- DL/T5161.7-2002電氣裝置安裝工程質量檢驗及評定規程第7部分:旋轉電機施工質量檢驗(英文版)
- 中國電力企業聯合會
- 349字
- 2020-09-25 11:23:22
Foreword
Specification for construction quality checkout and evaluation of electric equipment installation is a series of standards for construction quality checkout,acceptance and evaluation of electric equipment installation.
The set of standards is comprised of the following 17 parts:
—Part 1:General rules;
—Part 2:High-voltage electric equipments;
—Part 3:Power transformers,oil-immersed type reactors and instrument transformers;
—Part 4:Busbar equipments;
—Part 5:Power cable lines;
—Part 6:Grounding devices;
—Part 7:Rotating electrical machines;
—Part 8:Panels,cabinets and secondary circuit wirings;
—Part 9:Batteries;
—Part 10:35kV and below over-head power line installation;
—Part 11:Elevator;
—Part 12:Low-voltage apparatus;
—Part 13:Power converter equipments;
—Part 14:Cranes;
—Part 15:Electric equipments in explosive or inflammable hazardous environment;
—Part 16:1kV and under feeder cable engineering;
—Part 17:Electric lighting devices.
This part is the seventh part of the series standards,which is established according to the notice of issuing the plan of Establishment and Revise Power Industrial Standards in 1997 issued by the original ministry of electric power industry(Zong Kejiao[1998]No.28).
This part is the tabular form of GB 50170 Electric equipment installation engineering code for construction and acceptance of rotating electrical machines as well as related national standard and professional standard.
This part is proposed by and under the jurisdiction of China Electric Power Construction Research Institute.
Chief Development Organization:
China Electric Power Construction Research Institute
Participating Development Organizations:
No3.Engineering Construction Company of Northeast Electric Power Administrative Bureau
Liaoning No1.Electric Power Construction company
JiLin Electric Power Construction Company
Chief Drafting Staff:
Zhao Dianlin Liu Qiang Chen Guiying Chen Fayu Zhang Anrong
Wu Lifeng Dong Gang
China Electric Power Construction Research Institute is responsible for the explanation of this part.
- GB50170-2006電氣裝置安裝工程旋轉電機施工及驗收規范(英文版)
- 工業企業技術改造升級投資指南:指南 解讀 案例(2023年版)
- DL/T 5492-2014電力工程遙感調查技術規程
- 電力調度數據網絡工程設計規程
- GB 50309-2017 工業爐砌筑工程質量驗收標準
- GB 50349-2015 氣田集輸設計規范
- GB50432-2007煉焦工藝設計規范(英文版)
- 強夯地基技術規程
- 微波集成組件生產工廠工藝設計標準
- 濕陷性土起始壓力測試規程
- 機械基礎地基動力特性測試規程
- GB 51176-2016 干混砂漿生產線設計規范
- 電氣工程師手冊(第4版)
- GB/T50063-2008電力裝置的電測量儀表裝置設計規范(英文版)
- 陽極焙燒爐用多功能機組安裝技術規程