5.3 Mixture Equipment
Ⅰ Dominant Item
5.3.1 Work face of lower roller block shall fit well the side face of roll ring of cylinder,gap between work face of upper roller block and side face of roll ring of cylinder shall meet requirements in design technical document.
Check quantity:to check all.
Inspection method:to check installation quality records,to check with fill gauge.
5.3.2 To assemble gear ring and cylinder,to assemble two gear rings into a circle around the cylinder,their contact faces after tightening by bolts shall be good fit and shall not be penetrated by a fill gauge 0.05mm.
Check quantity:to check all.
Inspection method:to check installation quality records,to take actual measurements.
Ⅱ General Item
5.3.3 Tolerance for base installation shall meet requirements in Table 5.3.3.
Check quantity:to check all.
Inspection method:shown in Table 5.3.3.
Table 5.3.3 Tolerance for base installation


Figure 5.3.3 Idler roller and base
1-Base;2-Upper idler roller;3-Lower idler roller;4-Bearing base;5-Longitudinal centerline of base;6-Transversal centerline of base;7-Axial centerline of idler roller;8-Center point on top surface of idler roller
5.3.4 Roll ring shall be well contacted with roll surface of idler roller;contacting width shall not be less than 60% of total width of roll ring.
Check quantity:to check all.
Inspection method:to check with 0.05mm fill gauge.
5.3.5 Tolerance for installation of idler roller and roller block shall meet requirements in Table 5.3.5.
Check quantity:to check all.
Inspection method:shown in Table 5.3.5.
Table 5.3.5 Tolerance for installation of idler roller and roller block

Table 5.3.5(Continued)

5.3.6 Tolerance for installation of cylinder and driving device shall meet requirements in Table 5.3.6.
Checkquantity:to check all.
Inspection method:shown in Table 5.3.6.
Table 5.3.6 Tolerance for installation of cylinder and driving device

5.3.7 Installation for open gears of driving device shall meet requirements in design technical document or requirements in GB 50231 General Code for Construction and Acceptance of Mechanical Equipment Installation Engineering.
Check quantity:to check all.
Inspection method:to check with fill gauge,dye,lead extrusion.
5.3.8 Tolerance for installation of hopper and casing shall meet requirements in Table 5.3.8.
Check quantity:to check all.
Inspection method:see Table 5.3.8.
Table 5.3.8 Tolerance for hopper and hood installation

5.3.9 Bulk hopper at feeding side of cylinder,gap between its end face and inlet end face of cylinder shall meet requirements in design technical document.
Check quantity:to check all.
Inspection method:to check itby measuring.
- DL/T 5526-2017 換流站噪聲控制設計規程
- GB 51289-2018 煤炭工業露天礦邊坡工程設計標準
- YD/T 5131-2005 移動通信工程鋼塔桅結構設計規范(英文版)
- 真空電子器件生產線設備安裝技術標準
- GB 50222-2017 建筑內部裝修設計防火規范
- GB/T 51183-2016 農業溫室結構荷載規范
- GB 51137-2015 電子工業廢水廢氣處理工程施工及驗收規范
- GB50473-2008鋼制儲罐地基基礎設計規范(英文版)
- GB 50588-2017 水泥工廠余熱發電設計標準
- GB/T 51189-2016 火力發電廠海水淡化工程調試及驗收規范
- GB/T 51325-2018 煤焦化粗苯加工工程設計標準
- DL/T 5504-2015 特高壓架空輸電線路大跨越設計技術規定
- GB50078-2008煙囪工程施工及驗收規范(英文版)
- GB/T 51172-2016 在役油氣管道工程檢測技術規范
- GB 51197-2016 煤炭工業露天礦節能設計規范