官术网_书友最值得收藏!

Final requirement

Despite the fact that we're model building right now, we want to build with the future in mind. The future is a production-ready machine learning system that performs linear regression. So whatever functions and methods we write have to take into account other things that may occur in a production environment that may not occur in the model -building phase.

The following are things to consider:

  • Unseen values: We have to write a function that is able to encode previously unseen values.
  • Unseen variables: At some point in the future we might pass a different version of the data in that may contain variables that are unknown at model-building time. We would have to handle that.
  • Different imputation strategies: Different variables will require different strategies for guessing missing data.
主站蜘蛛池模板: 太原市| 囊谦县| 武川县| 青阳县| 永和县| 甘泉县| 宁津县| 鹤壁市| 太谷县| 民和| 象州县| 怀来县| 嘉鱼县| 镇平县| 祁连县| 安义县| 车险| 荆州市| 隆化县| 当阳市| 渭源县| 宣武区| 鹤岗市| 宁德市| 黄梅县| 丰都县| 石嘴山市| 宝坻区| 元江| 双城市| 池州市| 平潭县| 溧水县| 鹰潭市| 嫩江县| 新宁县| 顺平县| 塘沽区| 察雅县| 桐梓县| 龙州县|