- GB50168-2006電氣裝置安裝工程電纜線路施工及驗收規(guī)范(英文版)
- 中華人民共和國住房和城鄉(xiāng)建設(shè)部
- 428字
- 2020-09-25 15:23:28
Foreword
This code is prepared by the requirement of Announcement of printing and distribution of establishment and revision plans for national standards in engineering construction in 2001 to 2002(Jian Biao[2002]No.85)of Ministry of Construction of the People's Republic of China.This code is revised on the basis of GB 50168-92 Electric Equipment Installation Engineering Code for Construction and Acceptance of cable System by China Electric Power Research Institute and the relevant departments.
This code comprises 8 chapters and 1 appendixes with the main contents as follows:General provisions,Terms,Transportation,storage and keeping of cables and accessories,Construction of attached facilities and structures of power cable line,Laying of cables,Installation of cable accessories,Construction of the fireproofing and flame-retardant facilities in power cable line,Transfer and acceptance.
As compared with the former edition,the following revisions are made herein:
1.The chapter"Terms"is additionally incorporated.
2.The more explicit provisions in connection of cable duct are given.
3.The more strict and specific provisions in cable fireproof construction are given.
4.The provisions in construction of cable dividing box are additionally incorporated.
5.The more strict and specific provisions in construction of overhead cable line are given.
6.In the chapter of"installation of the cable accessories",the specific provisions in installation of termination and joint of high voltage cable are given.
The provisions printed in bold type in this code are compulsory ones and must be enforced strictly.
This code is in charge of the administration of Ministry of Construction of the People's Republic of China and the obligatory items are under the explanation of it.China Electric Power Research Institute is responsible for the explanation of specific technical contains.
During the implementation of this code,the interests concerned are requested to summarize experience from actual practices and refer any comments and suggestions on modification or supplementation to China Electric Power Research Institute at the address of No.33.South Binhe Road.Xicheng District.Beijing.Postcode 100055.
Chief Development Organization,Participating Development Organizations and Chief Drafting Staff are:
Chief Development Organization:
China Electric Power Research Institute
Participating Development Organizations:
Wuhan High Pressure Institute
Gansu Electric Power Engineering Co.
Northeast Electric Management Bureau No.2 Engineering Co.
Jiangsu Electric Power Construction No.1 Company
Jilin Electric Power Construction Head Company
Beijing Electric Power Co.
Beijing Electric Power Engineering Co.
Dalian Electric Supply Bureau
Xi'an Electric Supply Bureau
Lanzhou Electric Supply Co.
Chief Drafting Staff:
Chen Fayu Yang Rongkai Xue Ying Sun Guanfu Wang Qiang Chen Guiying
Li Shiyi Zhou Zuochun Liao Hongmei Jing Xiaodong Su Shaogang
- GB50169-2006電氣裝置安裝工程接地裝置施工及驗收規(guī)范(英文版)
- GB/T 51183-2016 農(nóng)業(yè)溫室結(jié)構(gòu)荷載規(guī)范
- DL/T 5508-2015 燃?xì)夥植际焦┠苷驹O(shè)計規(guī)范
- 煤炭礦井工程基本術(shù)語標(biāo)準(zhǔn)
- GB/T 51238-2018 巖溶地區(qū)建筑地基基礎(chǔ)技術(shù)標(biāo)準(zhǔn)
- GB/T 51278-2018 數(shù)字蜂窩移動通信網(wǎng)LTE工程技術(shù)標(biāo)準(zhǔn)
- GB 51284-2018 煙氣脫硫工藝設(shè)計規(guī)范
- 鐵路罐車清洗設(shè)施設(shè)計標(biāo)準(zhǔn)
- GB 51208-2016 人工制氣廠站設(shè)計規(guī)范
- 中國綠色工業(yè)年鑒2020
- GB 51181-2016 煤炭洗選工程節(jié)能設(shè)計規(guī)范
- 巖土工程勘察報告編制規(guī)程
- 工程師形成的質(zhì)量規(guī)制研究
- 建筑施工技術(shù)(中職)
- 石油化工大型設(shè)備吊裝現(xiàn)場地基處理技術(shù)標(biāo)準(zhǔn)