5.6 Test Run
5.6.1 Carry out not less than 5 times back-forth move for the rolling mill low-speed screw down device and high-speed screw down device.High-low limiting position shall be accurate.
Inspection method:observation,check test run record.
5.6.2 Not less than 0.5 hour no load run of the main drive motor;the motor drives the reducer for not less than 0.5 hour test run;The motor drives the reducer,gear seat for not less than 0.5 hour test run;The motor drives reducer,gear seat and rolling mill for at least not less than 2 hours test run at 25%,50%,75%,100% of rated speed respectively.The reversible rolling mill shall also need run forward and reverse not less than 1 hour individually according to the aforementioned four classes.When several rolling mills drove by one driving device,supposed to run the first rolling mill,then carry out the test run for the second one and the rest can be done in the same manner until the last one be finished.
Inspection method:observation,check test run record.
5.6.3 Run the roll changing device and other equipment forward and backward 5 to 10 times.The stop position shall meet the requirements of technical documents.
Inspection method:observation,check test run record.
- 工業企業技術改造升級投資指南:指南 解讀 案例(2023年版)
- DL/T 5390-2014 發電廠和變電站照明設計技術規定
- GB50169-2006電氣裝置安裝工程接地裝置施工及驗收規范(英文版)
- GB 51138-2015 尿素造粒塔工程施工及質量驗收規范
- 巖土靜力載荷試驗規程
- GB 50545-2010110kV~750kV架空輸電線路設計規范(英文版)
- GB/T 51238-2018 巖溶地區建筑地基基礎技術標準
- 電子CAD技術項目化教程
- GB/T 51339-2018 非煤礦山采礦術語標準
- 鄭州軌道交通安裝工藝運營需求標準
- SH/T 3405-2012 石油化工鋼管尺寸系列(英文版)
- GB 50360-2016 水煤漿工程設計規范
- GB 50403-2017 煉鋼機械設備工程安裝驗收規范
- DL/T 5501-2015 凍土地區架空輸電線路基礎設計技術規程
- GB 50384-2016 煤礦立井井筒及硐室設計規范