4 Preparation for Submarine Cable Installation
4.0.1 Submarine cable installation permits shall be obtained before installation works commence.
4.0.2 Before marine installation,foreign flag vessels shall obtain the non-open waters entry approvals.
4.0.3 Beach manhole construction shall be completed before cable landing.Beach manholes shall have a grounding device whose earth resistance shall not be greater than 10Ω.
4.0.4 Pre-lay grapnel run and clearance of submarine cable routes shall be carried out in accordance with the requirements of the project contract and design document.
推薦閱讀
- 架空輸電線路荷載規(guī)范
- DL/T 5526-2017 換流站噪聲控制設計規(guī)程
- GB/T 51146-2015 硝化甘油生產(chǎn)廢水處理設施技術(shù)規(guī)范
- GB/T51167-2016海底光纜工程驗收規(guī)范(英文版)
- GB/T 51257-2017 液化天然氣低溫管道設計規(guī)范
- 強夯地基技術(shù)規(guī)程
- GB 51006-2014 石油化工建(構(gòu))筑物結(jié)構(gòu)荷載規(guī)范(英文版)
- 鉆探、井探、槽探操作規(guī)程
- DL 5068-2014 發(fā)電廠化學設計規(guī)范
- GB/T 50398-2018 無縫鋼管工程設計標準
- DL/T5210.4-2009電力建設施工質(zhì)量驗收及評價規(guī)程第4部分:熱工儀表及控制裝置(英文版)
- 建筑廢棄物再生工廠設計標準
- 變電站和換流站給水排水設計規(guī)程
- DL/T 5504-2015 特高壓架空輸電線路大跨越設計技術(shù)規(guī)定
- GB50507-2010鐵路罐車清洗設施設計規(guī)范(英文版)