Foreword
According to the requirements of JBH[2006]No.136 issued by former Ministry of Construction"Notice on Printing the Development and Revision Plan of National Engineering Construction Standards in 2006(second batch)",this Code is hereby established by China First Metallurgical Group Co.,Ltd.jointly with related companies.
During establishment of the Code,the preparation group has studied related current national laws,regulations and standards;made extensive and in-depth investigation;concluded many years'experience in the installation of hydraulic,lubrication and pneumatic system with regards to metallurgical mechanical equipment;widely sought the advice from related companies and experts;repeatedly discussed,revised and enhanced the provisions of the Code;and finalized this text upon review.
The Code consists of nine chapters with the main contents as follows:general provisions;basic requirements;equipment and material mobilization;equipment installation;pipe fabrication and installation;pipe flushing,purging and pressure test;commissioning and test run;pipe painting,and safety and environmental protection.
The provision(s)printed in bold type in this Code is(are)mandatory,and shall be enforced strictly.Ministry of Housing and Urban-Rural Development is responsible for Code management and explanation of the mandatory provisions,while China Metallurgical Construction Association is in charge of daily management,and China First Metallurgical Group Co.,Ltd.is responsible for explanation of the specific technical contents.All relevant organizations are kindly requested to sum up and accumulate experiences in actual practices during the process of implementing this code.The relevant opinions and advice,whenever necessary,can be posted or passed on to China First Metallurgical Group Co.,Ltd.(address:No.3 Gongye Avenue,Qingshan District,Wuhan,Hubei province;Zip code:430081;E-mail:jisc@cfmcc.com or xiaolw@cfmcc.com;Fax:027-86308221)for reference in case of future revision.
Chief Development Organization:
China First Metallurgical Group Co.,Ltd.
Participating Development Organization:
Shanghai Baoye Group Co.,Ltd.
Chief Drafting Staff:
Zou Yichang Xiao Liwen Zhang Li Wu Gangping Song Zhanjiang
Liu Shiyin Lao Xiaoyun Luo Jin Kong Daping Li Mingzhu
Yu Huachun Guo Qijiao Zhang Yongxin Li Xi Yan Yu
Zheng Yongheng Wu Mingfu Li Changliang Lu Fuli Zhao Cong
Sun Qing
- GB/T 50381-2018 城市軌道交通自動售檢票系統工程質量驗收標準
- 中文版Rhino 5.0完全自學教程(培訓教材版)
- YS/T 5225-2016土工試驗規程
- GB/T 50554-2017 煤炭工業礦井工程建設項目設計文件編制標準
- 加油站在役油罐防滲漏改造工程技術標準
- 滌綸工廠設計標準
- GB 51133-2015 醫藥工業環境保護設計規范
- GB/T 51025-2016 超大面積混凝土地面無縫施工技術規范
- GB 51135-2015 轉爐煤氣凈化及回收工程技術規范
- 建設工程化學灌漿材料應用技術標準
- DL/T5232-2010±800kV及以下直流換流站電氣裝置安裝工程施工及驗收規程(英文版)
- GB 50311-2016 綜合布線系統工程設計規范
- GB50742-2012煉鋼機械設備安裝規范(英文版)
- Kubeflow學習指南:生產級機器學習系統實現
- GB50612-2010冶金礦山選礦廠工藝設計規范(英文版)