- DL/T5210.3-2009電力建設(shè)施工質(zhì)量驗收及評價規(guī)程第3部分:汽輪發(fā)電機組(英文版)
- 電力企業(yè)聯(lián)合會
- 1001字
- 2020-09-24 18:17:01
4.2 Construction Quality Acceptance Scope Division and General Table
4.2.1 The scope of construction quality acceptance shall be divided according to inspection batch,subitem project,subsection project and unit project,and comply with Table 4.2.1.
Table 4.2.1 Division of scope of construction quality acceptance

Table 4.2.1(Continued)

Table 4.2.1(Continued)

Table 4.2.1(Continued)

Table 4.2.1(Continued)

Table 4.2.1(Continued)

Table 4.2.1(Continued)

Table 4.2.1(Continued)

Table 4.2.1(Continued)

Table 4.2.1(Continued)

Table 4.2.1(Continued)

Table 4.2.1(Continued)

Table 4.2.1(Continued)

Table 4.2.1(Continued)

Table 4.2.1(Continued)

Table 4.2.1(Continued)

Table 4.2.1(Continued)

Table 4.2.1(Continued)

Table 4.2.1(Continued)

Table 4.2.1(Continued)

Table 4.2.1(Continued)

Table 4.2.1(Continued)

Table 4.2.1(Continued)

Table 4.2.1(Continued)

Table 4.2.1(Continued)

Table 4.2.1(Continued)

Table 4.2.1(Continued)

Table 4.2.1(Continued)

Table 4.2.1(Continued)

Table 4.2.1(Continued)

Table 4.2.1(Continued)

Table 4.2.1(Continued)

Table 4.2.1(Continued)

Table 4.2.1(Continued)

Table 4.2.1(Continued)

Table 4.2.1(Continued)

Table 4.2.1(Continued)

Table 4.2.1(Continued)

Table 4.2.1(Continued)

Table 4.2.1(Continued)

4.2.2 During construction and inspection of unit project,inspection shall be made on the unit project construction management.And the inspection results shall be filled in Table 4.2.2.
Table 4.2.2 ( ?。㊣nspection record for unit project construction management

Table 4.2.2(Continued)

4.2.3 For unit project acceptance,the information listed in Table 4.2.3 shall be checked;records for check results shall be complete and comply with file management rules.
Table 4.2.3 ( ?。〤hecklist for unit project quality control documents

4.2.4 The design change and material substitute notices shall be numbered,registered and attached on the registration form.The registration forms for unit project design change and material substitute notices shall comply with Table 4.2.4.
Table 4.2.4?。ā 。︰nit project design change and material substitute notice registration form

Table 4.2.4(Continued)

4.2.5 The equipment and material ex-factory test reports and quality certificates shall be numbered,registered and attached on the registration form.The registration forms for unit project equipment and material ex-factory test reports and quality certificates shall comply with Table 4.2.5.
Table 4.2.5 ( )Unit project equipment and material ex-work test reports and quality certificates registration form

4.2.6 After equipment defectives are discovered,construction contractor,supervisor,manufacture organization and Owner shall inspect and confirm and handle equipment defective notice,the filling of which shall comply with Table 4.2.6.
Table 4.2.6 Equipment defective notice

4.2.7 After equipment defective treatment,the responsible organization shall notify relevant organizations for inspection and acceptance who shall also provide acceptance comments and signature on the equipment defective treatment report sheet that shall be filled in accordance with Table 4.2.7.
Table 4.2.7 Equipment defective treatment report sheet

Table 4.2.7(Continued)

4.2.8 Measuring devices for construction measurement must be inspected and used in calibration validity period.The measuring devices used in construction must be registered according to Table 4.2.8.Supervision engineer shall make inspection and confirmation on the registered measuring devices.
Table 4.2.8 Registration form for meters used in( )unit project

4.2.9 The inspection batch construction quality shall be inspected and accepted according to quality standard for the inspection items and the inspection batch construction quality acceptance table shall be filled.According to quality acceptance scope division table 4.2.1,if“dominant”is not filled in the column of property,it indicates“ordinary”and“/”is marked in the acceptance signature column of items not in the acceptance scope.The inspection batch construction quality acceptance shall comply with Table 4.2.9.
Table 4.2.9?。ā 。㊣nspection batch construction quality acceptance table

4.2.10 The subitem project quality shall be accepted according to Table 4.2.10 and subitem project construction quality acceptance table shall be filled.According to quality acceptance scope division table 4.2.1,“/”is marked in the signature column of items not in the acceptance scope.
Table 4.2.10 ( ?。㏒ubitem project construction auality acceptance table

4.2.11 The subsection project quality shall be accepted according to Table 4.2.11 and subsection project construction quality acceptance table shall be filled.According to quality acceptance scope division table 4.2.1,“/”is marked in the signature column of items not in the acceptance scope.
Table 4.2.11?。ā 。㏒ubsection project quality acceptance table

4.2.12 The unit project quality shall be accepted according to Table 4.2.12 and unit project construction quality acceptance table shall be filled.According to quality acceptance scope division table 4.2.1,“/”is marked in the signature column of items not in the acceptance scope.
Table 4.2.12?。ā 。︰nit project quality acceptance table

4.2.13 The acceptance certificate,record,mandatory provision implementation for ST generator unit erection works quality control points are given in Table 4.2.13.The implementation is subject to change according to actual conditions.
Table 4.2.13 Inspection items for acceptance certificate,record,mandatory provision implementation for ST generator unit erection works quality control points

Table 4.2.13(Continued)

Table 4.2.13(Continued)

Table 4.2.13(Continued)

Table 4.2.13(Continued)

Table 4.2.13(Continued)

Table 4.2.13(Continued)

Table 4.2.13(Continued)

Table 4.2.13(Continued)

Table 4.2.13(Continued)

Table 4.2.13(Continued)

Table 4.2.13(Continued)

Table 4.2.13(Continued)

Table 4.2.13(Continued)

Table 4.2.13(Continued)

Table 4.2.13(Continued)

Table 4.2.13(Continued)

Table 4.2.13(Continued)

Table 4.2.13(Continued)

Table 4.2.13(Continued)

Table 4.2.13(Continued)

Table 4.2.13(Continued)

- GB50551-2010球團機械設(shè)備安裝工程質(zhì)量驗收規(guī)范(英文版)
- 健康座椅
- GB/T51167-2016海底光纜工程驗收規(guī)范(英文版)
- 配用電通信技術(shù)及產(chǎn)業(yè)發(fā)展報告
- GB/T51075-2015選礦機械設(shè)備工程安裝規(guī)范(英文版)
- GB/T 51257-2017 液化天然氣低溫管道設(shè)計規(guī)范
- GB 51221-2017 城鎮(zhèn)污水處理廠工程施工規(guī)范
- GB 50471-2018 煤礦瓦斯抽采工程設(shè)計標準
- GB 51220-2017 生活垃圾衛(wèi)生填埋場封場技術(shù)規(guī)范
- DL/T 5221-2016 城市電力電纜線路設(shè)計技術(shù)規(guī)定
- 水泥工廠環(huán)境保護設(shè)施設(shè)計標準
- GB/T 51238-2018 巖溶地區(qū)建筑地基基礎(chǔ)技術(shù)標準
- GB 51162-2016 重型結(jié)構(gòu)和設(shè)備整體提升技術(shù)規(guī)范
- GB/T 51250-2017 微電網(wǎng)接入配電網(wǎng)系統(tǒng)調(diào)試與驗收規(guī)范
- GB50830-2013冶金礦山采礦設(shè)計規(guī)范(英文版)