5.2 Proportioning
5.2.1 The series of proportioning line shall be in accordince with the numbers of sinter machine,that is,one proportionign line for one sinter machine.
5.2.2 Automatic proportioning by weight shall be adopted for raw materials,fluxes and solid fuels.
5.2.3 The storage capacity of proportioning bins shall be designed for more than 8 hours operation.
5.2.4 The number of proportioning bins shall be determined according to proportioning ratio and proportioning equipment capacity.The number of major iron-bearing material bins shall not be less than 3,the number of the auxiliary raw material(such as fuels and flux)should be two for each kind of material,and one bin with two feed openings can be adopted for bins with low proportioning ratio.
5.2.5 The major iron-bearing materials and materials with little viscosity shall be proportioned at first.The solid fuels shouldn't be proportioned at first.
5.2.6 The sinter returns and BF returns should be proportioned respectively.
5.2.7 The quicklime or hydrated lime should be used as flux and added in mixture.The addition of the flux shall be determined according to the raw materials conditions and test results.
5.2.8 The setup of quicklime slaking(hydration)facilities shall be determined according to raw material conditions,test results,environmental protection requirements,quicklime dosage and mixing and granulating time.
5.2.9 When the dust reclaimed is proportioned in proportioning system,it should be pre-wetted before proportioning.
- GB 51139-2015 纖維素纖維用漿粕工廠設計規范
- GB 51180-2016 煤礦采空區建(構)筑物地基處理技術規范
- 工業企業技術改造升級投資指南:指南 解讀 案例(2023年版)
- GB/T 50554-2017 煤炭工業礦井工程建設項目設計文件編制標準
- 加油站在役油罐防滲漏改造工程技術標準
- 真空電子器件生產線設備安裝技術標準
- GB/T 50491-2018 鐵礦球團工程設計標準
- 滌綸工廠設計標準
- GB50060-20083~110kV高壓配電裝置設計規范(英文版)
- GB 50169-2016 電氣裝置安裝工程 接地裝置施工及驗收規范
- GB/T 51025-2016 超大面積混凝土地面無縫施工技術規范
- GB50473-2008鋼制儲罐地基基礎設計規范(英文版)
- 中國綠色工業年鑒2020
- GB 50311-2016 綜合布線系統工程設計規范
- DL/T 5501-2015 凍土地區架空輸電線路基礎設計技術規程