官术网_书友最值得收藏!

6.11 Head Bending Rail and Intermediate Rail

Ⅰ Dominant Item

6.11.1 Preset thermal expansion gap for rail joints must meet requirements of design technical document.

Check quantity:to check all.

Inspection method:to check installation.

Ⅱ General Item

6.11.2 Installation for head bending rail shall take chain blade of head wheel as reference;tolerance for installation of the bending rail shall meet requirements in Table 6.11.2,see Figure 6.11.2.

Check quantity:to check all.

Inspection method:see Table 6.11.2.

Table 6.11.2 Tolerance for installation of head bending rail

img
img

Figure 6.11.2 Head bending rail

1-Chain wheel;2-Head bending rail;3-Longitudinal centerline of sintering equipment

6.11.3 Tolerance for intermediate rail shall meet requirements in Table 6.11.3.

Check quantity:to check all.

Inspection method:see Table 6.11.3.

Table 6.11.3 Tolerance for installation of intermediate rail

img
主站蜘蛛池模板: 闽侯县| 瓦房店市| 怀远县| 星子县| 武清区| 舞钢市| 邵阳县| 榆社县| 罗城| 东山县| 宁南县| 陕西省| 南丰县| 商都县| 淳安县| 金塔县| 高邮市| 汾西县| 五寨县| 沽源县| 蚌埠市| 关岭| 元氏县| 江孜县| 荔波县| 焦作市| 公安县| 涟源市| 新绛县| 延安市| 壤塘县| 科技| 富裕县| 青田县| 郴州市| 桐庐县| 潼关县| 福州市| 镇康县| 通江县| 博爱县|