3.3 Anchor Bolt
Ⅰ Dominant Item
3.3.1 Specification of anchor bolt and tightening must meet requirements in design technical document.Check quantity:spot check 20%,and minimum 4 pieces.
Inspection method:to check quality certificates and tightening records,to take measurement by a tape,to check by hammering a nut.
Ⅱ General Item
3.3.2 Oil stain and scale on anchor bolts shall be cleared up,appropriate grease shall be applied on threads.
Check quantity:to c heck all.
Inspection method:inspection.
3.3.3 An anchor bolt shall be installed vertically in a preset hole;distance from its surface to wall of the hole shall be more than 15mm,and it shall not touch the bottom of hole.
Check quantity:to check all.
Inspection method:inspection.
推薦閱讀
- GB50168-2006電氣裝置安裝工程電纜線路施工及驗收規范(英文版)
- DL/T 5492-2014電力工程遙感調查技術規程
- 高素質應用型工程技術人才培養理論與實踐探索
- 焊接技能實訓
- 電站汽輪發電機組輔機換熱設備選型設計規程
- 微波集成組件生產工廠工藝設計標準
- GB/T51154-2015海底光纜工程設計規范(英文版)
- GB 50426-2016 印染工廠設計規范
- 《電氣裝置安裝工程 低壓電器施工及驗收規范》實施指南
- GB50679-2011煉鐵機械設備安裝規范(英文版)
- 電力系統無功補償及調壓設計技術導則
- DL/T 5493-2014 電力工程基樁檢測技術規程
- 中國磁光電混合存儲產業藍皮書
- GB50475-2008石油化工全廠性倉庫及堆場設計規范(英文版)
- GB/T 51272-2018 煤炭工業智能化礦井設計標準