4 General
4.0.1 This standard is established to ensure project quality and standardize the construction acceptance of flue gas denitration projects of thermal power plant.
4.0.2 The construction acceptance of flue gas denitration projects of thermal power plant shall be carried out in accordance with this standard,with timely evaluation,and quality acceptance and evaluation certificate issuance.The projects construction acceptance shall comply with current national mandatory standards besides this standard.The imported equipment shall also comply with the standards of the producing countries and the manufacturers.
4.0.3 The construction company shall prepare a quality inspection and evaluation items table for the undertaken project according to the actual situation of denitration project and the requirements of Chapters 5~8.The quality inspection and evaluation items table prepared by the construction company shall be used after review and approval by the project owner or its representative(e.g.supervision organization).
4.0.4 The construction quality inspection and acceptance of flue gas denitration projects shall be carried out by section(inspection lot),sub-item,branch and unit projects in sequence.The next process shall not be started before the previous process passes inspection acceptance and quality evaluation.
4.0.5 The quality inspection,acceptance and evaluation of section(inspection lot),sub-item,branch and unit projects shall have accurate measurements,exact inspection results and complete data and signatures.Records shall be maintained for concealed works(see Table B.6 of DL/T 5417-2009).
4.0.6 The construction quality inspection,acceptance and unit project quality evaluation shall be based on the self-inspection and evaluation by the construction company.The concealed works shall be accepted by related organizations upon the notice of the construction company before concealment.Photos and video data,and acceptance documents shall be kept.
4.0.7 The quality inspectors of the superior can do spot check and re-check on the project inspection items at any time,and make evaluation based on the re-checked inspection result.
4.0.8 The participants and inspectors from all parties for construction quality acceptance shall be qualified accordingly and carry out project quality inspection,acceptance and evaluation strictly in accordance with this standard and relevant national and industrial standards,and be responsible for the project under acceptance and evaluation.
4.0.9 The ammonia station shall be sited and designed in accordance with GB 50058.
4.0.10 The fire fighting of ammonia station shall be in accordance with GB 50160.
4.0.11 The records of construction quality acceptance and evaluation shall be collated and filed as required,and handed over to the owner.
- GB/T 50381-2018 城市軌道交通自動(dòng)售檢票系統(tǒng)工程質(zhì)量驗(yàn)收標(biāo)準(zhǔn)
- 城市地下空間規(guī)劃標(biāo)準(zhǔn)
- GB/T 50554-2017 煤炭工業(yè)礦井工程建設(shè)項(xiàng)目設(shè)計(jì)文件編制標(biāo)準(zhǔn)
- 高素質(zhì)應(yīng)用型工程技術(shù)人才培養(yǎng)理論與實(shí)踐探索
- DL/T 5503-2015 直流換流站施工圖設(shè)計(jì)內(nèi)容深度規(guī)定
- GB 50222-2017 建筑內(nèi)部裝修設(shè)計(jì)防火規(guī)范
- GB/T50663-2011核電廠工程水文技術(shù)規(guī)范(英文版)
- 鐵路罐車清洗設(shè)施設(shè)計(jì)標(biāo)準(zhǔn)
- GB/T 51218-2017 機(jī)械工業(yè)工程設(shè)計(jì)基本術(shù)語(yǔ)標(biāo)準(zhǔn)
- 建設(shè)工程化學(xué)灌漿材料應(yīng)用技術(shù)標(biāo)準(zhǔn)
- GB 51181-2016 煤炭洗選工程節(jié)能設(shè)計(jì)規(guī)范
- GB/T 51189-2016 火力發(fā)電廠海水淡化工程調(diào)試及驗(yàn)收規(guī)范
- 核電廠建構(gòu)筑物維護(hù)及可靠性鑒定標(biāo)準(zhǔn)
- GB/T 51272-2018 煤炭工業(yè)智能化礦井設(shè)計(jì)標(biāo)準(zhǔn)
- GB/T 51246-2017 石油化工液體物料鐵路裝卸車設(shè)施設(shè)計(jì)規(guī)范