterprise maps to define the organizational and application context
- Value chains to establish a root for process hierarchies
- The strategy model to depict focus areas and assign technical capabilities and optimization strategies
The following figure represents the new features in Oracle BPM Suite 12c in the context of the Game Enterprise BPM methodology:

Figure 4: Oracle BPM Suite 12c new features in the context of the Game Enterprise BPM methodology
Note
The preceding figure is based on the BPTrends Process Change Methodology introduced in the Business Process Change book by Paul Harmon.
These new features promise to create a link from higher-level process models and other strategic depictions into executable processes. This link could not be established until now since there are too many interface mismatches between enterprise tooling and workflow automation engines.
The new model types in Oracle BPM Suite 12c are, as discussed, a subset of all the features and model types in the EA tools. For this subset, these interface mismatches have been made obsolete: there is a clear trace with no tool disruption from the enterprise map to the value chain and associated KPIs down to the BPMN process that are automated. These features have been there in the EA and BPM tools before. What is new is this undisrupted trace.

Figure 5: Undisrupted trace from the business architecture to executable processes
Note
The preceding figure is based on the BPTrends Process Change Methodology introduced in the Business Process Change book by Paul Harmon.
This holistic set of tools that brings together aspects from modeling time, design time, and runtime makes it more likely to succeed in finally bridging the business/IT gap.

Figure 6: Tighter links from business and strategy to executable software and processes
Today, we do not live in a perfect world. To understand to which extent this gap is closed, it helps to look at how people work. If there is a tool to depict enterprise strategy, end-to-end business processes, business capabilities, and KPIs that are used in daily work and that have the means to navigate to lower-level models, then we have come quite far. The features of Oracle BPM Suite 12c, which are discussed below, are a step in this direction but are not the end of the journey.
- 多媒體CAI課件設計與制作導論(第二版)
- Web開發的貴族:ASP.NET 3.5+SQL Server 2008
- Getting Started with PowerShell
- 深入淺出Windows API程序設計:編程基礎篇
- OpenShift在企業中的實踐:PaaS DevOps微服務(第2版)
- 重學Java設計模式
- 深入淺出Serverless:技術原理與應用實踐
- SQL經典實例(第2版)
- 程序設計基礎教程:C語言
- Visual C#通用范例開發金典
- BeagleBone Black Cookbook
- HTML+CSS+JavaScript網頁設計從入門到精通 (清華社"視頻大講堂"大系·網絡開發視頻大講堂)
- C++17 By Example
- Serverless工程實踐:從入門到進階
- 區塊鏈技術與智能服務應用