6 Stringing
6.0.1 Prior to stringing,grading for out-of-roundness of pipe ends and wall thickness shall be conducted and stringing works shall be compliance with design requirements.
6.0.2 The landform and geological conditions of right-of-way of pipes intended shall be familiarized and pipes shall be strung on the wider sides when surrounding area is gully,road and bank,etc.Pipes shall not be laid on the structures.
6.0.3 The end-to-tail connection of pipeline is required and neighboring pipe ending turns up to be zigzag shaped and separated.Sand bag or other flexible material should be used for pipe supports.
6.0.4 During stringing,steel pipe shall be stably placed.
6.0.5 For stringing in trench,the safety distance from edge of pipeline to edge of pipe trench shall be in compliance with the provisions of table 6.0.5.
Table 6.0.5 Safety Distance from Edge of Pipeline to Edge of Pipe Trenchy(m)

- 設計系統發展研究
- DL/T 5491-2014 電力工程交流不間斷電源系統設計技術規程
- 真空電子器件生產線設備安裝技術標準
- SH3011-2011石油化工工藝裝置布置設計規范(英文版)
- GB 50471-2018 煤礦瓦斯抽采工程設計標準
- GB/T 51266-2017 機械工廠年時基數設計標準
- GB 50545-2010110kV~750kV架空輸電線路設計規范(英文版)
- GB/T 51238-2018 巖溶地區建筑地基基礎技術標準
- GB/T 51243-2017 物聯網應用支撐平臺工程技術標準
- GB/T 50050-2017 工業循環冷卻水處理設計規范
- DL/T5161.8-2002電氣裝置安裝工程質量檢驗及評定規程第8部分:盤、柜及二次回路接線施工質量檢驗(英文版)
- GB 50426-2016 印染工廠設計規范
- GB50468-2008焊管工藝設計規范(英文版)
- 鐵路罐車清洗設施設計標準
- GB/T 51293-2018 城市軌道交通給水排水系統技術標準