- Manage Your SAP Projects with SAP Activate
- Vinay Singh
- 153字
- 2021-07-08 10:07:14
Key components of workshop B (Delta design)
Workshop B is for the Delta design of functional gaps. It is designed to prioritize backlog items. It:
- Picks up from where workshop A stops, so as to leverage the process flow
- Helps to visualize the solution design for functional gaps
- Captures requirements based on feedback
- Drives early approval
- Expects iteration
- Standardizes solution design so as to minimize modification
- Brings upfront the integration challenges
Processes such as OTC (create an order, delivery, billing, and A/R collection) and PTP (create a purchase order, receive the product, and pay the vendor) are complex in nature. One needs to plan more effectively for integration workshops.
A Delta design workshop agenda, scope item, and process flow are uploaded in the SAP Solution Manager. Also, the complete documentation of the organizational structure, business processes, functional specifications, and the WRICEF list, to name a few, are uploaded into the SAP Solution Manager.
推薦閱讀
- Learn ECMAScript(Second Edition)
- ASP.NET Web API:Build RESTful web applications and services on the .NET framework
- Apache ZooKeeper Essentials
- Java應用與實戰
- Visual Studio 2012 Cookbook
- Rust編程:入門、實戰與進階
- 精通搜索分析
- Learning Bayesian Models with R
- oreilly精品圖書:軟件開發者路線圖叢書(共8冊)
- YARN Essentials
- Go語言精進之路:從新手到高手的編程思想、方法和技巧(2)
- Android應用開發深入學習實錄
- Arduino機器人系統設計及開發
- MySQL核心技術與最佳實踐
- Daniel Arbuckle's Mastering Python