官术网_书友最值得收藏!

Prerequisites

To kick off a Scrum team, you'll need a few items:

  • A timer: This is used for time-boxing meetings; most smartphones have one of these
  • Whiteboard or wall space: This will be used to create your visible workspace
  • Tape for marking columns or swim lanes: If you're using a whiteboard, electrical tape works well; if you're using a painted wall, you'll need to use low tack tape, such as masking tape
  • Index cards: These are for writing User Stories
  • post-it notes: These are for writing User Story tasks
If you're putting post-its straight onto a wall, not a whiteboard, buy the post-it? Super Sticky variety. They have much more sticking power, and will save you from having to pick post-its off the floor and trying to figure out where they came from.
  • Black sharpie pens (fine tip): These are used for writing User Stories and tasks
  • Planning poker cards: These are used for estimating User Stories
For those moments when you don't have a spare whiteboard but need to write for the whole team to see, use a post-it? 559 Super Sticky Easel Pad. These are sticky too, so they can be torn off the pad and stuck to a spare wall or window. And no, I don't have shares in 3M (the makers of post-its), but perhaps all Scrum Masters should.

The previous suggestions form a basic Agile toolkit, which each Scrum Master should have. I keep my own toolkit in a clear plastic fishing tackle box.

主站蜘蛛池模板: 新绛县| 明星| 章丘市| 临西县| 天柱县| 邵阳市| 盐城市| 柞水县| 临沭县| 含山县| 德令哈市| 景德镇市| 香格里拉县| 黑水县| 十堰市| 丰宁| 竹山县| 清水河县| 兴安县| 谢通门县| 怀来县| 安国市| 定陶县| 积石山| 夏津县| 二连浩特市| 邹平县| 临颍县| 石棉县| 盘锦市| 昌平区| 海原县| 保靖县| 开阳县| 无极县| 桐乡市| 松潘县| 蒙山县| 闸北区| 革吉县| 新干县|