官术网_书友最值得收藏!

Installing UCS chassis and components

Care must be taken during the installation of all components as failure to follow installation procedures may result in component malfunction and bodily injury.

UCS chassis don'ts:
Do not try to lift even the empty chassis alone. At least two people are required to handle a UCS chassis.
Do not handle internal components such as CPU, RAM, and mezzanine cards without an ESD field kit.

Physical installation is pided into three sections:

  • Blade server component (CPU, memory, hard drives, and mezzanine card) installation
  • Chassis and component (blade servers, IOMs, fan units, and power supplies) installation
  • Fabric Interconnect installation and physical cabling
主站蜘蛛池模板: 红安县| 来凤县| 屏边| 和平县| 自治县| 楚雄市| 江陵县| 凉城县| 子洲县| 陆河县| 东城区| 甘孜县| 遂宁市| 塔河县| 黑水县| 宿松县| 洛川县| 武平县| 太白县| 翁牛特旗| 阿瓦提县| 邹城市| 库车县| 都昌县| 阳春市| 常宁市| 永胜县| 丘北县| 六盘水市| 磐安县| 丰都县| 安顺市| 齐河县| 铅山县| 阜新| 大同县| 张北县| 浑源县| 巴中市| 光泽县| 图片|