官术网_书友最值得收藏!

  • Learn SOLIDWORKS 2020
  • Tayseer Almattar
  • 225字
  • 2021-06-24 12:16:37

Defining

Now that we have our shapes outlined, we can start defining our whole sketch. Follow these steps to do so:

  1. We can define the sketch by adding the dimensions and relations shown in the following diagram. Note that, when defining one line, the mirrored line will also be defined in the same way (20 mm). Also, note that we can add dimensions between the mirrored entities (50 mm). After adding those dimensions, we will notice that it becomes fully defined:

In this exercise, we defined the whole sketch after applying the mirror. An alternative approach is to fully define the first triangle before using the Mirror Entities command. In this scenario, the mirrored triangle will also be fully defined, directly after mirroring. 

The Copy option in mirroring is used if we wish to keep the original shape. If the Copy option is checked, we will keep the original shape and create a mirrored shape. If it is unchecked, the original shape will be deleted and we'll be left with the mirrored shape only.

This concludes the Mirror Entities sketching command. Note that, in practice, whichever order we outline and define our sketches in can vary. As you gain more experience with sketching, you will have your own approach for doing things. Now, we can start learning about the Offset Entities sketch command. 

主站蜘蛛池模板: 怀来县| 察哈| 新沂市| 烟台市| 翼城县| 广安市| 宝清县| 汉阴县| 吉水县| 阿克陶县| 宜川县| 金溪县| 儋州市| 商南县| 辽宁省| 洛阳市| 贵港市| 冷水江市| 刚察县| 邢台市| 黄骅市| 玉环县| 新巴尔虎右旗| 抚远县| 古交市| 藁城市| 隆德县| 阿瓦提县| 泰安市| 阜新| 湾仔区| 永仁县| 芒康县| 文登市| 兴安盟| 遵义市| 福建省| 景谷| 榆中县| 肇州县| 剑阁县|