- GB50690-2011石油化工非金屬管道工程施工質量驗收規范(英文版)
- 住房和城鄉建設部
- 401字
- 2020-09-24 18:21:51
Foreword
According to the requirements of Document Jian Biao[2007]No.126 issued by Ministry of Construction(MOC)-"Notice on Printing the Development and Revision Plan of National Engineering Construction Standards in 2007(the Second),this code is formulated by Shengli Petroleum and Chemical Construction Corporation in collaboration with relevant organizations.
During the process,a monographic study and wide investigation was made by the preparation group to sum up practical experience in acceptance of non-metallic piping engineering in petrochemical engineering.Under the guideline of"split acceptance from evaluation,intensify acceptance,improve means and control process",solicited wide opinions from relevant organizations and experts as design,construction and supervision in different ways,this code was not finalized until it was examined and some key issues were revised repeatedly.
This code comprises 10 chapters.The main technical contents of this code are:General Provisions,Terms,Acceptance,Storage and Handling of Piping Components,Fabrication of Piping,Erection,Assembly,Examination of Piping Joints,Piping System Test,Piping System Purging and Cleaning Inspection,Technical Documentation of Construction Completion.
The provisions printed in bold type are compulsory ones and must be enforced strictly.
Ministry of Housing and Urban-Rural Development and General Administration of Quality Supervision is in charge of the administration of this code and the explanation of the compulsory provisions.Sinopec is responsible for the routine management,while Shengli Pertrochemical Construction Corporation reserves the rights to the interpretation of specific technical contents.All organizations are kindly requested to sum up and accumulate your experiences in actual practices during the process of implementing this code.The relevant opinions and advice,whenever necessary,can be posted or reflected to Shengli Petroleum and Chemical Construction Corporation(No.324 XiSi Road,Dongying,Shandong Province,Zip:257064,Email:tangriguang.slyt@sinopec.com)for the reference of future revision.
Chief development organization,the participating organizations,chief drafting staff and main auditing staff of this code are:
Chief Development Organization:
Shengli Oilfield Shengli Petroleum and Chemical Construction Corporation
Participating Organization:
Sinopec Tenth Construction Company
Sinopec Nanjing Engineering& Construction Inc.
Chief drafting staff:
Jiang Junrong Tang Riguang Liu Dong Duan Xiufang Jiang Guoxian
Wang Guangchao Cheng Kezhong
Main auditing staff:
Shu Zhijun Ge Chunyu Chen Yongliang Zhang Guihong Wang Zhizhong
Meng Desu Shang Yaru Xue Jiuliang Cai Guoxiong Li Yi Du Zonglan
Jiang Kuishu
- 工業企業技術改造升級投資指南:指南 解讀 案例(2023年版)
- GB 51245-2017 工業建筑節能設計統一標準
- GB/T 50554-2017 煤炭工業礦井工程建設項目設計文件編制標準
- GB 50077-2017 鋼筋混凝土筒倉設計標準
- GB 51145-2015 煤礦電氣設備安裝工程施工與驗收規范
- 配用電通信技術及產業發展報告
- DL/T 5503-2015 直流換流站施工圖設計內容深度規定
- GB/T51050-2014鋼鐵企業能源計量和監測工程技術規范(英文版)
- GB 51179-2016 煤礦井下煤炭運輸設計規范
- 石油化工廠際管道工程技術標準
- GB 51284-2018 煙氣脫硫工藝設計規范
- Rhinoceros三維產品建模及后期處理
- GB50397-2007冶金電氣設備工程安裝驗收規范(英文版)
- 沖壓加工技能培訓與操作實踐
- GB/T 51242-2017 同步數字體系(SDH)光纖傳輸系統工程設計規范